{"id":"https://openalex.org/W4416355134","doi":"https://doi.org/10.1061/9780784486627.042","title":"Influencing Factors during Life Cycle Transition of Digital Models of Electrical Equipment in Grid Engineering Based on AHP-DEMATEL","display_name":"Influencing Factors during Life Cycle Transition of Digital Models of Electrical Equipment in Grid Engineering Based on AHP-DEMATEL","publication_year":2025,"publication_date":"2025-11-19","ids":{"openalex":"https://openalex.org/W4416355134","doi":"https://doi.org/10.1061/9780784486627.042"},"language":"en","primary_location":{"id":"doi:10.1061/9780784486627.042","doi":"https://doi.org/10.1061/9780784486627.042","is_oa":false,"landing_page_url":"https://doi.org/10.1061/9780784486627.042","pdf_url":null,"source":{"id":"https://openalex.org/S4363606967","display_name":"International Conference on Construction and Real Estate Management (ICCREM)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"ICCREM 2025","raw_type":"proceedings-article"},"volume":null,"type":"conference-paper","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5030167007","display_name":"Yuying Gao","orcid":"https://orcid.org/0000-0003-2110-3837","observed_orcids":["https://orcid.org/0000-0003-2110-3837"]},"institutions":[{"id":"https://openalex.org/I4405278127","display_name":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. (China)","ror":"https://ror.org/052hdh182","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210110195","https://openalex.org/I4405278127"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Yuying Gao","raw_affiliation_strings":["China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","Guangdong Huashen Building Engineering Information Technology Co., Ltd"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","institution_ids":["https://openalex.org/I4405278127"]},{"raw_affiliation_string":"Guangdong Huashen Building Engineering Information Technology Co., Ltd","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5112749114","display_name":"Guofeng Xiao","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4405278127","display_name":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. (China)","ror":"https://ror.org/052hdh182","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210110195","https://openalex.org/I4405278127"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Guofeng Xiao","raw_affiliation_strings":["China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","Guangdong Huashen Building Engineering Information Technology Co., Ltd"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","institution_ids":["https://openalex.org/I4405278127"]},{"raw_affiliation_string":"Guangdong Huashen Building Engineering Information Technology Co., Ltd","institution_ids":[]}]},{"author_position":"middle","author":{"id":null,"display_name":"Hao Zhang","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4405278127","display_name":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. (China)","ror":"https://ror.org/052hdh182","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210110195","https://openalex.org/I4405278127"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Hao Zhang","raw_affiliation_strings":["China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","Guangdong Huashen Building Engineering Information Technology Co., Ltd"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","institution_ids":["https://openalex.org/I4405278127"]},{"raw_affiliation_string":"Guangdong Huashen Building Engineering Information Technology Co., Ltd","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5034027349","display_name":"Xiyue Wang","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4405278127","display_name":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. (China)","ror":"https://ror.org/052hdh182","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210110195","https://openalex.org/I4405278127"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Xiyue Wang","raw_affiliation_strings":["China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","Guangdong Huashen Building Engineering Information Technology Co., Ltd"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","institution_ids":["https://openalex.org/I4405278127"]},{"raw_affiliation_string":"Guangdong Huashen Building Engineering Information Technology Co., Ltd","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5103632110","display_name":"Shiliang Jian","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4405278127","display_name":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. (China)","ror":"https://ror.org/052hdh182","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210110195","https://openalex.org/I4405278127"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Shiliang