{"id":"https://openalex.org/W2392323909","doi":null,"title":"Construction of high side slope anchor cable at the Xiaolangdi inlet of the Yellow river","display_name":"Construction of high side slope anchor cable at the Xiaolangdi inlet of the Yellow river","publication_year":2000,"publication_date":"2000-01-01","ids":{"openalex":"https://openalex.org/W2392323909","mag":"2392323909"},"language":"en","primary_location":{"id":"mag:2392323909","doi":null,"is_oa":false,"landing_page_url":"http://en.cnki.com.cn/Article_en/CJFDTOTAL-GXSL200001006.htm","pdf_url":null,"source":{"id":"https://openalex.org/S2764439723","display_name":"Guangxi Water Resources and Hydropower Engineering","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":"Gx Water Resources & Hydropower Engineering","raw_type":null},"volume":null,"type":"article","is_traditional":true,"indexed_in":[],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5101887054","display_name":"Jiang Su","orcid":"https://orcid.org/0000-0002-4711-5441","observed_orcids":["https://orcid.org/0000-0002-4711-5441"]},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Jiang Su","raw_affiliation_strings":["yang[KH\ue0122D]"],"raw_orcid":"https://orcid.org/0000-0002-4711-5441","affiliations":[{"raw_affiliation_string":"yang[KH\ue0122D]","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":["https://openalex.org/A5101887054"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.0,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T13596","display_name":"Grouting, Rheology, and Soil Mechanics","score":0.2858999967575073,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T13596","display_name":"Grouting, Rheology, and Soil Mechanics","score":0.2858999967575073,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11046","display_name":"Geotechnical Engineering and Analysis","score":0.22579999268054962,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11375","display_name":"Geotechnical Engineering and Soil Stabilization","score":0.1597999930381775,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/anchor-cable","display_name":"anchor cable","score":0.8920000195503235},{"id":"https://openalex.org/keywords/yellow-river","display_name":"Yellow River","score":0.9240000247955322},{"id":"https://openalex.org/keywords/slope-reinforcement","display_name":"slope reinforcement","score":0.6859999895095825},{"id":"https://openalex.org/keywords/hole-drilling","display_name":"hole drilling","score":0.367000013589859},{"id":"https://openalex.org/keywords/cable-configuration","display_name":"cable arrangement","score":0.367000013589859},{"id":"https://openalex.org/keywords/construction-quality","display_name":"construction quality","score":0.3959999978542328}],"concepts":[{"id":"https://openalex.org/C201289731","wikidata":"https://www.wikidata.org/wiki/Q1172599","display_name":"Inlet","level":2,"score":0.6486632823944092},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.592029869556427},{"id":"https://openalex.org/C2780812243","wikidata":"https://www.wikidata.org/wiki/Q6505583","display_name":"Laying","level":2,"score":0.4660217761993408},{"id":"https://openalex.org/C187320778","wikidata":"https://www.wikidata.org/wiki/Q1349130","display_name":"Geotechnical engineering","level":1,"score":0.43646910786628723},{"id":"https://openalex.org/C147176958","wikidata":"https://www.wikidata.org/wiki/Q77590","display_name":"Civil engineering","level":1,"score":0.3849521279335022},{"id":"https://openalex.org/C66938386","wikidata":"https://www.wikidata.org/wiki/Q633538","display_name":"Structural engineering","level":1,"score":0.22540414333343506},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.12120690941810608}],"mesh":[],"locations_count":1,"locations":[{"id":"mag:2392323909","doi":null,"is_oa":false,"landing_page_url":"http://en.cnki.com.cn/Article_en/CJFDTOTAL-GXSL200001006.htm","pdf_url":null,"source":{"id":"https://openalex.org/S2764439723","display_name":"Guangxi Water Resources and Hydropower Engineering","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":"Gx Water Resources & Hydropower Engineering","raw_type":null}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure","score":0.5378999710083008}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W2374423650","https://openalex.org/W2392630992","https://openalex.org/W2374318799","https://openalex.org/W2392251372","https://openalex.org/W2380994341","https://openalex.org/W2387175080","https://openalex.org/W4385692827","https://openalex.org/W2377799001","https://openalex.org/W2380798986","https://openalex.org/W2355881316"],"abstract_inverted_index":{"The":[0],"author":[1],"introduced":[2],"the":[3,15,32,35],"specific":[4],"technical":[5],"requirements":[6],"of":[7,34],"high":[8],"side":[9,37],"slope":[10,38],"anchor":[11],"cable":[12],"construction":[13,17,29],"at":[14],"Xiaolangdi.The":[16],"procedure":[18],"mainly":[19],"included":[20],"making":[21],"hole,braiding":[22],"cable,laying":[23],"out":[24],"cable,grouting,drawing,surveying":[25],"and":[26],"sealing":[27],"hole.Its":[28],"quality":[30],"is":[31],"key":[33],"whole":[36],"strengthening":[39],"engineering.":[40]},"counts_by_year":[],"updated_date":"2026-10-31T12:09:11.096373","created_date":"2016-06-24T00:00:00"}
