{"id":"https://openalex.org/W7163865249","doi":"https://doi.org/10.31387/oscm0660527","title":"Enhancing Productivity in PCB Assembly through Low-Cost Automation: A Kaizen-Driven Case Study","display_name":"Enhancing Productivity in PCB Assembly through Low-Cost Automation: A Kaizen-Driven Case Study","publication_year":2026,"publication_date":"2026-05-15","ids":{"openalex":"https://openalex.org/W7163865249","doi":"https://doi.org/10.31387/oscm0660527"},"language":"en","primary_location":{"id":"doi:10.31387/oscm0660527","doi":"https://doi.org/10.31387/oscm0660527","is_oa":true,"landing_page_url":"https://doi.org/10.31387/oscm0660527","pdf_url":"https://journal.oscm-forum.org/journal/journal/download/20260605063722_oscm-2026-enhancing-productivity-in-pcb-assembly-through-low-cost-automation.pdf","source":{"id":"https://openalex.org/S4210226436","display_name":"Operations and Supply Chain Management An International Journal","issn_l":"2579-9363","issn":["2579-9363"],"is_oa":true,"is_in_doaj":false,"is_core":true,"listed_in":["cwts-core","poland-20","russia-white-list-2"],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Operations and Supply Chain Management: An International Journal","raw_type":"journal-article"},"volume":null,"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":true,"oa_status":"diamond","oa_url":"https://journal.oscm-forum.org/journal/journal/download/20260605063722_oscm-2026-enhancing-productivity-in-pcb-assembly-through-low-cost-automation.pdf","any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5069546034","display_name":"Thitima Wonginta","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I129488602","display_name":"Burapha University","ror":"https://ror.org/01ff74m36","country_code":"TH","type":"education","lineage":["https://openalex.org/I129488602"]}],"countries":["TH"],"is_corresponding":false,"raw_author_name":"Thitima Wonginta","raw_affiliation_strings":["Logistics and Supply Chain Management, Faculty of Logistics, Burapha University, Chonburi, Thailand"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Logistics and Supply Chain Management, Faculty of Logistics, Burapha University, Chonburi, Thailand","institution_ids":["https://openalex.org/I129488602"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5138154509","display_name":"Jenjira Sae-Aung","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I129488602","display_name":"Burapha University","ror":"https://ror.org/01ff74m36","country_code":"TH","type":"education","lineage":["https://openalex.org/I129488602"]}],"countries":["TH"],"is_corresponding":false,"raw_author_name":"Jenjira Sae-Aung","raw_affiliation_strings":["Logistics and Supply Chain Management, Faculty of Logistics, Burapha University, Chonburi, Thailand"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Logistics and Supply Chain Management, Faculty of Logistics, Burapha University, Chonburi, Thailand","institution_ids":["https://openalex.org/I129488602"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5092068660","display_name":"Thitinan Pholsook","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I82475049","display_name":"Suranaree University of Technology","ror":"https://ror.org/05sgb8g78","country_code":"TH","type":"education","lineage":["https://openalex.org/I82475049"]}],"countries":["TH"],"is_corresponding":false,"raw_author_name":"Thitinan Pholsook","raw_affiliation_strings":["School of Transportation Engineering, Institute of Engineering, Suranaree University of Technology, Nakhon Ratchasima, Thailand"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Transportation Engineering, Institute of Engineering, Suranaree University of Technology, Nakhon Ratchasima, Thailand","institution_ids":["https://openalex.org/I82475049"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":true,"cited_by_count":0,"citation_normalized_percentile":{"value":0.33614555,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"19","issue":"3","first_page":"381","last_page":"389"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T13706","display_name":"Management and Optimization Techniques","score":0.5210000276565552,"subfield":{"id":"https://openalex.org/subfields/1408","display_name":"Strategy and