{"id":"https://openalex.org/W4416906339","doi":"https://doi.org/10.65521/ijrdmr.v14i1.310","title":"A Study on Improvement in Achieving The Production Plan vs Actual of Machine Shop by Analysing The Overall Equipment Efficiency at Tata Advance System Limited Nagpur","display_name":"A Study on Improvement in Achieving The Production Plan vs Actual of Machine Shop by Analysing The Overall Equipment Efficiency at Tata Advance System Limited Nagpur","publication_year":2025,"publication_date":"2025-05-08","ids":{"openalex":"https://openalex.org/W4416906339","doi":"https://doi.org/10.65521/ijrdmr.v14i1.310"},"language":null,"primary_location":{"id":"doi:10.65521/ijrdmr.v14i1.310","doi":"https://doi.org/10.65521/ijrdmr.v14i1.310","is_oa":true,"landing_page_url":"https://doi.org/10.65521/ijrdmr.v14i1.310","pdf_url":"https://journals.mriindia.com/index.php/ijrdmr/article/download/310/354","source":{"id":"https://openalex.org/S5407054139","display_name":"International Journal on Research and Development - A Management Review","issn_l":"2319-5479","issn":["2319-5479"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":"cc-by-nd","license_id":"https://openalex.org/licenses/cc-by-nd","version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"International Journal on Research and Development - A Management Review","raw_type":"journal-article"},"volume":null,"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":true,"oa_status":"hybrid","oa_url":"https://journals.mriindia.com/index.php/ijrdmr/article/download/310/354","any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5065574395","display_name":"Nilesh Prakash Bakde","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Nilesh Prakash Bakde","raw_affiliation_strings":["MBA Student., Tulsiramji Gaikwad Patil College of Engineering and Technology Nagpur, India"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"MBA Student., Tulsiramji Gaikwad Patil College of Engineering and Technology Nagpur, India","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5107494380","display_name":"Tapas Pramanik","orcid":"https://orcid.org/0009-0004-0352-1503","observed_orcids":["https://orcid.org/0009-0004-0352-1503"]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Tapas Pramanik","raw_affiliation_strings":["Assistant Professor, MBA department Tulsiramji Gaikwad Patil College of Engineering and Technology  Nagpur, India"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Assistant Professor, MBA department Tulsiramji Gaikwad Patil College of Engineering and Technology  Nagpur, India","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":true,"cited_by_count":0,"citation_normalized_percentile":{"value":0.33662949,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"14","issue":"1","first_page":"139","last_page":"145"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T13706","display_name":"Management and Optimization Techniques","score":0.9502000212669373,"subfield":{"id":"https://openalex.org/subfields/1408","display_name":"Strategy and Management"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},"topics":[{"id":"https://openalex.org/T13706","display_name":"Management and Optimization Techniques","score":0.9502000212669373,"subfield":{"id":"https://openalex.org/subfields/1408","display_name":"Strategy and Management"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T10164","display_name":"Quality and Supply Management","score":0.021900000050663948,"subfield":{"id":"https://openalex.org/subfields/1404","display_name":"Management Information Systems"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T10763","display_name":"Digital Transformation in Industry","score":0.007799999788403511,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/overall-equipment-effectiveness","display_name":"overall equipment effectiveness","score":0.9290000200271606},{"id":"https://openalex.org/keywords/production-planning","display_name":"production planning","score":0.4869999885559082},{"id":"https://openalex.org/keywords/production-deviations","display_name":"production deviations","score":0.7329999804496765},{"id":"https://openalex.org/keywords/machine-downtime","display_name":"machine downtime","score":0.8730000257492065},{"id":"https://openalex.org/keywords/root-cause-analysis","display_name":"root cause analysis","score":0.8849999904632568},{"id":"https://openalex.org/keywords/pareto-analysis","display_name":"Pareto analysis","score":0.9440000057220459},{"id":"https://openalex.org/keywords/predictive-maintenance","display_name":"predictive maintenance","score":0.9599999785423279},{"id":"https://openalex.org/keywords/process-standardization","display_name":"process standardization","score":0.8259999752044678},{"id":"https://openalex.org/keywords/real-time-monitoring","display_name":"real-time