{"id":"https://openalex.org/W3116524930","doi":"https://doi.org/10.24160/0013-5380-2020-12-14-30","title":"From the GOELRO Plan to Digitalization of Russia\u2019s Electric Power Complex","display_name":"From the GOELRO Plan to Digitalization of Russia\u2019s Electric Power Complex","publication_year":2020,"publication_date":"2020-01-01","ids":{"openalex":"https://openalex.org/W3116524930","doi":"https://doi.org/10.24160/0013-5380-2020-12-14-30","mag":"3116524930"},"language":"en","primary_location":{"id":"doi:10.24160/0013-5380-2020-12-14-30","doi":"https://doi.org/10.24160/0013-5380-2020-12-14-30","is_oa":false,"landing_page_url":"https://doi.org/10.24160/0013-5380-2020-12-14-30","pdf_url":null,"source":{"id":"https://openalex.org/S4210178776","display_name":"Elektrichestvo","issn_l":"0013-5380","issn":["0013-5380","2411-1333"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":["russia-white-list-1"],"host_organization":"https://openalex.org/I171241948","host_organization_name":"Moscow Power Engineering Institute","host_organization_lineage":["https://openalex.org/I171241948"],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Elektrichestvo","raw_type":"journal-article"},"volume":null,"type":"article","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5012509588","display_name":"Alexey Loskutov","orcid":"https://orcid.org/0000-0003-1961-1728","observed_orcids":["https://orcid.org/0000-0003-1961-1728"]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Aleksey B. LOSKUTOV","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]},{"author_position":"middle","author":{"id":"https://openalex.org/A5018119627","display_name":"\u0410\u043b\u0435\u043a\u0441\u0430\u043d\u0434\u0440 \u041b\u0435\u043e\u043d\u0438\u0434\u043e\u0432\u0438\u0447 \u041a\u0443\u043b\u0438\u043a\u043e\u0432","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Aleksandr L. KULIKOV","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]},{"author_position":"middle","author":{"id":"https://openalex.org/A5030567068","display_name":"Pavel V. ILYUSHIN","orcid":"https://orcid.org/0000-0002-5183-3040","observed_orcids":["https://orcid.org/0000-0002-5183-3040"]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Pavel V. ILYUSHIN","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]},{"author_position":"last","author":{"id":"https://openalex.org/A5143033580","display_name":"St. Petersburg Federal State educational establishment","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Federal State educational establishment, St. Petersburg","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.2582,"has_fulltext":false,"cited_by_count":5,"citation_normalized_percentile":{"value":0.48102169,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":93,"max":96},"biblio":{"volume":"12","issue":"12","first_page":"14","last_page":"30"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T12451","display_name":"Smart Grid and Power Systems","score":0.9526000022888184,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T12451","display_name":"Smart Grid and Power Systems","score":0.9526000022888184,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13975","display_name":"Energy, Economy, and Technology Trends","score":0.0210999995470047,"subfield":{"id":"https://openalex.org/subfields/2105","display_name":"Renewable Energy, Sustainability and the Environment"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.005900000222027302,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/goelro-plan","display_name":"GOELRO plan","score":0.9810000061988831},{"id":"https://openalex.org/keywords/smart-grid","display_name":"smart grid","score":0.5889999866485596},{"id":"https://openalex.org/keywords/renewable-energy-integration","display_name":"renewable energy integration","score":0.6800000071525574},{"id":"https://openalex.org/keywords/distributed-generation","display_name":"distributed generation","score":0.6119999885559082},{"id":"https://openalex.org/keywords/electricity-market","display_name":"electricity market","score":0.7269999980926514},{"id":"https://openalex.org/keywords/power-losses","display_name":"power losses","score":0.6010000109672546},{"id":"https://openalex.org/keywords/active-consumers","display_name":"active consumers","score":0.5920000076293945},{"id":"https://openalex.org/keywords/history-of-electrification","display_name":"history of electrification","score":0.777999997138977}],"concepts":[{"id":"https://openalex.org/C2778324724","wikidata":"https://www.wikidata.org/wiki/Q1076056","display_name":"Electrification","level":3,"score":0.8510968685150146},{"id":"https://openalex.org/C48209547","wikidata":"https://www.wikidata.org/wiki/Q1331104","display_name":"Controllability","level":2,"score":0.7153325080871582},{"id":"https://openalex.org/C10558101","wikidata":"https://www.wikidata.org/wiki/Q689855","display_name":"Smart grid","level":2,"score":0.6840750575065613},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.6360690593719482},{"id":"https://openalex.org/C2775922551","wikidata":"https://www.wikidata.org/wiki/Q7135033","display_name":"Parallels","level":2,"score":0.6347434520721436},{"id":"https://openalex.org/C2776505523","wikidata":"https://www.wikidata.org/wiki/Q4785468","display_name":"Plan (archaeology)","level":2,"score":0.6013855338096619},{"id":"https://openalex.org/C40293303","wikidata":"https://www.wikidata.org/wiki/Q27137","display_name":"Electric power","level":3,"score":0.5077915787696838},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.46925923228263855},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.4497867524623871},{"id":"https://openalex.org/C36299963","wikidata":"https://www.wikidata.org/wiki/Q1369844","display_name":"Observability","level":2,"score":0.448427677154541},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.44540396332740784},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.4364296793937683},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.43291914463043213},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.43041715025901794},{"id":"https://openalex.org/C76155785","wikidata":"https://www.wikidata.org/wiki/Q418","display_name":"Telecommunications","level":1,"score":0.39844417572021484},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.3135891258716583},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.2595735788345337},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.24017104506492615},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.21151208877563477},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.18752655386924744},{"id":"https://openalex.org/C166957645","wikidata":"https://www.wikidata.org/wiki/Q23498","display_name":"Archaeology","level":1,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C95457728","wikidata":"https://www.wikidata.org/wiki/Q309","display_name":"History","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C28826006","wikidata":"https://www.wikidata.org/wiki/Q33521","display_name":"Applied mathematics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.24160/0013-5380-2020-12-14-30","doi":"https://doi.org/10.24160/0013-5380-2020-12-14-30","is_oa":false,"landing_page_url":"https://doi.org/10.24160/0013-5380-2020-12-14-30","pdf_url":null,"source":{"id":"https://openalex.org/S4210178776","display_name":"Elektrichestvo","issn_l":"0013-5380","issn":["0013-5380","2411-1333"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":["russia-white-list-1"],"host_organization":"https://openalex.org/I171241948","host_organization_name":"Moscow Power Engineering Institute","host_organization_lineage":["https://openalex.org/I171241948"],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Elektrichestvo","raw_type":"journal-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":1.0,"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure"},{"score":0.9853000044822693,"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W142971227","https://openalex.org/W3117594841","https://openalex.org/W2992110576","https://openalex.org/W1973977199","https://openalex.org/W3174378953","https://openalex.org/W3213819212","https://openalex.org/W162516830","https://openalex.org/W4386589116","https://openalex.org/W2953784746","https://openalex.org/W2481680309"],"abstract_inverted_index":{"Owing":[0],"to":[1,16,34,49,57,69,98],"adoption":[2],"of":[3,24,32,37,54,73,91,134,151],"the":[4,18,29,38,42,47,55,86,96,121,142,147],"GOELRO":[5,143],"plan":[6],"in":[7,66,85],"1920":[8],"and":[9,62,68,75,106,109,123,131,137],"its":[10,25],"stage-by-state":[11],"implementation,":[12],"it":[13],"became":[14],"possible":[15],"meet":[17],"country\u2019s":[19],"needs":[20],"for":[21,119,149],"intense":[22],"development":[23],"economy":[26],"through":[27],"providing":[28],"required":[30],"amounts":[31],"electricity":[33,87],"all":[35],"sectors":[36],"national":[39],"economy.":[40],"Nowadays,":[41],"smart":[43,92,135],"grid":[44,93],"technologies":[45,94,133],"open":[46],"possibility":[48,97],"carry":[50],"out":[51],"\u00abdigital":[52],"updating\u00bb":[53],"grids":[56,136],"obtain":[58],"their":[59],"better":[60],"observability":[61],"controllability,":[63],"smaller":[64],"losses":[65],"them,":[67],"ensure":[70],"reliable":[71],"operation":[72],"distributed":[74],"renewable":[76],"power":[77,103,117],"generating":[78],"facilities,":[79],"which":[80,145],"have":[81],"become":[82],"new":[83],"participants":[84],"market.":[88],"The":[89,126],"use":[90],"opens":[95],"optimally":[99],"integrate":[100],"heterogeneous":[101],"electric":[102,116],"sources,":[104],"backbone":[105],"distribution":[107],"networks,":[108],"also":[110],"active":[111],"consumers":[112],"into":[113],"a":[114],"unified":[115],"complex":[118],"achieving":[120],"economic":[122],"environmental":[124],"objectives.":[125],"article":[127],"considers":[128],"modern":[129],"innovative":[130],"prospective":[132],"outlines":[138],"historical":[139],"parallels":[140],"with":[141],"plan,":[144],"determined":[146],"course":[148],"electrification":[150],"Russia.":[152]},"counts_by_year":[{"year":2024,"cited_by_count":2},{"year":2022,"cited_by_count":3}],"updated_date":"2026-10-07T09:51:55.459714","created_date":"2021-01-05T00:00:00"}
