{"id":"https://openalex.org/W2385647742","doi":null,"title":"Optimal Distribution Method of Voltage Sag Monitoring Device in Smart Grid","display_name":"Optimal Distribution Method of Voltage Sag Monitoring Device in Smart Grid","alternate_titles":[],"publication_year":2011,"publication_date":"2011-01-01","ids":{"openalex":"https://openalex.org/W2385647742","mag":"2385647742"},"language":"zh","primary_location":{"id":"mag:2385647742","doi":null,"is_oa":false,"landing_page_url":"https://oversea.cnki.net/kcms/detail/detail.aspx?dbcode=CJFD&filename=DLJS201106006","pdf_url":null,"source":{"id":"https://openalex.org/S2764794075","display_name":"Electric Power Construction","issn_l":"1000-7229","issn":["1000-7229"],"is_oa":false,"is_in_doaj":true,"is_core":false,"listed_in":["doaj","poland-20","russia-white-list-2"],"host_organization":"https://openalex.org/P4324013422","host_organization_name":"State Power Economic Research Institute","host_organization_lineage":["https://openalex.org/P4324013422"],"host_organization_lineage_names":["State Power Economic Research Institute"],"type":"journal"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":"Electric Power Construction","raw_type":null},"parent_works":[],"lineage":["https://openalex.org/W2385647742"],"child_works_count":0,"pull_notice_works":[],"type":"article","is_traditional":true,"indexed_in":[],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5100611289","display_name":"Bin Chen","type":null,"orcid":"https://orcid.org/0000-0001-8358-1186","observed_orcids":["https://orcid.org/0000-0001-8358-1186"]},"acted_on_behalf_of":[],"institutions":[],"countries":[],"is_corresponding":true,"contributor_roles":[],"raw_author_name":"Bin Chen","raw_affiliation_strings":["Yongzhou Power Supply Bureau,Yongzhou 425900,Hunan Province,China)"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Yongzhou Power Supply Bureau,Yongzhou 425900,Hunan Province,China)","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":["https://openalex.org/A5100611289"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"reviewed_by_count":0,"citation_normalized_percentile":{"value":0.0,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10573","display_name":"Power Quality and Harmonics","score":0.7681000232696533,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10573","display_name":"Power Quality and Harmonics","score":0.7681000232696533,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10305","display_name":"Power System Optimization and Stability","score":0.20360000431537628,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10454","display_name":"Optimal Power Flow Distribution","score":0.01360000018030405,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/smart-grid","display_name":"smart grid","score":0.7039999961853027},{"id":"https://openalex.org/keywords/optimal-placement","display_name":"optimal placement","score":0.515999972820282},{"id":"https://openalex.org/keywords/power-quality-monitoring","display_name":"power quality monitoring","score":0.925000011920929},{"id":"https://openalex.org/keywords/0-1-integer-programming","display_name":"0-1 integer programming","score":0.9559999704360962},{"id":"https://openalex.org/keywords/ieee-30-bus-test-system","display_name":"IEEE 30-bus system","score":0.890999972820282}],"concepts":[{"id":"https://openalex.org/C2781134633","wikidata":"https://www.wikidata.org/wiki/Q14945479","display_name":"Voltage sag","level":4,"score":0.8312363624572754},{"id":"https://openalex.org/C55439883","wikidata":"https://www.wikidata.org/wiki/Q360812","display_name":"Correctness","level":2,"score":0.7337700128555298},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.6082759499549866},{"id":"https://openalex.org/C10558101","wikidata":"https://www.wikidata.org/wiki/Q689855","display_name":"Smart grid","level":2,"score":0.5242795348167419},{"id":"https://openalex.org/C165801399","wikidata":"https://www.wikidata.org/wiki/Q25428","display_name":"Voltage","level":2,"score":0.5234884023666382},{"id":"https://openalex.org/C2779664074","wikidata":"https://www.wikidata.org/wiki/Q3518405","display_name":"Terminal (telecommunication)","level":2,"score":0.4760684370994568},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.4725971817970276},{"id":"https://openalex.org/C56086750","wikidata":"https://www.wikidata.org/wiki/Q6042592","display_name":"Integer programming","level":2,"score":0.4452211856842041},{"id":"https://openalex.org/C24326235","wikidata":"https://www.wikidata.org/wiki/Q126095","display_name":"Electronic engineering","level":1,"score":0.44491755962371826},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.4303467869758606},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.39159610867500305},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.37954503297805786},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.3078944683074951},{"id":"https://openalex.org/C2779665505","wikidata":"https://www.wikidata.org/wiki/Q1780079","display_name":"Power quality","level":3,"score":0.30518829822540283},{"id":"https://openalex.org/C11413529","wikidata":"https://www.wikidata.org/wiki/Q8366","display_name":"Algorithm","level":1,"score":0.13891273736953735},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.12440037727355957},{"id":"https://openalex.org/C76155785","wikidata":"https://www.wikidata.org/wiki/Q418","display_name":"Telecommunications","level":1,"score":0.11153817176818848},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"mag:2385647742","doi":null,"is_oa":false,"landing_page_url":"https://oversea.cnki.net/kcms/detail/detail.aspx?dbcode=CJFD&filename=DLJS201106006","pdf_url":null,"source":{"id":"https://openalex.org/S2764794075","display_name":"Electric Power Construction","issn_l":"1000-7229","issn":["1000-7229"],"is_oa":false,"is_in_doaj":true,"is_core":false,"listed_in":["doaj","poland-20","russia-white-list-2"],"host_organization":"https://openalex.org/P4324013422","host_organization_name":"State Power Economic Research Institute","host_organization_lineage":["https://openalex.org/P4324013422"],"host_organization_lineage_names":["State Power Economic Research Institute"],"type":"journal"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":"Electric Power Construction","raw_type":null}],"best_oa_location":null,"sustainable_development_goals":[{"score":1.0,"display_name":"Industry, innovation and infrastructure","id":"https://metadata.un.org/sdg/9"},{"score":0.75,"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W2351264323","https://openalex.org/W4385627251","https://openalex.org/W2153209902","https://openalex.org/W4299551358","https://openalex.org/W4396766423","https://openalex.org/W2316868116","https://openalex.org/W2941653516","https://openalex.org/W4324118897","https://openalex.org/W2092350417","https://openalex.org/W2140578822"],"abstract_inverted_index":{"In":[0],"the":[1,4,22,36,44,58,68,84,98,107,111],"framework":[2],"of":[3,11,24,35,51,57,61,73,101],"modern":[5],"smart":[6],"grid":[7],"technologies,the":[8],"optimal":[9,59,85,99],"distribution":[10,60,72,100],"voltage":[12,102],"sag":[13,103],"monitoring":[14,27,33,37,48,52,62,74,104],"device":[15,38,63,105],"is":[16,64,80,90,115],"an":[17,93],"important":[18],"research":[19],"field":[20],"in":[21,106],"study":[23],"power":[25],"quality":[26],"terminal.":[28],"The":[29,54],"installation":[30],"location":[31],"and":[32,47,113],"scope":[34],"are":[39],"described":[40],"respectively":[41],"based":[42],"on":[43],"position":[45],"vector":[46],"area":[49],"matrix":[50],"device.":[53],"mathematical":[55],"model":[56],"constructed":[65],"by":[66],"considering":[67],"specific":[69],"requirements":[70],"for":[71],"device,and":[75],"a":[76],"0-1":[77],"integer":[78],"programming":[79],"proposed":[81,88],"corresponding":[82],"to":[83,92,96],"model.":[86],"Finally,the":[87],"method":[89],"applied":[91],"IEEE-30":[94],"network":[95],"determine":[97],"whole":[108],"network,of":[109],"which":[110],"correctness":[112],"validity":[114],"further":[116],"analyzed.":[117]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W2385647742","counts_by_year":[],"updated_date":"2026-11-28T09:27:14.034486","created_date":"2016-06-24T00:00:00"}
