{"id":"https://openalex.org/W7127083649","doi":"https://doi.org/10.1109/ic2ecs68700.2025.11362123","title":"Research on Multi-Scenario Scheduling Optimization Method for Virtual Power Plant Equipment Based on Association Rules","display_name":"Research on Multi-Scenario Scheduling Optimization Method for Virtual Power Plant Equipment Based on Association Rules","alternate_titles":[],"publication_year":2025,"publication_date":"2025-12-05","ids":{"openalex":"https://openalex.org/W7127083649","doi":"https://doi.org/10.1109/ic2ecs68700.2025.11362123"},"language":"en","primary_location":{"id":"doi:10.1109/ic2ecs68700.2025.11362123","doi":"https://doi.org/10.1109/ic2ecs68700.2025.11362123","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ic2ecs68700.2025.11362123","pdf_url":null,"source":{"id":"https://openalex.org/S7407088621","display_name":"International Conference on Electrical Engineering and Control Science (IC2ECS)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2025 5th International Conference on Electrical Engineering and Control Science (IC2ECS)","raw_type":"proceedings-article"},"parent_works":[],"lineage":["https://openalex.org/W7127083649"],"child_works_count":0,"type":"conference-paper","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":null,"display_name":"Liang Cao","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4405273203","display_name":"State Grid Shanghai Municipal Electric Power Company (China)","ror":"https://ror.org/05faa4c07","country_code":"CN","type":"company","lineage":["https://openalex.org/I4405273203"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Liang Cao","raw_affiliation_strings":["State Grid Shanghai Electric Power Company Pudong New District,Shanghai,China,200122"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Shanghai Electric Power Company Pudong New District,Shanghai,China,200122","institution_ids":["https://openalex.org/I4405273203"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5006338920","display_name":"Xiaoyong Xu","orcid":"https://orcid.org/0000-0001-6344-722X","observed_orcids":["https://orcid.org/0000-0001-6344-722X"]},"institutions":[{"id":"https://openalex.org/I4405273203","display_name":"State Grid Shanghai Municipal Electric Power Company (China)","ror":"https://ror.org/05faa4c07","country_code":"CN","type":"company","lineage":["https://openalex.org/I4405273203"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Xiaoyong Xu","raw_affiliation_strings":["State Grid Shanghai Electric Power Company Pudong New District,Shanghai,China,200122"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Shanghai Electric Power Company Pudong New District,Shanghai,China,200122","institution_ids":["https://openalex.org/I4405273203"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5124804325","display_name":"Leting Yu","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4405273203","display_name":"State Grid Shanghai Municipal Electric Power Company (China)","ror":"https://ror.org/05faa4c07","country_code":"CN","type":"company","lineage":["https://openalex.org/I4405273203"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Leting Yu","raw_affiliation_strings":["State Grid Shanghai Electric Power Company Pudong New District,Shanghai,China,200122"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Shanghai Electric Power Company Pudong New District,Shanghai,China,200122","institution_ids":["https://openalex.org/I4405273203"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5050689776","display_name":"Zhenkai He","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4405273203","display_name":"State Grid Shanghai Municipal Electric Power Company (China)","ror":"https://ror.org/05faa4c07","country_code":"CN","type":"company","lineage":["https://openalex.org/I4405273203"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Zhenkai He","raw_affiliation_strings":["State Grid Shanghai Electric Power Company Pudong New District,Shanghai,China,200122"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Shanghai Electric Power Company Pudong New