Management"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},"topics":[{"id":"https://openalex.org/T13706","display_name":"Management and Optimization Techniques","score":0.5210000276565552,"subfield":{"id":"https://openalex.org/subfields/1408","display_name":"Strategy and Management"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T10164","display_name":"Quality and Supply Management","score":0.43140000104904175,"subfield":{"id":"https://openalex.org/subfields/1404","display_name":"Management Information Systems"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T10763","display_name":"Digital Transformation in Industry","score":0.01769999973475933,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/printed-circuit-board-assembly","display_name":"printed circuit board assembly","score":0.9049999713897705},{"id":"https://openalex.org/keywords/low-cost-automation","display_name":"low-cost automation","score":0.9399999976158142},{"id":"https://openalex.org/keywords/kaizen","display_name":"Kaizen","score":0.9789999723434448},{"id":"https://openalex.org/keywords/adhesive-dispensing","display_name":"adhesive dispensing","score":0.6850000023841858},{"id":"https://openalex.org/keywords/cycle-time-reduction","display_name":"cycle time reduction","score":0.7549999952316284},{"id":"https://openalex.org/keywords/ecrs-analysis","display_name":"ECRS analysis","score":0.6880000233650208},{"id":"https://openalex.org/keywords/toyota-production-system","display_name":"Toyota Production System","score":0.8059999942779541},{"id":"https://openalex.org/keywords/lean-manufacturing","display_name":"lean manufacturing","score":0.7739999890327454},{"id":"https://openalex.org/keywords/production-capacity","display_name":"production capacity","score":0.597000002861023},{"id":"https://openalex.org/keywords/small-and-medium-sized-enterprises","display_name":"small and medium-sized enterprises","score":0.8519999980926514},{"id":"https://openalex.org/keywords/cost-reduction","display_name":"cost reduction","score":0.5770000219345093}],"concepts":[{"id":"https://openalex.org/C2780513914","wikidata":"https://www.wikidata.org/wiki/Q18210350","display_name":"Bottleneck","level":2,"score":0.796500027179718},{"id":"https://openalex.org/C2776600044","wikidata":"https://www.wikidata.org/wiki/Q376444","display_name":"Kaizen","level":3,"score":0.6498000025749207},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.5435000061988831},{"id":"https://openalex.org/C204983608","wikidata":"https://www.wikidata.org/wiki/Q2111958","display_name":"Productivity","level":2,"score":0.5383999943733215},{"id":"https://openalex.org/C115901376","wikidata":"https://www.wikidata.org/wiki/Q184199","display_name":"Automation","level":2,"score":0.5274999737739563},{"id":"https://openalex.org/C153083717","wikidata":"https://www.wikidata.org/wiki/Q6535263","display_name":"Leverage (statistics)","level":2,"score":0.515500009059906},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.4616999924182892},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.41780000925064087},{"id":"https://openalex.org/C137335462","wikidata":"https://www.wikidata.org/wiki/Q380772","display_name":"Lean manufacturing","level":2,"score":0.4099000096321106},{"id":"https://openalex.org/C157764524","wikidata":"https://www.wikidata.org/wiki/Q1383412","display_name":"Throughput","level":3,"score":0.39730000495910645},{"id":"https://openalex.org/C99862985","wikidata":"https://www.wikidata.org/wiki/Q10858068","display_name":"Production line","level":2,"score":0.39149999618530273},{"id":"https://openalex.org/C175700187","wikidata":"https://www.wikidata.org/wiki/Q187939","display_name":"Manufacturing","level":2,"score":0.37369999289512634},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.3702000081539154},{"id":"https://openalex.org/C98045186","wikidata":"https://www.wikidata.org/wiki/Q205663","display_name":"Process (computing)","level":2,"score":0.3686000108718872},{"id":"https://openalex.org/C2992893776","wikidata":"https://www.wikidata.org/wiki/Q955421","display_name":"Capital equipment","level":2,"score":0.33239999413490295},{"id":"https://openalex.org/C2985463315","wikidata":"https://www.wikidata.org/wiki/Q932586","display_name":"Production