Jian","raw_affiliation_strings":["China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","Guangdong Huashen Building Engineering Information Technology Co., Ltd"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","institution_ids":["https://openalex.org/I4405278127"]},{"raw_affiliation_string":"Guangdong Huashen Building Engineering Information Technology Co., Ltd","institution_ids":[]}]},{"author_position":"last","author":{"id":null,"display_name":"Yi Ma","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4405278127","display_name":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. (China)","ror":"https://ror.org/052hdh182","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210110195","https://openalex.org/I4405278127"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Yi Ma","raw_affiliation_strings":["China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","Guangdong Huashen Building Engineering Information Technology Co., Ltd"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd","institution_ids":["https://openalex.org/I4405278127"]},{"raw_affiliation_string":"Guangdong Huashen Building Engineering Information Technology Co., Ltd","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I4405278127"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.0,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"430","last_page":"438"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11006","display_name":"BIM and Construction Integration","score":0.5493000149726868,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11006","display_name":"BIM and Construction Integration","score":0.5493000149726868,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12451","display_name":"Smart Grid and Power Systems","score":0.227400004863739,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14276","display_name":"Power Systems and Technologies","score":0.07909999787807465,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/digital-twin","display_name":"digital twin","score":0.7850000262260437},{"id":"https://openalex.org/keywords/electrical-equipment","display_name":"electrical equipment","score":0.8450000286102295},{"id":"https://openalex.org/keywords/power-grid-engineering","display_name":"power grid engineering","score":0.9789999723434448},{"id":"https://openalex.org/keywords/life-cycle-management","display_name":"life cycle management","score":0.7210000157356262},{"id":"https://openalex.org/keywords/model-precision","display_name":"model precision","score":0.5170000195503235},{"id":"https://openalex.org/keywords/management-coordination","display_name":"management coordination","score":0.9449999928474426},{"id":"https://openalex.org/keywords/data-silos","display_name":"data silos","score":0.9409999847412109}],"concepts":[{"id":"https://openalex.org/C2983254600","wikidata":"https://www.wikidata.org/wiki/Q1096907","display_name":"Power grid","level":3,"score":0.6079999804496765},{"id":"https://openalex.org/C98045186","wikidata":"https://www.wikidata.org/wiki/Q205663","display_name":"Process (computing)","level":2,"score":0.5961999893188477},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.5476999878883362},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.534500002861023},{"id":"https://openalex.org/C201995342","wikidata":"https://www.wikidata.org/wiki/Q682496","display_name":"Systems engineering","level":1,"score":0.47600001096725464},{"id":"https://openalex.org/C10558101","wikidata":"https://www.wikidata.org/wiki/Q689855","display_name":"Smart grid","level":2,"score":0.4388999938964844},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.4343999922275543},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.4327999949455261},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.42879998683929443},{"id":"https://openalex.org/C2986056383","wikidata":"https://www.wikidata.org/wiki/Q556030","display_name":"Power flow","level":4,"score":0.4090999960899353},{"id":"https://openalex.org/C87345402","wikidata":"https://www.wikidata.org/wiki/Q485202","display_name":"Analytic hierarchy process","level":2,"score":0.39309999346733093},{"id":"https://openalex.org/C7465953","wikidata":"https://www.wikidata.org/wiki/Q1572577","display_name":"Product life-cycle management","level":2,"score":0.38830000162124634},{"id":"https://openalex.org/C31170391","wikidata":"https://www.wikidata.org/wiki/Q188619","display_name":"Hierarchy","level":2,"score":0.3783999979496002},{"id":"https://openalex.org/C38349280","wikidata":"https://www.wikidata.org/wiki/Q1434290","display_name":"Flow (mathematics)","level":2,"score":0.37619999051094055},{"id":"https://openalex.org/C2779136372","wikidata":"https://www.wikidata.org/wiki/Q10283002","display_name":"Information flow","level":2,"score":0.33730000257492065},{"id":"https://openalex.org/C40293303","wikidata":"https://www.wikidata.org/wiki/Q27137","display_name":"Electric power","level":3,"score":0.30640000104904175},{"id":"https://openalex.org/C126082660","wikidata":"https://www.wikidata.org/wiki/Q4252370","display_name":"Digital transformation","level":2,"score":0.30550000071525574},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.3027999997138977},{"id":"https://openalex.org/C44154836","wikidata":"https://www.wikidata.org/wiki/Q45045","display_name":"Simulation","level":1,"score":0.26820001006126404},{"id":"https://openalex.org/C34972735","wikidata":"https://www.wikidata.org/wiki/Q2920267","display_name":"Engineering design process","level":2,"score":0.2678999900817871},{"id":"https://openalex.org/C133731056","wikidata":"https://www.wikidata.org/wiki/Q4917288","display_name":"Control engineering","level":1,"score":0.26570001244544983},{"id":"https://openalex.org/C162175671","wikidata":"https://www.wikidata.org/wiki/Q3749263","display_name":"Electrical equipment","level":2,"score":0.2637999951839447},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.250900000333786},{"id":"https://openalex.org/C59594135","wikidata":"https://www.wikidata.org/wiki/Q5249242","display_name":"Decision model","level":2,"score":0.25049999356269836}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1061/9780784486627.042","doi":"https://doi.org/10.1061/9780784486627.042","is_oa":false,"landing_page_url":"https://doi.org/10.1061/9780784486627.042","pdf_url":null,"source":{"id":"https://openalex.org/S4363606967","display_name":"International Conference on Construction and Real Estate Management (ICCREM)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"ICCREM 2025","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","score":1.0,"display_name":"Industry, innovation and infrastructure"},{"id":"https://metadata.un.org/sdg/7","score":0.75,"display_name":"Affordable and clean energy"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":8,"referenced_works":["https://openalex.org/W2092553756","https://openalex.org/W3112901966","https://openalex.org/W3217679836","https://openalex.org/W4200235217","https://openalex.org/W4280524478","https://openalex.org/W4308558982","https://openalex.org/W4323664057","https://openalex.org/W4403512018"],"related_works":["https://openalex.org/W4403677094","https://openalex.org/W4389990929","https://openalex.org/W4414198015","https://openalex.org/W7128114027","https://openalex.org/W4411887319","https://openalex.org/W4409868917","https://openalex.org/W4213289452","https://openalex.org/W7161736226","https://openalex.org/W4403689527","https://openalex.org/W4409724566"],"abstract_inverted_index":{"With":[0],"the":[1,9,19,28,47,62,66,75,97,115,128],"advancement":[2],"of":[3,11,21,27,68,71,78,99,117,131],"digitalization":[4],"in":[5,96],"power":[6,79,132],"grid":[7,80,133],"engineering,":[8],"application":[10],"digital":[12,22,69,100,118,129],"models":[13,23,70,101],"has":[14],"become":[15],"increasingly":[16],"widespread.":[17],"However,":[18],"flow":[20,67,98],"across":[24],"different":[25],"stages":[26],"life":[29,76],"cycle":[30,77],"often":[31],"faces":[32],"issues":[33],"such":[34],"as":[35],"repetitive":[36],"modeling,":[37],"information":[38],"silos,":[39],"and":[40,52,55,90,124],"low":[41],"coordination":[42],"efficiency.":[43],"This":[44],"study":[45,110],"combined":[46],"analytic":[48],"hierarchy":[49],"process":[50],"(AHP)":[51],"Decision":[53],"Experiment":[54],"Evaluation":[56],"Laboratory":[57],"(DEMATEL)":[58],"methods":[59],"to":[60],"analyze":[61],"main":[63],"factors":[64],"influencing":[65],"electrical":[72],"equipment":[73],"throughout":[74],"engineering.":[81],"The":[82],"results":[83],"indicate":[84],"that":[85],"model":[86,119],"precision,":[87],"management":[88],"coordination,":[89],"modelers\u2019":[91],"skills":[92],"play":[93],"crucial":[94],"roles":[95],"at":[102],"various":[103],"stages.":[104],"Based":[105],"on":[106],"these":[107],"findings,":[108],"this":[109],"proposed":[111],"strategies":[112],"for":[113,127],"optimizing":[114],"efficiency":[116],"flow,":[120],"providing":[121],"theoretical":[122],"support":[123],"practical":[125],"guidance":[126],"construction":[130],"projects.":[134]},"counts_by_year":[],"updated_date":"2026-10-28T10:33:24.094632","created_date":"2025-11-19T00:00:00"}
