{"id":"https://openalex.org/W4401416968","doi":"https://doi.org/10.1109/eem60825.2024.10608903","title":"Stochastic Optimization for unit Commitment Applied to the Security of Supply","display_name":"Stochastic Optimization for unit Commitment Applied to the Security of Supply","publication_year":2024,"publication_date":"2024-06-10","ids":{"openalex":"https://openalex.org/W4401416968","doi":"https://doi.org/10.1109/eem60825.2024.10608903"},"language":"en","primary_location":{"id":"doi:10.1109/eem60825.2024.10608903","doi":"https://doi.org/10.1109/eem60825.2024.10608903","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/eem60825.2024.10608903","pdf_url":null,"source":{"id":"https://openalex.org/S4363608161","display_name":"International Conference on the European Energy Market (EEM)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 20th International Conference on the European Energy Market (EEM)","raw_type":"proceedings-article"},"volume":null,"type":"conference-paper","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5030367603","display_name":"Jonathan Dumas","orcid":"https://orcid.org/0000-0003-4739-6439","observed_orcids":["https://orcid.org/0000-0003-4739-6439"]},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Jonathan Dumas","raw_affiliation_strings":["RTE R&#x0026;D, Immeuble Window 7C,France"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"RTE R&#x0026;D, Immeuble Window 7C,France","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":["https://openalex.org/A5030367603"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.12772842,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"9"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9994999766349792,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9994999766349792,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.00019999999494757503,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11941","display_name":"Power System Reliability and Maintenance","score":9.999999747378752e-05,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/unit-commitment","display_name":"unit commitment","score":0.8650000095367432},{"id":"https://openalex.org/keywords/security-of-supply","display_name":"supply security","score":0.9200000166893005},{"id":"https://openalex.org/keywords/multistage-stochastic-programming","display_name":"multistage stochastic programming","score":0.921999990940094},{"id":"https://openalex.org/keywords/model-predictive-control","display_name":"model predictive control","score":0.8130000233650208},{"id":"https://openalex.org/keywords/system-imbalance","display_name":"system imbalance","score":0.4749999940395355},{"id":"https://openalex.org/keywords/renewable-energy-generation","display_name":"renewable energy generation","score":0.7329999804496765},{"id":"https://openalex.org/keywords/electricity-market","display_name":"electricity market","score":0.3440000116825104}],"concepts":[{"id":"https://openalex.org/C194387892","wikidata":"https://www.wikidata.org/wiki/Q1747770","display_name":"Stochastic optimization","level":2,"score":0.5956868529319763},{"id":"https://openalex.org/C116219307","wikidata":"https://www.wikidata.org/wiki/Q7236625","display_name":"Power system simulation","level":4,"score":0.5550574660301208},{"id":"https://openalex.org/C122637931","wikidata":"https://www.wikidata.org/wiki/Q118084","display_name":"Unit (ring theory)","level":2,"score":0.5018947124481201},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.4767778217792511},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.35355570912361145},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.12708741426467896},{"id":"https://openalex.org/C145420912","wikidata":"https://www.wikidata.org/wiki/Q853077","display_name":"Mathematics education","level":1,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/eem60825.2024.10608903","doi":"https://doi.org/10.1109/eem60825.2024.10608903","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/eem60825.2024.10608903","pdf_url":null,"source":{"id":"https://openalex.org/S4363608161","display_name":"International Conference on the European Energy Market (EEM)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 20th International Conference on the European Energy Market (EEM)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Affordable and clean energy","score":0.8485000133514404,"id":"https://metadata.un.org/sdg/7"},{"display_name":"Industry, innovation and infrastructure","score":0.651199996471405,"id":"https://metadata.un.org/sdg/9"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":11,"referenced_works":["https://openalex.org/W1569990960","https://openalex.org/W2019710194","https://openalex.org/W2885962488","https://openalex.org/W3116653517","https://openalex.org/W3124407081","https://openalex.org/W4226022634","https://openalex.org/W4298152141","https://openalex.org/W4380609585","https://openalex.org/W4382935671","https://openalex.org/W4385818148","https://openalex.org/W4386883062"],"related_works":["https://openalex.org/W4389600254","https://openalex.org/W2110550129","https://openalex.org/W2102161868","https://openalex.org/W2085408800","https://openalex.org/W2077929333","https://openalex.org/W2067700532","https://openalex.org/W1517280034","https://openalex.org/W2031447248","https://openalex.org/W4403015712","https://openalex.org/W2152282461"],"abstract_inverted_index":{"Transmission":[0],"system":[1,23,48],"operators":[2],"employ":[3],"reserves":[4],"to":[5,14,63,68,140],"deal":[6],"with":[7,90,116,123,155,175],"unexpected":[8],"variations":[9],"of":[10,18,39,43,46,72,101,106,136],"demand":[11],"and":[12,50,66,98,103,109,121,172,179],"generation":[13],"guarantee":[15],"the":[16,28,40,44,47,76,96,104,142],"security":[17],"supply.":[19],"The":[20,111],"French":[21,176],"transmission":[22],"operator":[24],"RTE":[25],"dynamically":[26],"sizes":[27],"required":[29,77],"margins":[30,74],"using":[31,85],"a":[32,51,70,83,86,91,117,124,134,156,166],"probabilistic":[33,87],"approach":[34],"relying":[35],"on":[36,165],"continuous":[37],"forecasts":[38],"main":[41],"drivers":[42],"uncertainties":[45],"imbalance":[49],"1%":[52],"risk":[53],"threshold.":[54],"However,":[55],"this":[56,80],"criterion":[57],"does":[58],"not":[59],"specify":[60],"which":[61],"means":[62],"activate":[64],"upward/downward":[65],"when":[67],"face":[69],"deficit":[71],"available":[73],"versus":[75],"margins.":[78],"Thus,":[79],"work":[81],"presents":[82],"strategy":[84],"unit":[88],"commitment":[89],"stochastic":[92,119,128,138,159],"optimization-based":[93],"approach,":[94],"including":[95],"fixed":[97],"variable":[99],"costs":[100,105],"units":[102,174],"lost":[107],"load":[108],"production.":[110,181],"abstract":[112],"problem":[113],"is":[114,148,163],"formulated":[115],"multistage":[118],"program":[120],"approximated":[122,153],"heuristic":[125],"called":[126],"two-stage":[127,137,158],"model":[129],"predictive":[130],"control.":[131],"It":[132],"solves":[133],"sequence":[135],"programs":[139],"conduct":[141],"central":[143],"dispatch.":[144],"A":[145],"tractable":[146],"implementation":[147],"conducted":[149],"by":[150],"solving":[151],"an":[152],"version":[154],"single":[157],"program.":[160],"This":[161],"method":[162],"tested":[164],"real":[167],"case":[168],"study":[169],"comprising":[170],"nuclear":[171],"fossil-based":[173],"electrical":[177],"consumption":[178],"renewable":[180]},"counts_by_year":[],"updated_date":"2026-11-03T10:50:19.383937","created_date":"2024-08-09T00:00:00"}
