{"id":"https://openalex.org/W4394597399","doi":"https://doi.org/10.1109/apet59977.2023.10489032","title":"Research on the Planning and Construction Path of the North Bund Demonstration Area for New-Type Power Systems","display_name":"Research on the Planning and Construction Path of the North Bund Demonstration Area for New-Type Power Systems","alternate_titles":[],"publication_year":2023,"publication_date":"2023-12-28","ids":{"openalex":"https://openalex.org/W4394597399","doi":"https://doi.org/10.1109/apet59977.2023.10489032"},"language":"en","primary_location":{"id":"doi:10.1109/apet59977.2023.10489032","doi":"https://doi.org/10.1109/apet59977.2023.10489032","is_oa":false,"landing_page_url":"https://doi.org/10.1109/apet59977.2023.10489032","pdf_url":null,"source":{"id":"https://openalex.org/S7407087241","display_name":"Asia Power and Electrical Technology Conference (APET)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 2nd Asia Power and Electrical Technology Conference (APET)","raw_type":"proceedings-article"},"parent_works":[],"lineage":["https://openalex.org/W4394597399"],"child_works_count":0,"type":"conference-paper","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5025053306","display_name":"Fan Ye","orcid":"https://orcid.org/0000-0002-1089-1498","observed_orcids":["https://orcid.org/0000-0002-1089-1498"]},"institutions":[{"id":"https://openalex.org/I17442442","display_name":"State Grid Corporation of China (China)","ror":"https://ror.org/05twwhs70","country_code":"CN","type":"company","lineage":["https://openalex.org/I17442442"]}],"countries":["CN"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Ye Fan","raw_affiliation_strings":["Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","institution_ids":["https://openalex.org/I17442442"]},{"raw_affiliation_string":"State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":null,"display_name":"Weijun Yu","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I17442442","display_name":"State Grid Corporation of China (China)","ror":"https://ror.org/05twwhs70","country_code":"CN","type":"company","lineage":["https://openalex.org/I17442442"]}],"countries":["CN"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Weijun Yu","raw_affiliation_strings":["Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","institution_ids":["https://openalex.org/I17442442"]},{"raw_affiliation_string":"State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100439725","display_name":"Cheng Zhang","orcid":"https://orcid.org/0009-0007-3219-8663","observed_orcids":["https://orcid.org/0009-0007-3219-8663"]},"institutions":[{"id":"https://openalex.org/I17442442","display_name":"State Grid Corporation of China (China)","ror":"https://ror.org/05twwhs70","country_code":"CN","type":"company","lineage":["https://openalex.org/I17442442"]}],"countries":["CN"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Cheng Zhang","raw_affiliation_strings":["Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","institution_ids":["https://openalex.org/I17442442"]},{"raw_affiliation_string":"State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5023536775","display_name":"Jiehua Ju","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I17442442","display_name":"State Grid Corporation of China (China)","ror":"https://ror.org/05twwhs70","country_code":"CN","type":"company","lineage":["https://openalex.org/I17442442"]}],"countries":["CN"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Jiehua Ju","raw_affiliation_strings":["Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","institution_ids":["https://openalex.org/I17442442"]},{"raw_affiliation_string":"State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5007994973","display_name":"Zhufu Shen","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I17442442","display_name":"State Grid Corporation of China (China)","ror":"https://ror.org/05twwhs70","country_code":"CN","type":"company","lineage":["https://openalex.org/I17442442"]}],"countries":["CN"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Zhufu Shen","raw_affiliation_strings":["Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","institution_ids":["https://openalex.org/I17442442"]},{"raw_affiliation_string":"State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5007494992","display_name":"Kunqi Jia","orcid":"https://orcid.org/0000-0003-1774-2927","observed_orcids":["https://orcid.org/0000-0003-1774-2927"]},"institutions":[{"id":"https://openalex.org/I17442442","display_name":"State Grid Corporation of China (China)","ror":"https://ror.org/05twwhs70","country_code":"CN","type":"company","lineage":["https://openalex.org/I17442442"]}],"countries":["CN"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Kunqi Jia","raw_affiliation_strings":["Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Electric Power Supply Company,State Grid Shanghai Urban,Shanghai,China","institution_ids":["https://openalex.org/I17442442"]},{"raw_affiliation_string":"State Grid Shanghai Urban, Electric Power Supply Company, Shanghai, China","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I17442442"],"apc_list":null,"apc_paid":null,"fwci":0.3836,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.37787895,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":87,"max":92},"biblio":{"volume":null,"issue":null,"first_page":"928","last_page":"933"},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.5282999873161316,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.5282999873161316,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12451","display_name":"Smart Grid and Power Systems","score":0.4081999957561493,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.03359999880194664,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/new-type-power-system","display_name":"new-type power system","score":0.9890000224113464},{"id":"https://openalex.org/keywords/shanghai","display_name":"Shanghai","score":0.3799999952316284},{"id":"https://openalex.org/keywords/dual-carbon-strategy","display_name":"dual