{"id":"https://openalex.org/W627644711","doi":null,"title":"A life cycle cost analysis case study: M80 Ring Road upgrade project","display_name":"A life cycle cost analysis case study: M80 Ring Road upgrade project","alternate_titles":[],"publication_year":2014,"publication_date":"2014-10-01","ids":{"openalex":"https://openalex.org/W627644711","mag":"627644711"},"language":"en","primary_location":{"id":"mag:627644711","doi":null,"is_oa":false,"landing_page_url":"https://trid.trb.org/view/1335657","pdf_url":null,"source":null,"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":null},"parent_works":[],"lineage":["https://openalex.org/W627644711"],"child_works_count":0,"pull_notice_works":[],"type":"article","is_traditional":true,"indexed_in":[],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5067537398","display_name":"N Weerakkody","type":null,"orcid":null,"observed_orcids":[]},"acted_on_behalf_of":[],"institutions":[],"countries":[],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"N Weerakkody","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]},{"author_position":"last","author":{"id":"https://openalex.org/A5027043035","display_name":"Q Li","type":null,"orcid":null,"observed_orcids":[]},"acted_on_behalf_of":[],"institutions":[],"countries":[],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Q Li","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"reviewed_by_count":0,"citation_normalized_percentile":{"value":0.0,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T14138","display_name":"Life Cycle Costing Analysis","score":0.9937000274658203,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T14138","display_name":"Life Cycle Costing Analysis","score":0.9937000274658203,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10264","display_name":"Asphalt Pavement Performance Evaluation","score":0.003599999938160181,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13236","display_name":"Geotechnical and construction materials studies","score":0.0006000000284984708,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/life-cycle-cost-analysis","display_name":"life cycle cost analysis","score":0.9900000095367432},{"id":"https://openalex.org/keywords/concrete-pavements","display_name":"concrete pavements","score":0.9070000052452087},{"id":"https://openalex.org/keywords/asphalt-pavement","display_name":"asphalt pavement","score":0.7990000247955322},{"id":"https://openalex.org/keywords/pavement-performance-models","display_name":"pavement performance models","score":0.7620000243186951},{"id":"https://openalex.org/keywords/pavement-maintenance-scheduling","display_name":"pavement maintenance scheduling","score":0.6869999766349792},{"id":"https://openalex.org/keywords/rigid-pavement-design","display_name":"rigid pavement design","score":0.9070000052452087},{"id":"https://openalex.org/keywords/value-for-money","display_name":"value for money","score":0.7080000042915344},{"id":"https://openalex.org/keywords/road-infrastructure","display_name":"road infrastructure","score":0.5519999861717224}],"concepts":[{"id":"https://openalex.org/C70940072","wikidata":"https://www.wikidata.org/wiki/Q2739990","display_name":"Subbase","level":5,"score":0.8146525025367737},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.5579172968864441},{"id":"https://openalex.org/C147176958","wikidata":"https://www.wikidata.org/wiki/Q77590","display_name":"Civil engineering","level":1,"score":0.5396772027015686},{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.5354896187782288},{"id":"https://openalex.org/C168056786","wikidata":"https://www.wikidata.org/wiki/Q202251","display_name":"Asphalt","level":2,"score":0.5007319450378418},{"id":"https://openalex.org/C40084718","wikidata":"https://www.wikidata.org/wiki/Q7155835","display_name":"Pavement engineering","level":3,"score":0.47228652238845825},{"id":"https://openalex.org/C2778580826","wikidata":"https://www.wikidata.org/wiki/Q6545089","display_name":"Life-cycle cost analysis","level":2,"score":0.4311474561691284},{"id":"https://openalex.org/C77595967","wikidata":"https://www.wikidata.org/wiki/Q3151013","display_name":"Forensic