{"id":"https://openalex.org/W2920833830","doi":"https://doi.org/10.1109/gcwcn.2018.8668612","title":"Application of Dynamic Programming Algorithm for Thermal Unit Commitment with Wind Power","display_name":"Application of Dynamic Programming Algorithm for Thermal Unit Commitment with Wind Power","alternate_titles":[],"publication_year":2018,"publication_date":"2018-11-01","ids":{"openalex":"https://openalex.org/W2920833830","doi":"https://doi.org/10.1109/gcwcn.2018.8668612","mag":"2920833830"},"language":"en","primary_location":{"id":"doi:10.1109/gcwcn.2018.8668612","doi":"https://doi.org/10.1109/gcwcn.2018.8668612","is_oa":false,"landing_page_url":"https://doi.org/10.1109/gcwcn.2018.8668612","pdf_url":null,"source":{"id":"https://openalex.org/S7407086302","display_name":"IEEE Global Conference on Wireless Computing and Networking (GCWCN)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2018 IEEE Global Conference on Wireless Computing and Networking (GCWCN)","raw_type":"proceedings-article"},"parent_works":[],"lineage":["https://openalex.org/W2920833830"],"child_works_count":0,"type":"conference-paper","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5006239206","display_name":"Sarika V. Tade","orcid":"https://orcid.org/0009-0005-3085-6090","observed_orcids":["https://orcid.org/0009-0005-3085-6090"]},"institutions":[],"countries":[],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Sarika V. Tade","raw_affiliation_strings":["GCOE, Chandrapur"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"GCOE, Chandrapur","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5061715706","display_name":"Vilas N. Ghate","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Vilas N. Ghate","raw_affiliation_strings":["GCOE, Chandrapur"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"GCOE, Chandrapur","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5020760462","display_name":"Shadab Q. Mulla","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Shadab Q. Mulla","raw_affiliation_strings":["GCOE, Chandrapur"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"GCOE, Chandrapur","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5039390133","display_name":"Manohar N. Kalgunde","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"M. N. Kalgunde","raw_affiliation_strings":["GCOE, Chandrapur"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"GCOE, Chandrapur","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":1.4572,"has_fulltext":false,"cited_by_count":11,"citation_normalized_percentile":{"value":0.77194075,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":86,"max":96},"biblio":{"volume":null,"issue":null,"first_page":"182","last_page":"186"},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":9.999999747378752e-05,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11941","display_name":"Power System Reliability and Maintenance","score":0.0,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/thermal-unit-commitment","display_name":"thermal unit commitment","score":0.9769999980926514},{"id":"https://openalex.org/keywords/wind-power-integration","display_name":"wind power integration","score":0.9470000267028809},{"id":"https://openalex.org/keywords/dynamic-programming","display_name":"dynamic programming","score":0.7250000238418579},{"id":"https://openalex.org/keywords/day-ahead-scheduling","display_name":"day-ahead scheduling","score":0.7720000147819519},{"id":"https://openalex.org/keywords/renewable-energy-uncertainty","display_name":"renewable energy uncertainty","score":0.5270000100135803},{"id":"https://openalex.org/keywords/thermal-generation-scheduling","display_name":"thermal generation scheduling","score":0.6269999742507935}],"concepts":[{"id":"https://openalex.org/C116219307","wikidata":"https://www.wikidata.org/wiki/Q7236625","display_name":"Power system simulation","level":4,"score":0.7734241485595703},{"id":"https://openalex.org/C78600449","wikidata":"https://www.wikidata.org/wiki/Q43302","display_name":"Wind power","level":2,"score":0.7290422916412354},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.5846649408340454},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.560850977897644},{"id":"https://openalex.org/C2039551","wikidata":"https://www.wikidata.org/wiki/Q200297","display_name":"Thermal power station","level":2,"score":0.5513135194778442},{"id":"https://openalex.org/C37404715","wikidata":"https://www.wikidata.org/wiki/Q380679","display_name":"Dynamic programming","level":2,"score":0.531681478023529},{"id":"https://openalex.org/C148027188","wikidata":"https://www.wikidata.org/wiki/Q907375","display_name":"Unit