{"id":"https://openalex.org/W652145288","doi":null,"title":"EXPERIMENTAL ASSESSMENT OF PRESTRESS IN EXISTING BRIDGES. MEASUREMENT OF THE REMAINING PRESTRESS BY LOCAL RELAXATION OF THE STRESSES","display_name":"EXPERIMENTAL ASSESSMENT OF PRESTRESS IN EXISTING BRIDGES. MEASUREMENT OF THE REMAINING PRESTRESS BY LOCAL RELAXATION OF THE STRESSES","publication_year":1997,"publication_date":"1997-01-01","ids":{"openalex":"https://openalex.org/W652145288","mag":"652145288"},"language":"en","primary_location":{"id":"mag:652145288","doi":null,"is_oa":false,"landing_page_url":"https://trid.trb.org/view/716910","pdf_url":null,"source":null,"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":null},"volume":null,"type":"article","indexed_in":[],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5057238980","display_name":"Catherine Doneux","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"C. Doneux","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":["https://openalex.org/A5057238980"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.29804304,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T12940","display_name":"Structural Engineering and Materials Analysis","score":0.9937000274658203,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T12940","display_name":"Structural Engineering and Materials Analysis","score":0.9937000274658203,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13031","display_name":"Civil and Structural Engineering Research","score":0.0031999999191612005,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10534","display_name":"Structural Health Monitoring Techniques","score":0.0013000000035390258,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/prestressed-concrete-bridges","display_name":"prestressed concrete bridges","score":0.9869999885559082},{"id":"https://openalex.org/keywords/stress-relaxation","display_name":"stress relaxation","score":0.7519999742507935},{"id":"https://openalex.org/keywords/existing-bridge-assessment","display_name":"existing bridge assessment","score":0.7689999938011169},{"id":"https://openalex.org/keywords/railway-bridges","display_name":"railway bridges","score":0.9660000205039978},{"id":"https://openalex.org/keywords/stress-measurement","display_name":"stress measurement","score":0.4950000047683716},{"id":"https://openalex.org/keywords/structural-modeling","display_name":"structural modeling","score":0.41600000858306885}],"concepts":[{"id":"https://openalex.org/C66938386","wikidata":"https://www.wikidata.org/wiki/Q633538","display_name":"Structural engineering","level":1,"score":0.7247682809829712},{"id":"https://openalex.org/C100776233","wikidata":"https://www.wikidata.org/wiki/Q2532492","display_name":"Bridge (graph theory)","level":2,"score":0.6319836378097534},{"id":"https://openalex.org/C2780886216","wikidata":"https://www.wikidata.org/wiki/Q465444","display_name":"Prestressed concrete","level":2,"score":0.6108400821685791},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.3733566999435425},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.3010196387767792},{"id":"https://openalex.org/C71924100","wikidata":"https://www.wikidata.org/wiki/Q11190","display_name":"Medicine","level":0,"score":0.0},{"id":"https://openalex.org/C126322002","wikidata":"https://www.wikidata.org/wiki/Q11180","display_name":"Internal medicine","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"mag:652145288","doi":null,"is_oa":false,"landing_page_url":"https://trid.trb.org/view/716910","pdf_url":null,"source":null,"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":null}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure","score":0.5378999710083008}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W4397029520","https://openalex.org/W2569909234","https://openalex.org/W7203893173","https://openalex.org/W7015683416","https://openalex.org/W2900452363","https://openalex.org/W1493832088","https://openalex.org/W641850560","https://openalex.org/W1582131425","https://openalex.org/W7171048495","https://openalex.org/W2365042473"],"abstract_inverted_index":{"One":[0],"of":[1,9,17,30,37,73,80,92,94],"the":[2,7,15,18,28,31,38,49,55,58,64,68,71,74,78,81,95,104],"most":[3],"important":[4],"problems":[5],"in":[6,34,63,86],"assessment":[8],"existing":[10,32,98],"prestressed":[11],"concrete":[12],"bridges":[13,100],"is":[14,24,101],"evaluation":[16],"remaining":[19],"prestress.":[20],"A":[21],"new":[22],"method":[23,96],"proposed,":[25],"based":[26],"on":[27],"measurement":[29],"stresses":[33],"some":[35],"part":[36,45],"bridge":[39],"by":[40,47],"disking":[41],"grooves":[42],"around":[43],"this":[44,53],"and":[46,70],"measuring":[48],"relaxed":[50],"stresses.":[51],"In":[52],"paper,":[54],"proposed":[56],"technique,":[57],"tests":[59],"which":[60,76],"were":[61],"realised":[62],"laboratory":[65],"to":[66,84,97],"validate":[67],"technique":[69],"results":[72],"modelisations":[75],"allows":[77],"definition":[79],"optimum":[82],"parameters":[83],"use":[85],"practice":[87],"are":[88],"presented.":[89],"An":[90],"example":[91],"application":[93],"railway":[99],"given.":[102],"For":[103],"covering":[105],"abstract":[106],"see":[107],"ITRD":[108],"E111699.":[109]},"counts_by_year":[],"updated_date":"2026-09-22T06:50:58.402377","created_date":"2016-06-24T00:00:00"}