monitoring","score":0.9319999814033508},{"id":"https://openalex.org/keywords/equipment-utilization","display_name":"equipment utilization","score":0.5759999752044678}],"concepts":[{"id":"https://openalex.org/C2781106871","wikidata":"https://www.wikidata.org/wiki/Q1029015","display_name":"Overall equipment effectiveness","level":3,"score":0.801800012588501},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.6365000009536743},{"id":"https://openalex.org/C115901376","wikidata":"https://www.wikidata.org/wiki/Q184199","display_name":"Automation","level":2,"score":0.5378999710083008},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.5042999982833862},{"id":"https://openalex.org/C99862985","wikidata":"https://www.wikidata.org/wiki/Q10858068","display_name":"Production line","level":2,"score":0.4586000144481659},{"id":"https://openalex.org/C26517878","wikidata":"https://www.wikidata.org/wiki/Q228039","display_name":"Key (lock)","level":2,"score":0.44600000977516174},{"id":"https://openalex.org/C204983608","wikidata":"https://www.wikidata.org/wiki/Q2111958","display_name":"Productivity","level":2,"score":0.44510000944137573},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.4235999882221222},{"id":"https://openalex.org/C2778372311","wikidata":"https://www.wikidata.org/wiki/Q2111762","display_name":"Machine shop","level":2,"score":0.41530001163482666},{"id":"https://openalex.org/C175700187","wikidata":"https://www.wikidata.org/wiki/Q187939","display_name":"Manufacturing","level":2,"score":0.3912000060081482},{"id":"https://openalex.org/C2777909354","wikidata":"https://www.wikidata.org/wiki/Q1386523","display_name":"Production planning","level":3,"score":0.38580000400543213},{"id":"https://openalex.org/C98045186","wikidata":"https://www.wikidata.org/wiki/Q205663","display_name":"Process (computing)","level":2,"score":0.37459999322891235},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.3598000109195709},{"id":"https://openalex.org/C43214815","wikidata":"https://www.wikidata.org/wiki/Q7310987","display_name":"Reliability (semiconductor)","level":3,"score":0.34790000319480896},{"id":"https://openalex.org/C79158427","wikidata":"https://www.wikidata.org/wiki/Q485396","display_name":"Analytics","level":2,"score":0.3452000021934509},{"id":"https://openalex.org/C2776043813","wikidata":"https://www.wikidata.org/wiki/Q1759113","display_name":"Batch production","level":2,"score":0.3449999988079071},{"id":"https://openalex.org/C135510737","wikidata":"https://www.wikidata.org/wiki/Q860554","display_name":"Performance indicator","level":2,"score":0.34450000524520874},{"id":"https://openalex.org/C5941749","wikidata":"https://www.wikidata.org/wiki/Q19768","display_name":"Machine tool","level":2,"score":0.34060001373291016},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.32519999146461487},{"id":"https://openalex.org/C180591934","wikidata":"https://www.wikidata.org/wiki/Q1253369","display_name":"Downtime","level":2,"score":0.31859999895095825},{"id":"https://openalex.org/C2778738845","wikidata":"https://www.wikidata.org/wiki/Q1521829","display_name":"Remanufacturing","level":2,"score":0.29789999127388},{"id":"https://openalex.org/C2776505523","wikidata":"https://www.wikidata.org/wiki/Q4785468","display_name":"Plan (archaeology)","level":2,"score":0.29109999537467957},{"id":"https://openalex.org/C2777986313","wikidata":"https://www.wikidata.org/wiki/Q1661989","display_name":"Industry 4.0","level":2,"score":0.2903999984264374},{"id":"https://openalex.org/C135909481","wikidata":"https://www.wikidata.org/wiki/Q17092930","display_name":"Production manager","level":3,"score":0.2777000069618225},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.2759999930858612},{"id":"https://openalex.org/C70452415","wikidata":"https://www.wikidata.org/wiki/Q3182448","display_name":"Predictive maintenance","level":2,"score":0.274399995803833},{"id":"https://openalex.org/C100776233","wikidata":"https://www.wikidata.org/wiki/Q2532492","display_name":"Bridge (graph theory)","level":2,"score":0.26820001006126404},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.26669999957084656},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.2597000002861023},{"id":"https://openalex.org/C109332788","wikidata":"https://www.wikidata.org/wiki/Q615445","display_name":"Economic efficiency","level":2,"score":0.25850000977516174},{"id":"https://openalex.org/C2779136372","wikidata":"https://www.wikidata.org/wiki/Q10283002","display_name":"Information flow","level":2,"score":0.2583000063896179},{"id":"https://openalex.org/C2778139618","wikidata":"https://www.wikidata.org/wiki/Q13440398","display_name":"Workforce","level":2,"score":0.2563999891281128}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.65521/ijrdmr.v14i1.310","doi":"https://doi.org/10.65521/ijrdmr.v14i1.310","is_oa":true,"landing_page_url":"https://doi.org/10.65521/ijrdmr.v14i1.310","pdf_url":"https://journals.mriindia.com/index.php/ijrdmr/article/download/310/354","source":{"id":"https://openalex.org/S5407054139","display_name":"International