{"id":"https://openalex.org/W7225614019","doi":"https://doi.org/10.6084/m9.figshare.34961680","title":"Powering Uganda's Transformation: Structure, Constraints, Pricing and Financing in the Electricity Sub-Sector","display_name":"Powering Uganda's Transformation: Structure, Constraints, Pricing and Financing in the Electricity Sub-Sector","publication_year":2026,"publication_date":"2026-11-09","ids":{"openalex":"https://openalex.org/W7225614019","doi":"https://doi.org/10.6084/m9.figshare.34961680"},"language":"en","primary_location":{"id":"doi:10.6084/m9.figshare.34961680","doi":"https://doi.org/10.6084/m9.figshare.34961680","is_oa":true,"landing_page_url":"https://doi.org/10.6084/m9.figshare.34961680","pdf_url":null,"source":{"id":"https://openalex.org/S4377196282","display_name":"Figshare","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/I4210132348","host_organization_name":"Figshare (United Kingdom)","host_organization_lineage":["https://openalex.org/I4210132348"],"host_organization_lineage_names":[],"type":"repository"},"license":"cc-by","license_id":"https://openalex.org/licenses/cc-by","version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":"JournalArticle"},"volume":null,"type":"article","is_traditional":true,"indexed_in":["datacite"],"open_access":{"is_oa":true,"oa_status":"green","oa_url":"https://doi.org/10.6084/m9.figshare.34961680","any_repository_has_fulltext":true},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5161332111","display_name":"Mark Washaki","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Mark Washaki","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":["https://openalex.org/A5161332111"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.0,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T12271","display_name":"Renewable energy and sustainable power systems","score":0.9545999765396118,"subfield":{"id":"https://openalex.org/subfields/2105","display_name":"Renewable Energy, Sustainability and the Environment"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T12271","display_name":"Renewable energy and sustainable power systems","score":0.9545999765396118,"subfield":{"id":"https://openalex.org/subfields/2105","display_name":"Renewable Energy, Sustainability and the Environment"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.026000000536441803,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12129","display_name":"Global Energy Security and Policy","score":0.003800000064074993,"subfield":{"id":"https://openalex.org/subfields/2100","display_name":"General Energy"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[],"concepts":[{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.7202000021934509},{"id":"https://openalex.org/C2778324724","wikidata":"https://www.wikidata.org/wiki/Q1076056","display_name":"Electrification","level":3,"score":0.7024999856948853},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.5597000122070312},{"id":"https://openalex.org/C41866144","wikidata":"https://www.wikidata.org/wiki/Q202398","display_name":"Industrialisation","level":2,"score":0.5397999882698059},{"id":"https://openalex.org/C57101690","wikidata":"https://www.wikidata.org/wiki/Q2356921","display_name":"Electricity retailing","level":4,"score":0.522599995136261},{"id":"https://openalex.org/C521751864","wikidata":"https://www.wikidata.org/wiki/Q1729207","display_name":"Christian ministry","level":2,"score":0.5164999961853027},{"id":"https://openalex.org/C2778137410","wikidata":"https://www.wikidata.org/wiki/Q2732820","display_name":"Government (linguistics)","level":2,"score":0.46889999508857727},{"id":"https://openalex.org/C10138342","wikidata":"https://www.wikidata.org/wiki/Q43015","display_name":"Finance","level":1,"score":0.46779999136924744},{"id":"https://openalex.org/C30772137","wikidata":"https://www.wikidata.org/wiki/Q5164762","display_name":"Consumption (sociology)","level":2,"score":0.4498000144958496},{"id":"https://openalex.org/C184773241","wikidata":"https://www.wikidata.org/wiki/Q387400","display_name":"Mains electricity","level":3,"score":0.42250001430511475},{"id":"https://openalex.org/C40700","wikidata":"https://www.wikidata.org/wiki/Q1411783","display_name":"Industrial organization","level":1,"score":0.420199990272522},{"id":"https://openalex.org/C146733006","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Electricity market","level":3,"score":0.41589999198913574},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.3977000117301941},{"id":"https://openalex.org/C2777276756","wikidata":"https://www.wikidata.org/wiki/Q5196446","display_name":"Customer base","level":2,"score":0.3668000102043152},{"id":"https://openalex.org/C423512","wikidata":"https://www.wikidata.org/wiki/Q383973","display_name":"Electricity generation","level":3,"score":0.3580000102519989},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.3555999994277954},{"id":"https://openalex.org/C54750564","wikidata":"https://www.wikidata.org/wiki/Q26643","display_name":"Commerce","level":1,"score":0.35429999232292175},{"id":"https://openalex.org/C2778970885","wikidata":"https://www.wikidata.org/wiki/Q3587607","display_name":"Rural electrification","level":4,"score":0.3434999883174896},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.3416000008583069},{"id":"https://openalex.org/C29592376","wikidata":"https://www.wikidata.org/wiki/Q206799","display_name":"Electric energy","level":3,"score":0.33629998564720154},{"id":"https://openalex.org/C170777988","wikidata":"https://www.wikidata.org/wiki/Q2316331","display_name":"Electric power