carbon strategy","score":0.7739999890327454},{"id":"https://openalex.org/keywords/low-carbon-transition","display_name":"low-carbon transition","score":0.6150000095367432},{"id":"https://openalex.org/keywords/energy-efficiency","display_name":"energy efficiency","score":0.6380000114440918},{"id":"https://openalex.org/keywords/smart-grid","display_name":"smart grid","score":0.5320000052452087},{"id":"https://openalex.org/keywords/distribution-system-resilience","display_name":"distribution network resilience","score":0.824999988079071},{"id":"https://openalex.org/keywords/urban-power-supply","display_name":"urban power supply","score":0.4359999895095825}],"concepts":[{"id":"https://openalex.org/C2777735758","wikidata":"https://www.wikidata.org/wiki/Q817765","display_name":"Path (computing)","level":2,"score":0.5684682130813599},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5414431691169739},{"id":"https://openalex.org/C2777299769","wikidata":"https://www.wikidata.org/wiki/Q3707858","display_name":"Type (biology)","level":2,"score":0.47859713435173035},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.45576414465904236},{"id":"https://openalex.org/C199360897","wikidata":"https://www.wikidata.org/wiki/Q9143","display_name":"Programming language","level":1,"score":0.14212995767593384},{"id":"https://openalex.org/C127313418","wikidata":"https://www.wikidata.org/wiki/Q1069","display_name":"Geology","level":0,"score":0.12100932002067566},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C151730666","wikidata":"https://www.wikidata.org/wiki/Q7205","display_name":"Paleontology","level":1,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/apet59977.2023.10489032","doi":"https://doi.org/10.1109/apet59977.2023.10489032","is_oa":false,"landing_page_url":"https://doi.org/10.1109/apet59977.2023.10489032","pdf_url":null,"source":{"id":"https://openalex.org/S7407087241","display_name":"Asia Power and Electrical Technology Conference (APET)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 2nd Asia Power and Electrical Technology Conference (APET)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":1.0,"display_name":"Industry, innovation and infrastructure","id":"https://metadata.un.org/sdg/9"},{"score":0.9853000044822693,"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7"},{"score":0.761900007724762,"display_name":"Sustainable cities and communities","id":"https://metadata.un.org/sdg/11"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":5,"referenced_works":["https://openalex.org/W2810596115","https://openalex.org/W3048858172","https://openalex.org/W3120844199","https://openalex.org/W4322731590","https://openalex.org/W6960045453"],"related_works":["https://openalex.org/W4408521435","https://openalex.org/W4226100325","https://openalex.org/W4396766578","https://openalex.org/W4399899893","https://openalex.org/W4407737629","https://openalex.org/W4388214795","https://openalex.org/W4410393847","https://openalex.org/W4402996559","https://openalex.org/W4405937539","https://openalex.org/W4405930014"],"abstract_inverted_index":{"The":[0,134],"new-type":[1,10,49,116,207],"power":[2,25,50,117,143,149,208,245],"system,":[3,12],"as":[4],"an":[5,196],"important":[6,197],"carrier":[7],"of":[8,22,30,80,88,98,114,142,147,155,176,180,191,199,214,243],"the":[9,14,19,27,48,53,58,62,73,76,81,85,91,99,102,110,115,139,145,148,153,156,161,173,177,186,212,227,235,241,248],"energy":[11,23,92,174],"is":[13,195],"key":[15,106],"to":[16,18,56,138,184,210,240,251],"contribute":[17],"high-quality":[20],"development":[21,70,79],"and":[24,67,72,78,94,120,123,128,132,152,159,220,237],"under":[26],"mutual":[28],"constraints":[29],"security-economy-low-carbon.":[31],"State":[32,63],"Grid":[33],"Shanghai":[34],"Urban":[35],"Electric":[36],"Power":[37],"Supply":[38],"Company":[39],"(SUEPSC)":[40],"actively":[41],"builds":[42],"a":[43,206,231,238],"comprehensive":[44],"demonstration":[45,103,135],"zone":[46,104,136],"for":[47,75,166],"system":[51,118,209],"on":[52],"North":[54,82,100,215,228],"Bund":[55,194,229],"implement":[57],"national":[59],"dual-carbon":[60],"strategy,":[61],"Grid's":[64],"\u2018one":[65],"body":[66],"four":[68],"wings'":[69],"layout":[71],"requirements":[74],"construction":[77,107,213],"Bund.":[83],"With":[84],"primary":[86],"goal":[87,190],"comprehensively":[89],"promoting":[90],"efficiency":[93],"green":[95],"low-carbon":[96],"transformation":[97],"Bund,":[101],"identifies":[105],"tasks":[108],"from":[109],"five":[111],"characteristic":[112],"directions":[113],"(clean":[119],"low-carbon,":[121],"safe":[122],"abundant,":[124],"economically":[125],"efficient,":[126],"supply":[127],"demand":[129,175],"synergy,":[130],"flexible":[131],"intelligent).":[133],"promotes":[137],"cleanliness":[140],"progress":[141],"side,":[144,158],"intelligentization":[146],"grid":[150],"side":[151],"electrification":[154],"user":[157],"explores":[160],"highly":[162],"resilient":[163,221],"distribution":[164],"network":[165],"modern":[167],"smart":[168],"city":[169],"that":[170],"can":[171],"match":[172],"central":[178],"part":[179],"megacity.":[181],"In":[182],"order":[183],"support":[185],"Hongkou":[187],"District":[188],"Government's":[189],"building":[192,205],"\u201cNorth":[193],"corner":[198],"Shanghai's":[200],"Golden":[201],"Triangle\u201d,":[202],"we":[203],"are":[204],"complement":[211],"Bund\u2019":[216],"s":[217],"digital":[218],"metropolis":[219],"city.":[222],"We":[223],"will":[224],"ultimately":[225],"build":[226],"into":[230],"world-class":[232],"parlor":[233],"leading":[234],"world":[236,242],"window":[239],"China":[244],"supply,":[246],"serving":[247],"Chinese":[249],"path":[250],"modernization.":[252]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W4394597399","counts_by_year":[{"year":2025,"cited_by_count":1}],"updated_date":"2026-11-16T12:05:36.265796","created_date":"2024-04-10T00:00:00"}