District,Shanghai,China,200122","institution_ids":["https://openalex.org/I4405273203"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I4405273203"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.0,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"135","last_page":"138"},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.3693999946117401,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.3693999946117401,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.3158999979496002,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.2628999948501587,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/virtual-power-plants","display_name":"virtual power plants","score":0.9990000128746033},{"id":"https://openalex.org/keywords/association-rule-mining","display_name":"association rule mining","score":0.9570000171661377},{"id":"https://openalex.org/keywords/confidence","display_name":"confidence","score":0.37599998712539673},{"id":"https://openalex.org/keywords/rolling-optimization","display_name":"rolling optimization","score":0.6650000214576721},{"id":"https://openalex.org/keywords/incentive-costs","display_name":"incentive costs","score":0.8460000157356262},{"id":"https://openalex.org/keywords/renewable-energy-output","display_name":"renewable energy output","score":0.6809999942779541}],"concepts":[{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6378999948501587},{"id":"https://openalex.org/C2776033628","wikidata":"https://www.wikidata.org/wiki/Q785102","display_name":"Virtual power plant","level":4,"score":0.564300000667572},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.4909000098705292},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.46700000762939453},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.412200003862381},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.40689998865127563},{"id":"https://openalex.org/C107568181","wikidata":"https://www.wikidata.org/wiki/Q5319000","display_name":"Dynamic priority scheduling","level":3,"score":0.3813000023365021},{"id":"https://openalex.org/C2777347956","wikidata":"https://www.wikidata.org/wiki/Q1362005","display_name":"Operating cost","level":2,"score":0.3790999948978424},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.37040001153945923},{"id":"https://openalex.org/C2742236","wikidata":"https://www.wikidata.org/wiki/Q924713","display_name":"Efficient energy use","level":2,"score":0.35830000042915344},{"id":"https://openalex.org/C31689143","wikidata":"https://www.wikidata.org/wiki/Q733809","display_name":"Fair-share scheduling","level":3,"score":0.35179999470710754},{"id":"https://openalex.org/C25344961","wikidata":"https://www.wikidata.org/wiki/Q192726","display_name":"Virtual machine","level":2,"score":0.33899998664855957},{"id":"https://openalex.org/C520301825","wikidata":"https://www.wikidata.org/wiki/Q380170","display_name":"Energy conservation","level":2,"score":0.3296999931335449},{"id":"https://openalex.org/C137836250","wikidata":"https://www.wikidata.org/wiki/Q984063","display_name":"Optimization problem","level":2,"score":0.32510000467300415},{"id":"https://openalex.org/C193524817","wikidata":"https://www.wikidata.org/wiki/Q386780","display_name":"Association rule learning","level":2,"score":0.3230000138282776},{"id":"https://openalex.org/C22762622","wikidata":"https://www.wikidata.org/wiki/Q628904","display_name":"Operating point","level":2,"score":0.32269999384880066},{"id":"https://openalex.org/C79403827","wikidata":"https://www.wikidata.org/wiki/Q3988","display_name":"Real-time computing","level":1,"score":0.3212999999523163},{"id":"https://openalex.org/C4311470","wikidata":"https://www.wikidata.org/wiki/Q159719","display_name":"Power station","level":2,"score":0.32100000977516174},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.30720001459121704},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.3025999963283539},{"id":"https://openalex.org/C187633118","wikidata":"https://www.wikidata.org/wiki/Q1317949","display_name":"Economic dispatch","level":4,"score":0.29660001397132874},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.2718000113964081},{"id":"https://openalex.org/C127456818","wikidata":"https://www.wikidata.org/wiki/Q238879","display_name":"Rate-monotonic scheduling","level":4,"score":0.27090001106262207},{"id":"https://openalex.org/C3019966295","wikidata":"https://www.wikidata.org/wiki/Q1341368","display_name":"Energy cost","level":2,"score":0.26159998774528503},{"id":"https://openalex.org/C44154836","wikidata":"https://www.wikidata.org/wiki/Q45045","display_name":"Simulation","level":1,"score":0.2590000033378601},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.25440001487731934},{"id":"https://openalex.org/C186370098","wikidata":"https://www.wikidata.org/wiki/Q442787","display_name":"Energy (signal processing)","level":2,"score":0.25279998779296875}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ic2ecs68700.2025.11362123","doi":"https://doi.org/10.1109/ic2ecs68700.2025.11362123","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ic2ecs68700.2025.11362123","pdf_url":null,"source":{"id":"https://openalex.org/S7407088621","display_name":"International Conference on Electrical Engineering and Control Science (IC2ECS)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2025 5th International Conference on Electrical Engineering and Control Science (IC2ECS)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Affordable and clean energy","score":0.9853000044822693,"id":"https://metadata.un.org/sdg/7"},{"display_name":"Industry, innovation and infrastructure","score":0.7207000255584717,"id":"https://metadata.un.org/sdg/9"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":9,"referenced_works":["https://openalex.org/W4206379665","https://openalex.org/W4283810320","https://openalex.org/W4295308308","https://openalex.org/W4296349254","https://openalex.org/W4323542898","https://openalex.org/W4387519934","https://openalex.org/W4398130879","https://openalex.org/W4399135067","https://openalex.org/W4401009463"],"related_works":["https://openalex.org/W4403183469","https://openalex.org/W3170479104","https://openalex.org/W4363649118","https://openalex.org/W4411233168","https://openalex.org/W4410394728","https://openalex.org/W4403997086","https://openalex.org/W4403183328","https://openalex.org/W4403422884","https://openalex.org/W4407693545","https://openalex.org/W4413467514"],"abstract_inverted_index":{"Most":[0],"scheduling":[1,18,37,83,129],"optimization":[2,38,84,105],"methods":[3,115],"for":[4,40,86],"virtual":[5],"power":[6,177],"plant":[7],"(VPP)":[8],"equipment":[9,42,51,88],"focus":[10],"on":[11,44,103],"a":[12,35,81,126],"single":[13],"scenario,":[14],"resulting":[15],"in":[16,143,154,179,202,223],"low":[17,161,211],"efficiency":[19],"when":[20],"dealing":[21],"with":[22,91,108,226],"the":[23,68,77,92,104,118,132,149,185,189,203,213],"complex":[24],"and":[25,71,98,112,134,160,168,175,198,220],"variable":[26],"operating":[27,52,69,231],"environment":[28],"of":[29,74,94,136,145,181,205],"VPPs.":[30],"To":[31],"address":[32],"this":[33],"issue,":[34],"multi-scenario":[36,82],"method":[39,121],"VPP":[41,87],"based":[43],"association":[45,65,79],"rules":[46],"is":[47,89,163,192,216],"proposed.":[48],"By":[49],"analyzing":[50],"data":[53,113],"under":[54,157,188],"different":[55],"scenarios,":[56],"concepts":[57],"such":[58,116],"as":[59,117],"confidence":[60],"are":[61,122],"used":[62],"to":[63,124],"understand":[64],"rules,":[66,80],"clarifying":[67],"laws":[70],"correlation":[72],"characteristics":[73],"equipment.":[75],"Using":[76],"mined":[78],"model":[85],"constructed":[90],"goals":[93],"minimizing":[95],"economic":[96],"costs":[97],"maximizing":[99],"environmental":[100],"benefits.":[101],"Based":[102],"model,":[106],"combined":[107],"real-time":[109],"scenario":[110,204],"changes":[111],"feedback,":[114],"roulette":[119],"selection":[120],"adopted":[123],"formulate":[125],"rolling":[127],"optimized":[128],"plan,":[130],"ensuring":[131,176],"reliability":[133],"economy":[135],"energy":[137,147,152,174,208],"supply.":[138],"Experimental":[139],"results":[140],"show":[141],"that":[142],"terms":[144,180],"gas":[146,151],"output,":[148],"total":[150],"output":[153,209],"period":[155,225],"1":[156],"high,":[158],"medium,":[159],"scenarios":[162,191],"$150":[164],"\\mathrm{~kW},":[165],"300":[166],"\\mathrm{~kW}$,":[167],"500":[169],"kW":[170],"respectively,":[171],"effectively":[172,229],"utilizing":[173],"supply;":[178],"user":[182],"comfort":[183],"loss,":[184],"average":[186],"loss":[187],"three":[190],"about":[193],"4":[194],"yuan,":[195,197],"6":[196],"8":[199],"yuan":[200,222],"respectively;":[201],"high":[206],"renewable":[207],"+":[210],"load,":[212],"incentive":[214],"cost":[215],"mostly":[217],"between":[218],"50":[219],"150":[221],"each":[224],"small":[227],"fluctuations,":[228],"reducing":[230],"costs.":[232]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W7127083649","counts_by_year":[],"updated_date":"2026-11-14T11:04:58.165337","created_date":"2026-02-03T00:00:00"}