industry","level":3,"score":0.32190001010894775},{"id":"https://openalex.org/C110121322","wikidata":"https://www.wikidata.org/wiki/Q865811","display_name":"Distribution (mathematics)","level":2,"score":0.3176000118255615},{"id":"https://openalex.org/C2779280359","wikidata":"https://www.wikidata.org/wiki/Q870344","display_name":"Electricity pricing","level":4,"score":0.3142000138759613},{"id":"https://openalex.org/C71554815","wikidata":"https://www.wikidata.org/wiki/Q200974","display_name":"Nameplate capacity","level":4,"score":0.3037000000476837},{"id":"https://openalex.org/C2781398798","wikidata":"https://www.wikidata.org/wiki/Q2516426","display_name":"Ministry of Transport","level":2,"score":0.302700012922287},{"id":"https://openalex.org/C2780165032","wikidata":"https://www.wikidata.org/wiki/Q16869822","display_name":"Energy consumption","level":2,"score":0.2924000024795532},{"id":"https://openalex.org/C186370098","wikidata":"https://www.wikidata.org/wiki/Q442787","display_name":"Energy (signal processing)","level":2,"score":0.2856000065803528},{"id":"https://openalex.org/C136264566","wikidata":"https://www.wikidata.org/wiki/Q159810","display_name":"Economy","level":1,"score":0.2768999934196472},{"id":"https://openalex.org/C2777819126","wikidata":"https://www.wikidata.org/wiki/Q1326624","display_name":"Electric utility","level":2,"score":0.27549999952316284},{"id":"https://openalex.org/C2985347565","wikidata":"https://www.wikidata.org/wiki/Q2151621","display_name":"Energy sector","level":2,"score":0.2703000009059906},{"id":"https://openalex.org/C206888370","wikidata":"https://www.wikidata.org/wiki/Q844861","display_name":"Electric power distribution","level":3,"score":0.25209999084472656}],"mesh":[],"locations_count":2,"locations":[{"id":"doi:10.6084/m9.figshare.34961680","doi":"https://doi.org/10.6084/m9.figshare.34961680","is_oa":true,"landing_page_url":"https://doi.org/10.6084/m9.figshare.34961680","pdf_url":null,"source":{"id":"https://openalex.org/S4377196282","display_name":"Figshare","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/I4210132348","host_organization_name":"Figshare (United Kingdom)","host_organization_lineage":["https://openalex.org/I4210132348"],"host_organization_lineage_names":[],"type":"repository"},"license":"cc-by","license_id":"https://openalex.org/licenses/cc-by","version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":"JournalArticle"},{"id":"doi:10.6084/m9.figshare.34961680.v1","doi":"https://doi.org/10.6084/m9.figshare.34961680.v1","is_oa":true,"landing_page_url":"https://doi.org/10.6084/m9.figshare.34961680.v1","pdf_url":null,"source":{"id":"https://openalex.org/S4377196282","display_name":"Figshare","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/I4210132348","host_organization_name":"Figshare (United Kingdom)","host_organization_lineage":["https://openalex.org/I4210132348"],"host_organization_lineage_names":[],"type":"repository"},"license":"cc-by","license_id":"https://openalex.org/licenses/cc-by","version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":"JournalArticle"}],"best_oa_location":{"id":"doi:10.6084/m9.figshare.34961680","doi":"https://doi.org/10.6084/m9.figshare.34961680","is_oa":true,"landing_page_url":"https://doi.org/10.6084/m9.figshare.34961680","pdf_url":null,"source":{"id":"https://openalex.org/S4377196282","display_name":"Figshare","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/I4210132348","host_organization_name":"Figshare (United Kingdom)","host_organization_lineage":["https://openalex.org/I4210132348"],"host_organization_lineage_names":[],"type":"repository"},"license":"cc-by","license_id":"https://openalex.org/licenses/cc-by","version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":"JournalArticle"},"sustainable_development_goals":[],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":[],"abstract_inverted_index":{"Electricity":[0],"is":[1,36,40,66],"the":[2,50,55,58,69,79,91,113,122,128],"binding":[3],"input":[4],"for":[5],"Uganda's":[6],"industrialization":[7],"and":[8,28,46,57,65,86,94,107],"value-addition":[9],"agenda.":[10],"The":[11,38],"Ministry":[12],"of":[13],"Energy":[14],"has":[15],"acknowledged":[16],"that":[17],"installed":[18],"capacity,":[19],"though":[20],"much":[21],"improved,":[22],"remains":[23],"below":[24],"what":[25,95,112],"industrialization,":[26],"e-mobility":[27],"transport":[29],"electrification":[30],"would":[31],"require":[32],"once":[33],"suppressed":[34],"demand":[35],"released.":[37],"sector":[39,114],"therefore":[41],"both":[42],"a":[43,47],"success":[44],"story":[45],"cautionary":[48],"tale.":[49],"country-built":[51],"generation":[52],"faster":[53],"than":[54],"grid":[56],"customer":[59],"base":[60],"needed":[61],"to":[62],"absorb":[63],"it":[64,77,89,102,110],"now":[67],"managing":[68],"fiscal":[70],"consequences.This":[71],"paper":[72],"pursues":[73],"four":[74],"aims.":[75],"First,":[76],"describes":[78],"sector's":[80],"structure":[81],"across":[82],"generation,":[83],"transmission,":[84],"distribution":[85],"regulation.":[87],"Second,":[88],"identifies":[90],"main":[92],"challenges":[93],"should":[96,115],"be":[97],"done":[98],"about":[99],"them.":[100],"Third,":[101],"examines":[103],"consumer":[104],"pricing,":[105],"policy":[106],"financing.":[108],"Fourth,":[109],"sketches":[111],"look":[116],"like":[117],"by":[118],"2040.":[119],"Recommendations":[120],"are":[121],"author's":[123],"own":[124],"analysis,":[125],"built":[126],"on":[127],"cited":[129],"evidence.":[130]},"counts_by_year":[],"updated_date":"2026-11-10T13:44:29.811591","created_date":"2026-11-10T00:00:00"}