testing","level":3,"score":0.5263113975524902},{"id":"https://openalex.org/C204530211","wikidata":"https://www.wikidata.org/wiki/Q752823","display_name":"Thermal","level":2,"score":0.5244137048721313},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.4667205214500427},{"id":"https://openalex.org/C161067210","wikidata":"https://www.wikidata.org/wiki/Q1464943","display_name":"Wind speed","level":2,"score":0.463430255651474},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.46174293756484985},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.4482264816761017},{"id":"https://openalex.org/C11413529","wikidata":"https://www.wikidata.org/wiki/Q8366","display_name":"Algorithm","level":1,"score":0.36152830719947815},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.3395277261734009},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.30966001749038696},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.2941482663154602},{"id":"https://openalex.org/C153294291","wikidata":"https://www.wikidata.org/wiki/Q25261","display_name":"Meteorology","level":1,"score":0.1685425341129303},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.15206322073936462},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.14341866970062256},{"id":"https://openalex.org/C149635348","wikidata":"https://www.wikidata.org/wiki/Q193040","display_name":"Embedded system","level":1,"score":0.10281801223754883},{"id":"https://openalex.org/C199360897","wikidata":"https://www.wikidata.org/wiki/Q9143","display_name":"Programming language","level":1,"score":0.0},{"id":"https://openalex.org/C2777904410","wikidata":"https://www.wikidata.org/wiki/Q7397","display_name":"Software","level":2,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C74172769","wikidata":"https://www.wikidata.org/wiki/Q1446839","display_name":"Routing (electronic design automation)","level":2,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/gcwcn.2018.8668612","doi":"https://doi.org/10.1109/gcwcn.2018.8668612","is_oa":false,"landing_page_url":"https://doi.org/10.1109/gcwcn.2018.8668612","pdf_url":null,"source":{"id":"https://openalex.org/S7407086302","display_name":"IEEE Global Conference on Wireless Computing and Networking (GCWCN)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2018 IEEE Global Conference on Wireless Computing and Networking (GCWCN)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.9853000044822693,"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":12,"referenced_works":["https://openalex.org/W1966683033","https://openalex.org/W1974790036","https://openalex.org/W1983086686","https://openalex.org/W2020403133","https://openalex.org/W2084523894","https://openalex.org/W2133933797","https://openalex.org/W2136888281","https://openalex.org/W2145996637","https://openalex.org/W2146273292","https://openalex.org/W2187997309","https://openalex.org/W2418518043","https://openalex.org/W2891010875"],"related_works":["https://openalex.org/W2080980813","https://openalex.org/W2089612677","https://openalex.org/W2275550530","https://openalex.org/W4200542523","https://openalex.org/W2737181878","https://openalex.org/W2366738782","https://openalex.org/W1992008440","https://openalex.org/W2357229769","https://openalex.org/W2896199342","https://openalex.org/W2767644260"],"abstract_inverted_index":{"The":[0,19],"integration":[1,26],"of":[2,6,21,27,50,62],"renewable":[3],"power":[4,36],"plants":[5],"the":[7,14,60,82,114,119],"random":[8],"nature":[9],"brings":[10],"new":[11],"challenges":[12],"to":[13,46,101],"conventional":[15],"unit":[16],"commitment":[17],"problem.":[18],"scheduling":[20,49],"thermal":[22,51,70,89],"generation":[23,52],"units":[24,71,90],"with":[25,68,77,104,113],"wind":[28,35,54,73,96],"farm":[29,55,74,97],"is":[30,56,75,85,98],"usually":[31],"based":[32],"on":[33,37],"forecasted":[34],"day-ahead":[38],"basis.":[39],"In":[40],"this":[41],"paper,":[42],"Dynamic":[43],"Programming":[44],"Algorithm":[45],"find":[47],"optimum":[48],"considering":[53,87],"proposed.":[57],"To":[58],"show":[59],"usefulness":[61],"proposed":[63],"algorithm,":[64],"a":[65,93,102],"test":[66,83],"model":[67,84,103],"ten":[69],"and":[72,91,111],"presented":[76,110],"two":[78],"different":[79,115],"combinations.":[80],"Initially,":[81],"formed":[86],"only":[88],"in":[92,118],"second":[94],"stage":[95],"introduced":[99],"leading":[100],"wind-thermal":[105],"coordination.":[106],"Obtained":[107],"results":[108],"are":[109],"compared":[112],"methods":[116],"available":[117],"literature.":[120]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W2920833830","counts_by_year":[{"year":2026,"cited_by_count":1},{"year":2024,"cited_by_count":1},{"year":2023,"cited_by_count":2},{"year":2022,"cited_by_count":3},{"year":2021,"cited_by_count":1},{"year":2020,"cited_by_count":1},{"year":2019,"cited_by_count":1},{"year":2018,"cited_by_count":1}],"updated_date":"2026-11-17T12:49:18.490984","created_date":"2019-03-22T00:00:00"}