cycle","level":2,"score":0.31380000710487366},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.31200000643730164},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.3077999949455261},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.3046000003814697},{"id":"https://openalex.org/C185798385","wikidata":"https://www.wikidata.org/wiki/Q1161707","display_name":"Benchmark (surveying)","level":2,"score":0.3010999858379364},{"id":"https://openalex.org/C138331895","wikidata":"https://www.wikidata.org/wiki/Q11650","display_name":"Electronics","level":2,"score":0.2985999882221222},{"id":"https://openalex.org/C13166094","wikidata":"https://www.wikidata.org/wiki/Q1597271","display_name":"Capacity utilization","level":2,"score":0.2890999913215637},{"id":"https://openalex.org/C174998907","wikidata":"https://www.wikidata.org/wiki/Q357662","display_name":"Work in process","level":2,"score":0.28769999742507935},{"id":"https://openalex.org/C189560676","wikidata":"https://www.wikidata.org/wiki/Q1187906","display_name":"Profit margin","level":2,"score":0.2858999967575073},{"id":"https://openalex.org/C206345919","wikidata":"https://www.wikidata.org/wiki/Q20380951","display_name":"Resource (disambiguation)","level":2,"score":0.2856999933719635},{"id":"https://openalex.org/C151355145","wikidata":"https://www.wikidata.org/wiki/Q4357466","display_name":"Productivity model","level":4,"score":0.2831999957561493},{"id":"https://openalex.org/C2776043813","wikidata":"https://www.wikidata.org/wiki/Q1759113","display_name":"Batch production","level":2,"score":0.2752000093460083},{"id":"https://openalex.org/C135909481","wikidata":"https://www.wikidata.org/wiki/Q17092930","display_name":"Production manager","level":3,"score":0.2743000090122223},{"id":"https://openalex.org/C2778820799","wikidata":"https://www.wikidata.org/wiki/Q3454688","display_name":"Cost reduction","level":2,"score":0.2619999945163727},{"id":"https://openalex.org/C2775914053","wikidata":"https://www.wikidata.org/wiki/Q18979","display_name":"Kanban","level":3,"score":0.26089999079704285},{"id":"https://openalex.org/C21457203","wikidata":"https://www.wikidata.org/wiki/Q4056293","display_name":"Process automation system","level":3,"score":0.2565999925136566},{"id":"https://openalex.org/C144559511","wikidata":"https://www.wikidata.org/wiki/Q2986279","display_name":"Principal (computer security)","level":2,"score":0.2533999979496002},{"id":"https://openalex.org/C18762648","wikidata":"https://www.wikidata.org/wiki/Q42213","display_name":"Work (physics)","level":2,"score":0.2533000111579895},{"id":"https://openalex.org/C2780682718","wikidata":"https://www.wikidata.org/wiki/Q16321575","display_name":"Production control","level":3,"score":0.2531000077724457}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.31387/oscm0660527","doi":"https://doi.org/10.31387/oscm0660527","is_oa":true,"landing_page_url":"https://doi.org/10.31387/oscm0660527","pdf_url":"https://journal.oscm-forum.org/journal/journal/download/20260605063722_oscm-2026-enhancing-productivity-in-pcb-assembly-through-low-cost-automation.pdf","source":{"id":"https://openalex.org/S4210226436","display_name":"Operations and Supply Chain Management An International Journal","issn_l":"2579-9363","issn":["2579-9363"],"is_oa":true,"is_in_doaj":false,"is_core":true,"listed_in":["cwts-core","poland-20","russia-white-list-2"],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Operations and Supply Chain Management: An International Journal","raw_type":"journal-article"}],"best_oa_location":{"id":"doi:10.31387/oscm0660527","doi":"https://doi.org/10.31387/oscm0660527","is_oa":true,"landing_page_url":"https://doi.org/10.31387/oscm0660527","pdf_url":"https://journal.oscm-forum.org/journal/journal/download/20260605063722_oscm-2026-enhancing-productivity-in-pcb-assembly-through-low-cost-automation.pdf","source":{"id":"https://openalex.org/S4210226436","display_name":"Operations and Supply Chain Management An International Journal","issn_l":"2579-9363","issn":["2579-9363"],"is_oa":true,"is_in_doaj":false,"is_core":true,"listed_in":["cwts-core","poland-20","russia-white-list-2"],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Operations and Supply Chain