{"id":"https://openalex.org/W2908090236","doi":"https://doi.org/10.1201/9781351180078-9","title":"Congestion management and transmission tariff","display_name":"Congestion management and transmission tariff","alternate_titles":[],"publication_year":2018,"publication_date":"2018-01-12","ids":{"openalex":"https://openalex.org/W2908090236","doi":"https://doi.org/10.1201/9781351180078-9","mag":"2908090236"},"language":"en","primary_location":{"id":"doi:10.1201/9781351180078-9","doi":"https://doi.org/10.1201/9781351180078-9","is_oa":false,"landing_page_url":"https://doi.org/10.1201/9781351180078-9","pdf_url":null,"source":{"id":"https://openalex.org/S4306463075","display_name":"CRC Press eBooks","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310320584","host_organization_name":"CRC Press","host_organization_lineage":["https://openalex.org/P4310320584","https://openalex.org/P4310320547","https://openalex.org/P4310320449"],"host_organization_lineage_names":["CRC Press","Taylor & Francis","Informa"],"type":"ebook platform"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Power System Economic and Market Operations","raw_type":"book-chapter"},"parent_works":[{"id":"https://openalex.org/W2889348566","display_name":"Power System Economic and Market Operations","relationship":"volume","link_type":"volume"}],"lineage":["https://openalex.org/W2908090236","https://openalex.org/W2889348566"],"child_works_count":0,"pull_notice_works":[],"type":"book-chapter","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":null,"display_name":"Jin Zhong","type":null,"orcid":null,"observed_orcids":[]},"acted_on_behalf_of":[],"institutions":[],"countries":[],"is_corresponding":true,"contributor_roles":[],"raw_author_name":"Jin Zhong","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"reviewed_by_count":0,"citation_normalized_percentile":{"value":0.0,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"185","last_page":"193"},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.0,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11941","display_name":"Power System Reliability and Maintenance","score":0.0,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/congestion-management","display_name":"congestion management","score":0.7699999809265137},{"id":"https://openalex.org/keywords/transmission-tariffs","display_name":"transmission tariffs","score":0.800000011920929},{"id":"https://openalex.org/keywords/electricity-market","display_name":"electricity market","score":0.5979999899864197},{"id":"https://openalex.org/keywords/locational-marginal-pricing","display_name":"locational marginal pricing","score":0.9200000166893005},{"id":"https://openalex.org/keywords/zonal-pricing","display_name":"zonal pricing","score":0.9959999918937683},{"id":"https://openalex.org/keywords/congestion-charges","display_name":"congestion charges","score":0.9909999966621399},{"id":"https://openalex.org/keywords/transmission-rights","display_name":"transmission rights","score":1.0}],"concepts":[{"id":"https://openalex.org/C2776060655","wikidata":"https://www.wikidata.org/wiki/Q52389","display_name":"Tariff","level":2,"score":0.6195564866065979},{"id":"https://openalex.org/C2984524470","wikidata":"https://www.wikidata.org/wiki/Q18141869","display_name":"Congestion management","level":4,"score":0.5360880494117737},{"id":"https://openalex.org/C761482","wikidata":"https://www.wikidata.org/wiki/Q118093","display_name":"Transmission (telecommunications)","level":2,"score":0.5116038918495178},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.44436532258987427},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.33319616317749023},{"id":"https://openalex.org/C76155785","wikidata":"https://www.wikidata.org/wiki/Q418","display_name":"Telecommunications","level":1,"score":0.2288873791694641},{"id":"https://openalex.org/C155202549","wikidata":"https://www.wikidata.org/wiki/Q178803","display_name":"International trade","level":1,"score":0.12449339032173157},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.043009817600250244},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1201/9781351180078-9","doi":"https://doi.org/10.1201/9781351180078-9","is_oa":false,"landing_page_url":"https://doi.org/10.1201/9781351180078-9","pdf_url":null,"source":{"id":"https://openalex.org/S4306463075","display_name":"CRC Press eBooks","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310320584","host_organization_name":"CRC Press","host_organization_lineage":["https://openalex.org/P4310320584","https://openalex.org/P4310320547","https://openalex.org/P4310320449"],"host_organization_lineage_names":["CRC Press","Taylor & Francis","Informa"],"type":"ebook platform"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Power System Economic and Market Operations","raw_type":"book-chapter"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure","score":0.8970999717712402}],"study_designs":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W2370725491","https://openalex.org/W7100062910","https://openalex.org/W2383820490","https://openalex.org/W2597536125","https://openalex.org/W2228331380","https://openalex.org/W3150480339","https://openalex.org/W2381534181","https://openalex.org/W2785412831","https://openalex.org/W2278679946","https://openalex.org/W2111916575"],"abstract_inverted_index":{"Congestion":[0,45],"is":[1],"one":[2],"of":[3,24],"the":[4,7,21],"issues":[5],"in":[6,37,54],"electricity":[8,11],"market":[9],"that":[10],"cannot":[12],"be":[13],"transmitted":[14],"according":[15],"to":[16,20],"economic":[17],"transactions":[18],"due":[19],"capacity":[22],"limits":[23],"transmission":[25,47,50],"lines.":[26],"In":[27],"this":[28,55],"chapter,":[29],"we":[30],"will":[31],"introduce":[32],"methods":[33],"for":[34],"congestion":[35],"management":[36],"both":[38],"nodal":[39],"pricing-":[40],"and":[41,49],"zonal":[42],"pricing-based":[43],"markets.":[44],"charges,":[46],"rights,":[48],"tariff":[51],"are":[52],"introduced":[53],"chapter.":[56]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W2908090236","counts_by_year":[],"updated_date":"2026-11-14T11:04:58.165337","created_date":"2019-01-11T00:00:00"}