Journal on Research and Development - A Management Review","issn_l":"2319-5479","issn":["2319-5479"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":"cc-by-nd","license_id":"https://openalex.org/licenses/cc-by-nd","version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"International Journal on Research and Development - A Management Review","raw_type":"journal-article"}],"best_oa_location":{"id":"doi:10.65521/ijrdmr.v14i1.310","doi":"https://doi.org/10.65521/ijrdmr.v14i1.310","is_oa":true,"landing_page_url":"https://doi.org/10.65521/ijrdmr.v14i1.310","pdf_url":"https://journals.mriindia.com/index.php/ijrdmr/article/download/310/354","source":{"id":"https://openalex.org/S5407054139","display_name":"International Journal on Research and Development - A Management Review","issn_l":"2319-5479","issn":["2319-5479"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":"cc-by-nd","license_id":"https://openalex.org/licenses/cc-by-nd","version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"International Journal on Research and Development - A Management Review","raw_type":"journal-article"},"sustainable_development_goals":[{"score":0.6773999929428101,"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure"}],"sustainable_development_goals_aurora":[],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":true,"grobid_xml":true},"content_urls":{"pdf":"https://content.openalex.org/works/W4416906339.pdf","grobid_xml":"https://content.openalex.org/works/W4416906339.grobid-xml"},"referenced_works_count":0,"referenced_works":[],"related_works":[],"abstract_inverted_index":{"Achieving":[0],"alignment":[1,171],"between":[2,172],"planned":[3,173],"production":[4,21,68,83,117,176,191],"targets":[5],"and":[6,60,73,92,104,126,154,168,174,186,193,204,211,230],"actual":[7,175],"output":[8],"is":[9,44],"a":[10,39,45],"critical":[11],"challenge":[12],"in":[13,23,67,232],"manufacturing":[14,184,228],"industries.":[15],"This":[16,178],"study":[17,110,141,218],"focuses":[18],"on":[19,116],"analysing":[20],"deviations":[22],"the":[24,109,112,140,233],"machine":[25,51,87,122,163,194],"shop":[26,52,195],"at":[27,225],"Tata":[28],"Advanced":[29],"Systems":[30],"Limited,":[31],"Nagpur,":[32],"using":[33],"Overall":[34],"Equipment":[35],"Efficiency":[36],"(OEE)":[37],"as":[38,99,146],"key":[40,143],"performance":[41,134],"metric.":[42],"OEE":[43,64,100],"widely":[46],"used":[47],"standard":[48],"for":[49,183],"evaluating":[50],"performance,":[53,59],"incorporating":[54],"three":[55],"primary":[56],"components:":[57],"availability,":[58],"quality.":[61],"A":[62],"lower-than-expected":[63],"often":[65],"results":[66],"inefficiencies,":[69,125],"impacting":[70],"operational":[71,212],"effectiveness":[72],"delivery":[74],"schedules.":[75],"The":[76,214],"research":[77,179],"identifies":[78],"major":[79],"factors":[80],"contributing":[81],"to":[82,133,189,207,220],"deviations,":[84],"including":[85],"unplanned":[86],"downtime,":[88,123],"reduced":[89],"operating":[90],"speed,":[91],"defective":[93],"output.":[94,118],"Using":[95],"data-driven":[96],"methods":[97],"such":[98,145],"calculations,":[101],"Pareto":[102],"analysis,":[103],"Root":[105],"Cause":[106],"Analysis":[107],"(RCA),":[108],"evaluates":[111],"impact":[113],"of":[114,216],"inefficiencies":[115],"Findings":[119],"indicate":[120],"that":[121],"operator":[124],"material":[127],"flow":[128],"disruptions":[129],"are":[130],"significant":[131],"contributors":[132],"gaps.":[135],"To":[136],"bridge":[137],"these":[138,159],"gaps,":[139],"proposes":[142],"strategies":[144],"predictive":[147,202],"maintenance,":[148],"workforce":[149,166],"skill":[150],"enhancement,":[151],"process":[152],"standardization,":[153],"real-time":[155],"monitoring":[156],"systems.":[157],"Implementing":[158],"measures":[160],"can":[161,199],"optimize":[162],"utilization,":[164],"improve":[165,190],"efficiency,":[167],"ensure":[169],"better":[170],"targets.":[177],"provides":[180],"valuable":[181],"insights":[182],"managers":[185],"decision-makers":[187],"seeking":[188],"efficiency":[192,229],"performance.":[196],"Future":[197],"studies":[198],"explore":[200],"AI-based":[201],"analytics":[203],"automation":[205],"techniques":[206],"further":[208],"enhance":[209],"productivity":[210],"control.":[213],"findings":[215],"this":[217],"contribute":[219],"continuous":[221],"improvement":[222],"methodologies":[223],"aimed":[224],"increasing":[226],"overall":[227],"competitiveness":[231],"industry.":[234]},"counts_by_year":[],"updated_date":"2026-09-24T07:57:37.273135","created_date":"2025-12-02T00:00:00"}