Management: An International Journal","raw_type":"journal-article"},"sustainable_development_goals":[{"score":1.0,"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure"},{"score":0.833299994468689,"id":"https://metadata.un.org/sdg/8","display_name":"Decent work and economic growth"},{"score":0.807699978351593,"id":"https://metadata.un.org/sdg/12","display_name":"Responsible consumption and production"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"grobid_xml":true,"pdf":true},"content_urls":{"pdf":"https://content.openalex.org/works/W7163865249.pdf","grobid_xml":"https://content.openalex.org/works/W7163865249.grobid-xml"},"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W7165729665","https://openalex.org/W4393328013","https://openalex.org/W7067258549","https://openalex.org/W7169807268","https://openalex.org/W4415839669","https://openalex.org/W7219582703","https://openalex.org/W7117390448","https://openalex.org/W2069840282","https://openalex.org/W7219228413","https://openalex.org/W4313408764"],"abstract_inverted_index":{"In":[0],"the":[1,55,85,97,105,140,176],"highly":[2],"competitive":[3],"global":[4],"electronics":[5],"sector,":[6],"manufacturing":[7],"productivity":[8,215],"is":[9,52,193],"paramount.":[10],"Manual":[11],"processes":[12],"within":[13],"otherwise":[14],"automated":[15,124],"assembly":[16,39],"lines":[17],"frequently":[18],"become":[19],"critical":[20],"bottlenecks,":[21],"constraining":[22],"throughput":[23],"and":[24,57,104,179,224,229,233],"hindering":[25],"growth.":[26],"This":[27,161,189],"research":[28],"presents":[29],"a":[30,34,45,60,69,81,122,134,199,222],"case":[31,87],"study":[32,88],"of":[33,59,84,93,186,197,201],"Printed":[35],"Circuit":[36],"Board":[37],"(PCB)":[38],"facility":[40],"in":[41,73,137,166],"Thailand":[42],"that":[43],"faced":[44],"significant":[46,214],"capacity":[47,169],"shortfall.":[48],"The":[49,78,112,131],"primary":[50],"objective":[51],"to":[53,67,154,170,212],"analyze":[54],"implementation":[56],"impact":[58],"Kaizen-driven,":[61],"low-cost":[62],"automation":[63],"(LCA)":[64],"solution":[65],"designed":[66],"resolve":[68],"specific":[70],"manual":[71],"bottleneck":[72,141],"an":[74,164,181],"adhesive":[75],"application":[76],"process.":[77],"methodology":[79],"combines":[80],"detailed":[82],"analysis":[83],"industrial":[86],"with":[89,205],"established":[90],"theoretical":[91],"frameworks":[92],"lean":[94],"manufacturing,":[95],"including":[96],"Toyota":[98],"Production":[99],"System":[100],"(TPS),":[101],"time":[102,144],"study,":[103],"ECRS":[106],"(Eliminate,":[107],"Combine,":[108],"Rearrange,":[109],"Simplify)":[110],"principles.":[111],"intervention,":[113],"executed":[114],"through":[115],"three":[116],"iterative":[117],"Kaizen":[118],"cycles,":[119],"involved":[120],"developing":[121],"custom":[123],"dispensing":[125],"machine":[126],"using":[127],"repurposed,":[128],"on-site":[129],"assets.":[130],"results":[132],"demonstrate":[133],"profound":[135],"improvement":[136],"operational":[138],"performance:":[139],"process":[142],"cycle":[143],"was":[145],"reduced":[146],"by":[147],"73.6%,":[148],"from":[149],"11":[150],"minutes":[151,156],"53":[152],"seconds":[153,158],"3":[155],"8":[157],"per":[159,173],"unit.":[160],"directly":[162],"enabled":[163],"increase":[165],"total":[167],"production":[168],"245":[171],"units":[172],"week,":[174],"exceeding":[175],"demand":[177],"target":[178],"yielding":[180],"estimated":[182],"annual":[183],"cost":[184],"saving":[185],"98,700":[187],"THB.":[188],"study's":[190],"principal":[191],"contribution":[192],"its":[194],"empirical":[195],"demonstration":[196],"how":[198],"culture":[200],"continuous":[202],"improvement,":[203],"coupled":[204],"creative":[206],"problem-solving,":[207],"can":[208],"leverage":[209],"existing":[210],"resources":[211],"achieve":[213],"gains":[216],"without":[217],"substantial":[218],"capital":[219],"investment,":[220],"offering":[221],"viable":[223],"practical":[225],"model":[226],"for":[227],"small":[228],"medium-sized":[230],"enterprises":[231],"(SMEs)":[232],"other":[234],"resource-constrained":[235],"manufacturers.":[236]},"counts_by_year":[],"updated_date":"2026-10-28T10:33:24.094632","created_date":"2026-06-09T00:00:00"}
