{"id":"https://openalex.org/W4399427332","doi":"https://doi.org/10.1109/iccect60629.2024.10545834","title":"Research on Technology and Maintenance of Train Control Center","display_name":"Research on Technology and Maintenance of Train Control Center","publication_year":2024,"publication_date":"2024-04-26","ids":{"openalex":"https://openalex.org/W4399427332","doi":"https://doi.org/10.1109/iccect60629.2024.10545834"},"language":"en","primary_location":{"id":"doi:10.1109/iccect60629.2024.10545834","doi":"https://doi.org/10.1109/iccect60629.2024.10545834","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/iccect60629.2024.10545834","pdf_url":null,"source":{"id":"https://openalex.org/S7407088498","display_name":"IEEE International Conference on Control, Electronics and Computer Technology (ICCECT)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 IEEE 2nd International Conference on Control, Electronics and Computer Technology (ICCECT)","raw_type":"proceedings-article"},"volume":null,"type":"conference-paper","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":null,"display_name":"Bo Li","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4405280634","display_name":"Wuhan Railway Vocational College of Technology","ror":"https://ror.org/037ch1c80","country_code":"CN","type":"education","lineage":["https://openalex.org/I4405280634"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Bo Li","raw_affiliation_strings":["School of Rail Communication &#x0026; Signals and Electrification, Wuhan Railway Vocational College of Technology,Wuhan,China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Rail Communication &#x0026; Signals and Electrification, Wuhan Railway Vocational College of Technology,Wuhan,China","institution_ids":["https://openalex.org/I4405280634"]}]},{"author_position":"last","author":{"id":null,"display_name":"Ying Lu","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Ying Lu","raw_affiliation_strings":["China Railway Wuhan Bureau Group Co., Ltd,Wuhan Electric Business Depot,Wuhan,China","Wuhan Electric Business Depot, China Railway Wuhan Bureau Group Co., Ltd, Wuhan, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"China Railway Wuhan Bureau Group Co., Ltd,Wuhan Electric Business Depot,Wuhan,China","institution_ids":[]},{"raw_affiliation_string":"Wuhan Electric Business Depot, China Railway Wuhan Bureau Group Co., Ltd, Wuhan, China","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.6391,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.54073575,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":94},"biblio":{"volume":null,"issue":null,"first_page":"278","last_page":"282"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T13615","display_name":"Transportation Systems and Safety","score":0.9868000149726868,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T13615","display_name":"Transportation Systems and Safety","score":0.9868000149726868,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11568","display_name":"Railway Systems and Energy Efficiency","score":0.011099999770522118,"subfield":{"id":"https://openalex.org/subfields/3313","display_name":"Transportation"},"field":{"id":"https://openalex.org/fields/33","display_name":"Social Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T10842","display_name":"Railway Engineering and Dynamics","score":0.0010999999940395355,"subfield":{"id":"https://openalex.org/subfields/2210","display_name":"Mechanical Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/train-control-center","display_name":"train control center","score":0.8790000081062317},{"id":"https://openalex.org/keywords/ctcs-3","display_name":"CTCS-3","score":1.0},{"id":"https://openalex.org/keywords/high-speed-rail","display_name":"high-speed rail","score":0.6679999828338623},{"id":"https://openalex.org/keywords/train-control-systems","display_name":"train control systems","score":0.6869999766349792},{"id":"https://openalex.org/keywords/gsm-r","display_name":"GSM-R","score":0.6869999766349792},{"id":"https://openalex.org/keywords/balise","display_name":"balise","score":0.8579999804496765},{"id":"https://openalex.org/keywords/track-circuits","display_name":"track circuits","score":0.9819999933242798},{"id":"https://openalex.org/keywords/train-ground-communication","display_name":"train-to-ground communication","score":0.7730000019073486},{"id":"https://openalex.org/keywords/equipment-maintenance","display_name":"equipment maintenance","score":0.5680000185966492},{"id":"https://openalex.org/keywords/railway-operation-safety","display_name":"train operation safety","score":0.6819999814033508}],"concepts":[{"id":"https://openalex.org/C190839683","wikidata":"https://www.wikidata.org/wiki/Q2448197","display_name":"Train","level":2,"score":0.8646495342254639},{"id":"https://openalex.org/C17500928","wikidata":"https://www.wikidata.org/wiki/Q959968","display_name":"Control system","level":2,"score":0.532648503780365},{"id":"https://openalex.org/C98045186","wikidata":"https://www.wikidata.org/wiki/Q205663","display_name":"Process (computing)","level":2,"score":0.5072607398033142},{"id":"https://openalex.org/C26517878","wikidata":"https://www.wikidata.org/wiki/Q228039","display_name":"Key (lock)","level":2,"score":0.48209550976753235},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.47533583641052246},{"id":"https://openalex.org/C555944384","wikidata":"https://www.wikidata.org/wiki/Q249","display_name":"Wireless","level":2,"score":0.4496338367462158},{"id":"https://openalex.org/C191926282","wikidata":"https://www.wikidata.org/wiki/Q1150115","display_name":"Track circuit","level":3,"score":0.4487699866294861},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.4485461115837097},{"id":"https://openalex.org/C2775924081","wikidata":"https://www.wikidata.org/wiki/Q55608371","display_name":"Control (management)","level":2,"score":0.42872896790504456},{"id":"https://openalex.org/C89992363","wikidata":"https://www.wikidata.org/wiki/Q5961558","display_name":"Track (disk drive)","level":2,"score":0.41430193185806274},{"id":"https://openalex.org/C76155785","wikidata":"https://www.wikidata.org/wiki/Q418","display_name":"Telecommunications","level":1,"score":0.3666079044342041},{"id":"https://openalex.org/C761482","wikidata":"https://www.wikidata.org/wiki/Q118093","display_name":"Transmission (telecommunications)","level":2,"score":0.30936795473098755},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.21205049753189087},{"id":"https://openalex.org/C38652104","wikidata":"https://www.wikidata.org/wiki/Q3510521","display_name":"Computer security","level":1,"score":0.0},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.0},{"id":"https://openalex.org/C205649164","wikidata":"https://www.wikidata.org/wiki/Q1071","display_name":"Geography","level":0,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0},{"id":"https://openalex.org/C58640448","wikidata":"https://www.wikidata.org/wiki/Q42515","display_name":"Cartography","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/iccect60629.2024.10545834","doi":"https://doi.org/10.1109/iccect60629.2024.10545834","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/iccect60629.2024.10545834","pdf_url":null,"source":{"id":"https://openalex.org/S7407088498","display_name":"IEEE International Conference on Control, Electronics and Computer Technology (ICCECT)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 IEEE 2nd International Conference on Control, Electronics and Computer Technology (ICCECT)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","score":1.0,"display_name":"Industry, innovation and infrastructure"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":6,"referenced_works":["https://openalex.org/W2075309704","https://openalex.org/W2141909737","https://openalex.org/W2204487711","https://openalex.org/W2762243975","https://openalex.org/W2914378775","https://openalex.org/W3014671455"],"related_works":["https://openalex.org/W2393611266","https://openalex.org/W2364964694","https://openalex.org/W2052525635","https://openalex.org/W2204487711","https://openalex.org/W4244610540","https://openalex.org/W2364030542","https://openalex.org/W2762243975","https://openalex.org/W3210548254","https://openalex.org/W187564461","https://openalex.org/W2364085509"],"abstract_inverted_index":{"Train":[0,80,93],"control":[1,23,59,109,134,195],"system":[2,60,62,110,135],"is":[3,106,123],"one":[4],"of":[5,15,27,38,49,66,78,152,159,167,187,192],"the":[6,12,24,35,47,55,64,74,157,184,188],"key":[7,67],"technical":[8,185],"equipment":[9,191],"to":[10,117,147],"ensure":[11,34],"safe":[13,36],"operation":[14,29,37,166],"trains":[16,39],"and":[17,33,43,51,63,76,91,115,164,197],"improve":[18],"transportation":[19],"efficiency.":[20],"It":[21],"can":[22],"whole":[25],"process":[26],"train":[28,58,108,133,194],"in":[30,84,99,126,179],"real":[31],"time":[32],"with":[40,86,169],"high":[41,44,160,162],"speed":[42,171],"density.":[45],"On":[46],"basis":[48],"studying":[50],"drawing":[52],"lessons":[53],"from":[54],"international":[56],"advanced":[57],"technology":[61],"application":[65],"technologies,":[68],"China":[69],"has":[70],"vigorously":[71],"carried":[72],"out":[73],"research":[75],"construction":[77],"Chinese":[79],"Control":[81,94],"System":[82,138],"(CTCS)":[83],"combination":[85],"China's":[87,100],"actual":[88],"situation.":[89],"CTCS-2":[90,105],"CTCS-3":[92,132],"Systems":[95],"are":[96],"widely":[97],"used":[98,125],"high-speed":[101,176],"railways":[102],"at":[103],"present.":[104],"a":[107],"based":[111],"on":[112,173],"track":[113],"circuit":[114],"balise":[116],"transmit":[118],"movement":[119],"authority":[120],"information,":[121,154],"which":[122,155],"mainly":[124],"200":[127],"~":[128],"250":[129],"km/h":[130,175],"railways;":[131],"adopts":[136],"Global":[137],"for":[139,142],"Mobile":[140],"Communications":[141],"Railway":[143],"(GSM-R)":[144],"wireless":[145],"communication":[146],"realize":[148],"two-way":[149],"realtime":[150],"transmission":[151],"train-ground":[153],"meets":[156],"requirements":[158],"speed,":[161],"density":[163],"cross-line":[165],"EMUs":[168],"different":[170],"classes":[172],"300~350":[174],"railway":[177],"lines":[178],"China.":[180],"This":[181],"paper":[182],"studies":[183],"realization":[186],"ground":[189],"core":[190],"CTCS-2,":[193],"center,":[196],"briefly":[198],"introduces":[199],"its":[200],"maintenance":[201],"experience.":[202]},"counts_by_year":[{"year":2025,"cited_by_count":1}],"updated_date":"2026-10-17T09:40:24.721904","created_date":"2024-06-08T00:00:00"}
