{"id":"https://openalex.org/W580244028","doi":null,"title":"DO TRACK-RENEWAL TRAINS HAVE A PLACE ON AMERICAN RAILROADS","display_name":"DO TRACK-RENEWAL TRAINS HAVE A PLACE ON AMERICAN RAILROADS","publication_year":1977,"publication_date":"1977-03-01","ids":{"openalex":"https://openalex.org/W580244028","mag":"580244028"},"language":"en","primary_location":{"id":"mag:580244028","doi":null,"is_oa":false,"landing_page_url":"https://trid.trb.org/view/53973","pdf_url":null,"source":{"id":"https://openalex.org/S2764772208","display_name":"Railway track and structures","issn_l":"0033-9016","issn":["0033-9016"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":"Railway track and structures","raw_type":null},"volume":null,"type":"article","is_traditional":true,"indexed_in":[],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":null,"display_name":"David R. Burns","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"David R. Burns","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.17447559,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"73","issue":"3","first_page":null,"last_page":null},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10842","display_name":"Railway Engineering and Dynamics","score":0.9994999766349792,"subfield":{"id":"https://openalex.org/subfields/2210","display_name":"Mechanical Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10842","display_name":"Railway Engineering and Dynamics","score":0.9994999766349792,"subfield":{"id":"https://openalex.org/subfields/2210","display_name":"Mechanical Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13439","display_name":"Transport and Economic Policies","score":9.999999747378752e-05,"subfield":{"id":"https://openalex.org/subfields/3313","display_name":"Transportation"},"field":{"id":"https://openalex.org/fields/33","display_name":"Social Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T11568","display_name":"Railway Systems and Energy Efficiency","score":9.999999747378752e-05,"subfield":{"id":"https://openalex.org/subfields/3313","display_name":"Transportation"},"field":{"id":"https://openalex.org/fields/33","display_name":"Social Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/track-maintenance","display_name":"track maintenance","score":0.6579999923706055},{"id":"https://openalex.org/keywords/maintenance-cost-analysis","display_name":"maintenance cost analysis","score":0.7160000205039978},{"id":"https://openalex.org/keywords/track-renewal","display_name":"track renewal","score":0.42899999022483826}],"concepts":[{"id":"https://openalex.org/C190839683","wikidata":"https://www.wikidata.org/wiki/Q2448197","display_name":"Train","level":2,"score":0.9113315343856812},{"id":"https://openalex.org/C89992363","wikidata":"https://www.wikidata.org/wiki/Q5961558","display_name":"Track (disk drive)","level":2,"score":0.7876724004745483},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.6476406455039978},{"id":"https://openalex.org/C22212356","wikidata":"https://www.wikidata.org/wiki/Q775325","display_name":"Transport engineering","level":1,"score":0.5534640550613403},{"id":"https://openalex.org/C2984780852","wikidata":"https://www.wikidata.org/wiki/Q3565868","display_name":"Rail transportation","level":2,"score":0.4309472441673279},{"id":"https://openalex.org/C3020266865","wikidata":"https://www.wikidata.org/wiki/Q2234623","display_name":"Freight trains","level":3,"score":0.41916632652282715},{"id":"https://openalex.org/C147176958","wikidata":"https://www.wikidata.org/wiki/Q77590","display_name":"Civil engineering","level":1,"score":0.3847584128379822},{"id":"https://openalex.org/C77595967","wikidata":"https://www.wikidata.org/wiki/Q3151013","display_name":"Forensic engineering","level":1,"score":0.37475407123565674},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.1419842541217804},{"id":"https://openalex.org/C205649164","wikidata":"https://www.wikidata.org/wiki/Q1071","display_name":"Geography","level":0,"score":0.07850989699363708},{"id":"https://openalex.org/C58640448","wikidata":"https://www.wikidata.org/wiki/Q42515","display_name":"Cartography","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"mag:580244028","doi":null,"is_oa":false,"landing_page_url":"https://trid.trb.org/view/53973","pdf_url":null,"source":{"id":"https://openalex.org/S2764772208","display_name":"Railway track and structures","issn_l":"0033-9016","issn":["0033-9016"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":"Railway track and structures","raw_type":null}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure","score":1.0}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W2242622034","https://openalex.org/W610750982","https://openalex.org/W635647363","https://openalex.org/W2255716329","https://openalex.org/W621063696","https://openalex.org/W796989422","https://openalex.org/W2067435034","https://openalex.org/W2510013430","https://openalex.org/W568873144","https://openalex.org/W589542899"],"abstract_inverted_index":{"The":[0],"several":[1],"forms":[2],"in":[3,40],"which":[4],"such":[5],"equipment":[6],"is":[7,20,43],"available":[8],"are":[9,25],"described,":[10],"the":[11,18],"cascading":[12],"of":[13,30,33],"ties":[14],"made":[15],"possible":[16],"by":[17],"method":[19,32],"analyzed,":[21],"and":[22],"cost":[23],"data":[24],"presented.":[26,44],"A":[27],"generalized":[28],"analysis":[29],"this":[31,41],"maintenance,":[34],"including":[35],"its":[36],"potential":[37],"for":[38],"use":[39],"country":[42]},"counts_by_year":[],"updated_date":"2026-09-29T14:09:16.559479","created_date":"2016-06-24T00:00:00"}
