{"id":"https://openalex.org/W4312479225","doi":"https://doi.org/10.1109/icpre55555.2022.9960398","title":"Optimal Scheduling Method for Battery Energy Storage Based on Adaptive Time Granularity","display_name":"Optimal Scheduling Method for Battery Energy Storage Based on Adaptive Time Granularity","alternate_titles":[],"publication_year":2022,"publication_date":"2022-09-23","ids":{"openalex":"https://openalex.org/W4312479225","doi":"https://doi.org/10.1109/icpre55555.2022.9960398"},"language":"en","primary_location":{"id":"doi:10.1109/icpre55555.2022.9960398","doi":"https://doi.org/10.1109/icpre55555.2022.9960398","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icpre55555.2022.9960398","pdf_url":null,"source":{"id":"https://openalex.org/S4363607890","display_name":"International Conference on Power and Renewable Energy (ICPRE)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2022 7th International Conference on Power and Renewable Energy (ICPRE)","raw_type":"proceedings-article"},"parent_works":[],"lineage":["https://openalex.org/W4312479225"],"child_works_count":0,"type":"conference-paper","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":null,"display_name":"Shuchen Luo","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4387155567","display_name":"State Grid Hunan Electric Power Company Limited","ror":"https://ror.org/00e17m144","country_code":"CN","type":"company","lineage":["https://openalex.org/I4387155567"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Shuchen Luo","raw_affiliation_strings":["Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","institution_ids":["https://openalex.org/I4387155567"]},{"raw_affiliation_string":"State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China","institution_ids":["https://openalex.org/I4387155567"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100609906","display_name":"Ming Wen","orcid":"https://orcid.org/0000-0002-8672-2199","observed_orcids":["https://orcid.org/0000-0002-8672-2199"]},"institutions":[{"id":"https://openalex.org/I4387155567","display_name":"State Grid Hunan Electric Power Company Limited","ror":"https://ror.org/00e17m144","country_code":"CN","type":"company","lineage":["https://openalex.org/I4387155567"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Ming Wen","raw_affiliation_strings":["Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","institution_ids":["https://openalex.org/I4387155567"]},{"raw_affiliation_string":"State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China","institution_ids":["https://openalex.org/I4387155567"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5035374461","display_name":"Wenying Li","orcid":"https://orcid.org/0000-0002-7104-3505","observed_orcids":["https://orcid.org/0000-0002-7104-3505"]},"institutions":[{"id":"https://openalex.org/I4387155567","display_name":"State Grid Hunan Electric Power Company Limited","ror":"https://ror.org/00e17m144","country_code":"CN","type":"company","lineage":["https://openalex.org/I4387155567"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Wenying Li","raw_affiliation_strings":["Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","institution_ids":["https://openalex.org/I4387155567"]},{"raw_affiliation_string":"State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China","institution_ids":["https://openalex.org/I4387155567"]}]},{"author_position":"middle","author":{"id":null,"display_name":"Jing Liao","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4387155567","display_name":"State Grid Hunan Electric Power Company Limited","ror":"https://ror.org/00e17m144","country_code":"CN","type":"company","lineage":["https://openalex.org/I4387155567"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Jing Liao","raw_affiliation_strings":["Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","institution_ids":["https://openalex.org/I4387155567"]},{"raw_affiliation_string":"State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China","institution_ids":["https://openalex.org/I4387155567"]}]},{"author_position":"middle","author":{"id":null,"display_name":"Dezhi Xiong","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4387155567","display_name":"State Grid Hunan Electric Power Company Limited","ror":"https://ror.org/00e17m144","country_code":"CN","type":"company","lineage":["https://openalex.org/I4387155567"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Dezhi Xiong","raw_affiliation_strings":["State Grid Hunan Electric Power Limited Company Power Supply Service Center (Metrology Center),Hunan Province Key Laboratory of Intelligent Electrical Measurement and Application Technology,Changsha,China","Hunan Province Key Laboratory of Intelligent Electrical Measurement and Application Technology, State Grid Hunan Electric Power Limited Company Power Supply Service Center (Metrology Center), Changsha, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Hunan Electric Power Limited Company Power Supply Service Center (Metrology Center),Hunan Province Key Laboratory of Intelligent Electrical Measurement and Application Technology,Changsha,China","institution_ids":["https://openalex.org/I4387155567"]},{"raw_affiliation_string":"Hunan Province Key Laboratory of Intelligent Electrical Measurement and Application Technology, State Grid Hunan Electric Power Limited Company Power Supply Service Center (Metrology Center), Changsha, China","institution_ids":["https://openalex.org/I4387155567"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5107006147","display_name":"Yuan Zhong","orcid":"https://orcid.org/0009-0003-6509-2700","observed_orcids":["https://orcid.org/0009-0003-6509-2700"]},"institutions":[{"id":"https://openalex.org/I4387155567","display_name":"State Grid Hunan Electric Power Company Limited","ror":"https://ror.org/00e17m144","country_code":"CN","type":"company","lineage":["https://openalex.org/I4387155567"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Yuan Zhong","raw_affiliation_strings":["Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation),State Grid Hunan Electric,Changsha,China","institution_ids":["https://openalex.org/I4387155567"]},{"raw_affiliation_string":"State Grid Hunan Electric, Power Economic and Technology Research Institute (Key Laboratory of Hunan Province for Energy Internet Supply and Demand