engineering","level":1,"score":0.4227112829685211},{"id":"https://openalex.org/C22212356","wikidata":"https://www.wikidata.org/wiki/Q775325","display_name":"Transport engineering","level":1,"score":0.41787219047546387},{"id":"https://openalex.org/C2780615140","wikidata":"https://www.wikidata.org/wiki/Q920419","display_name":"Upgrade","level":2,"score":0.41256043314933777},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.1539953052997589},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.11368855834007263},{"id":"https://openalex.org/C205649164","wikidata":"https://www.wikidata.org/wiki/Q1071","display_name":"Geography","level":0,"score":0.09035766124725342},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.0},{"id":"https://openalex.org/C58640448","wikidata":"https://www.wikidata.org/wiki/Q42515","display_name":"Cartography","level":1,"score":0.0},{"id":"https://openalex.org/C118615104","wikidata":"https://www.wikidata.org/wiki/Q121416","display_name":"Discrete mathematics","level":1,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0},{"id":"https://openalex.org/C81332173","wikidata":"https://www.wikidata.org/wiki/Q179899","display_name":"Topological space","level":2,"score":0.0},{"id":"https://openalex.org/C143913944","wikidata":"https://www.wikidata.org/wiki/Q5421952","display_name":"Extension topology","level":4,"score":0.0},{"id":"https://openalex.org/C129089157","wikidata":"https://www.wikidata.org/wiki/Q621550","display_name":"General topology","level":3,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"mag:627644711","doi":null,"is_oa":false,"landing_page_url":"https://trid.trb.org/view/1335657","pdf_url":null,"source":null,"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":null}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Industry, innovation and infrastructure","score":1.0,"id":"https://metadata.un.org/sdg/9"},{"display_name":"Sustainable cities and communities","score":0.7646999955177307,"id":"https://metadata.un.org/sdg/11"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":3,"referenced_works":["https://openalex.org/W2049611598","https://openalex.org/W2134145135","https://openalex.org/W2157778533"],"related_works":["https://openalex.org/W597217651","https://openalex.org/W4210672075","https://openalex.org/W2741082611","https://openalex.org/W2291387681","https://openalex.org/W2238046076","https://openalex.org/W2904199839","https://openalex.org/W2349098901","https://openalex.org/W7118988508","https://openalex.org/W2504161848","https://openalex.org/W617279714"],"abstract_inverted_index":{"The":[0,37,94,108,127],"paper":[1],"presents":[2],"a":[3,7,55,64,78,100],"case":[4],"study":[5,128],"where":[6],"life":[8,95],"cycle":[9,96],"cost":[10,97],"analysis":[11,98],"was":[12],"used":[13],"to":[14,123],"evaluate":[15],"various":[16],"pavement":[17,45,60,69,87,116,139],"options":[18,38],"for":[19,105,121,137],"the":[20,23,31,42,50,71,84,113,118,124,132,147,151],"upgrade":[21],"of":[22,63,83,150],"M80":[24,152],"Ring":[25,153],"Road":[26,29],"between":[27],"Plenty":[28],"and":[30,52,61],"Greensborough":[32],"Highway":[33],"in":[34],"Melbourne,":[35],"Australia.":[36],"compared":[39,145],"included":[40],"retaining":[41,112],"existing":[43,72,85,114],"concrete":[44,86,115],"with":[46,54,146],"on":[47],"going":[48],"maintenance,":[49],"removal":[51],"replacement":[53],"new":[56,65],"deep":[57,66],"strength":[58,67],"asphalt":[59,68],"construction":[62],"utilising":[70],"cement":[73],"treated":[74],"crushed":[75],"rock":[76],"as":[77],"subbase":[79],"layer.":[80],"Performance":[81],"models":[82],"were":[88],"developed":[89],"using":[90],"historical":[91],"survey":[92],"data.":[93],"includes":[99],"30":[101],"year":[102],"maintenance":[103],"schedule":[104],"each":[106],"option.":[107],"results":[109],"indicate":[110],"that":[111,131],"provides":[117],"best":[119],"value":[120],"money":[122],"road":[125],"agency.":[126],"also":[129],"indicates":[130],"current":[133],"Austroads":[134],"design":[135,140],"procedure":[136],"rigid":[138],"is":[141],"overly":[142],"conservative":[143],"when":[144],"field":[148],"performance":[149],"Road.":[154]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W627644711","counts_by_year":[],"updated_date":"2025-11-06T04:12:42.849631","created_date":"2016-06-24T00:00:00"}