Operation), Changsha, China","institution_ids":["https://openalex.org/I4387155567"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I4387155567"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.0,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"1010","last_page":"1014"},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.7904999852180481,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.7904999852180481,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.08869999647140503,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.06480000168085098,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/battery-energy-storage","display_name":"battery energy storage","score":0.9390000104904175},{"id":"https://openalex.org/keywords/optimal-scheduling","display_name":"scheduling optimization","score":0.7990000247955322},{"id":"https://openalex.org/keywords/hvac-load","display_name":"HVAC load","score":0.6039999723434448},{"id":"https://openalex.org/keywords/electric-vehicles","display_name":"electric vehicles","score":0.800000011920929},{"id":"https://openalex.org/keywords/wind-power-integration","display_name":"wind power integration","score":0.9860000014305115},{"id":"https://openalex.org/keywords/power-asymmetries","display_name":"power imbalance","score":0.6240000128746033},{"id":"https://openalex.org/keywords/tie-line-power-fluctuation","display_name":"tie-line power fluctuation","score":0.8159999847412109},{"id":"https://openalex.org/keywords/load-variation","display_name":"load variation","score":0.8450000286102295},{"id":"https://openalex.org/keywords/scheduling-cost","display_name":"scheduling cost","score":0.8090000152587891}],"concepts":[{"id":"https://openalex.org/C177774035","wikidata":"https://www.wikidata.org/wiki/Q1246948","display_name":"Granularity","level":2,"score":0.7776052951812744},{"id":"https://openalex.org/C122346748","wikidata":"https://www.wikidata.org/wiki/Q1798773","display_name":"HVAC","level":3,"score":0.7238162755966187},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.635064423084259},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6010103225708008},{"id":"https://openalex.org/C73916439","wikidata":"https://www.wikidata.org/wiki/Q837718","display_name":"Energy storage","level":3,"score":0.4759649634361267},{"id":"https://openalex.org/C48209547","wikidata":"https://www.wikidata.org/wiki/Q1331104","display_name":"Controllability","level":2,"score":0.4737575650215149},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.45075011253356934},{"id":"https://openalex.org/C103742991","wikidata":"https://www.wikidata.org/wiki/Q173725","display_name":"Air conditioning","level":2,"score":0.443861722946167},{"id":"https://openalex.org/C79403827","wikidata":"https://www.wikidata.org/wiki/Q3988","display_name":"Real-time computing","level":1,"score":0.43737804889678955},{"id":"https://openalex.org/C120314980","wikidata":"https://www.wikidata.org/wiki/Q180634","display_name":"Distributed computing","level":1,"score":0.3872971832752228},{"id":"https://openalex.org/C171146098","wikidata":"https://www.wikidata.org/wiki/Q124192","display_name":"Automotive engineering","level":1,"score":0.3508000671863556},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.28535544872283936},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.2334548532962799},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.07463586330413818},{"id":"https://openalex.org/C28826006","wikidata":"https://www.wikidata.org/wiki/Q33521","display_name":"Applied mathematics","level":1,"score":0.0},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/icpre55555.2022.9960398","doi":"https://doi.org/10.1109/icpre55555.2022.9960398","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icpre55555.2022.9960398","pdf_url":null,"source":{"id":"https://openalex.org/S4363607890","display_name":"International Conference on Power and Renewable Energy (ICPRE)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2022 7th International Conference on Power and Renewable Energy (ICPRE)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7","score":1.0},{"display_name":"Industry, innovation and infrastructure","id":"https://metadata.un.org/sdg/9","score":0.5378999710083008},{"display_name":"Climate action","id":"https://metadata.un.org/sdg/13","score":0.4399999976158142}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W3017351921","https://openalex.org/W3194322954","https://openalex.org/W3117775905","https://openalex.org/W3195300296","https://openalex.org/W3012139106","https://openalex.org/W2136002853","https://openalex.org/W3115628979","https://openalex.org/W4403535310","https://openalex.org/W6986101270","https://openalex.org/W4320061287"],"abstract_inverted_index":{"With":[0],"the":[1,12,15,21,59,91,100,112,117,120,125,129],"integration":[2],"of":[3,20,61,77,93,119,131],"many":[4],"intermittent":[5],"and":[6,17,31,38,54,79,128],"distributed":[7],"new":[8],"energy":[9,40],"sources":[10],"into":[11],"power":[13,22,62,68],"grid,":[14],"safe":[16],"stable":[18],"operation":[19],"system":[23],"is":[24,88,97],"facing":[25],"huge":[26],"challenges.":[27],"HVAC":[28,78],"(Heating,":[29],"Ventilation":[30],"Air":[32],"Conditioning,":[33],"HVAC),":[34],"electric":[35],"vehicles":[36],"(EV),":[37],"battery":[39],"storage":[41],"(BESS)":[42],"can":[43,115],"be":[44],"a":[45],"solution":[46],"to":[47,51,90],"this":[48,70,104],"problem":[49,60],"due":[50],"high":[52],"flexibility":[53],"strong":[55],"controllability.":[56],"Aiming":[57],"at":[58],"imbalance":[63],"caused":[64],"by":[65,99],"large-scale":[66],"wind":[67],"integration,":[69],"paper":[71],"proposed":[72],"an":[73],"optimal":[74],"scheduling":[75,94,126],"method":[76],"BESS":[80],"based":[81],"on":[82],"adaptive":[83],"time":[84,113],"granularity.":[85],"Time":[86],"granularity":[87,114],"critical":[89],"optimization":[92],"methods,":[95],"which":[96],"decided":[98],"load":[101],"fluctuation":[102,118],"in":[103],"paper.":[105],"The":[106],"simulation":[107],"results":[108],"showed":[109],"that":[110],"reducing":[111],"smooth":[116],"tie-line":[121],"but":[122],"would":[123],"increase":[124],"cost":[127],"amount":[130],"calculation.":[132]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W4312479225","counts_by_year":[],"updated_date":"2026-11-14T11:04:58.165337","created_date":"2023-01-05T00:00:00"}
