{"id":"https://openalex.org/W2317543160","doi":null,"title":"Building Information Modelling (BIM): A new paradigm for visual interactive modeling and simulation for construction project","display_name":"Building Information Modelling (BIM): A new paradigm for visual interactive modeling and simulation for construction project","publication_year":2008,"publication_date":"2008-01-01","ids":{"openalex":"https://openalex.org/W2317543160","mag":"2317543160"},"language":"en","primary_location":{"id":"mag:2317543160","doi":null,"is_oa":false,"landing_page_url":"http://www.neduet.edu.pk/Civil/ICCIDC-I/Conference%20Proceedings/Papers/045.pdf","pdf_url":null,"source":null,"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":null},"parent_works":[],"lineage":["https://openalex.org/W2317543160"],"child_works_count":0,"type":"article","is_traditional":true,"indexed_in":[],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5111514826","display_name":"H.Y. Leung","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"H.Y. Leung","raw_affiliation_strings":["Department of Civil Engineering"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Department of Civil Engineering","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":["https://openalex.org/A5111514826"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":11.8243,"has_fulltext":false,"cited_by_count":167,"citation_normalized_percentile":{"value":0.97542148,"is_in_top_1_percent":false,"is_in_top_10_percent":true},"cited_by_percentile_year":{"min":97,"max":100},"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11006","display_name":"BIM and Construction Integration","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11006","display_name":"BIM and Construction Integration","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12698","display_name":"3D Modeling in Geospatial Applications","score":0.0,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13518","display_name":"Architecture and Computational Design","score":0.0,"subfield":{"id":"https://openalex.org/subfields/2216","display_name":"Architecture"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/building-information-modeling","display_name":"building information modeling","score":0.9750000238418579},{"id":"https://openalex.org/keywords/aec-industry","display_name":"AEC industry","score":0.8059999942779541},{"id":"https://openalex.org/keywords/construction-project-management","display_name":"construction project management","score":0.8190000057220459},{"id":"https://openalex.org/keywords/stakeholder-integration","display_name":"stakeholder integration","score":0.6859999895095825},{"id":"https://openalex.org/keywords/design-simulation","display_name":"design simulation","score":0.4620000123977661},{"id":"https://openalex.org/keywords/construction-planning","display_name":"construction planning","score":0.414000004529953},{"id":"https://openalex.org/keywords/project-cost-reduction","display_name":"project cost reduction","score":0.7850000262260437},{"id":"https://openalex.org/keywords/bim-adoption-barriers","display_name":"BIM adoption barriers","score":0.5080000162124634}],"concepts":[{"id":"https://openalex.org/C66862320","wikidata":"https://www.wikidata.org/wiki/Q842017","display_name":"Building information modeling","level":3,"score":0.938352108001709},{"id":"https://openalex.org/C153517457","wikidata":"https://www.wikidata.org/wiki/Q4041443","display_name":"Integrated project delivery","level":3,"score":0.6578572392463684},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.5275837182998657},{"id":"https://openalex.org/C107053488","wikidata":"https://www.wikidata.org/wiki/Q2674423","display_name":"Construction engineering","level":1,"score":0.5035392642021179},{"id":"https://openalex.org/C123657996","wikidata":"https://www.wikidata.org/wiki/Q12271","display_name":"Architecture","level":2,"score":0.48873186111450195},{"id":"https://openalex.org/C201995342","wikidata":"https://www.wikidata.org/wiki/Q682496","display_name":"Systems engineering","level":1,"score":0.476018488407135},{"id":"https://openalex.org/C117110933","wikidata":"https://www.wikidata.org/wiki/Q811501","display_name":"Construction management","level":2,"score":0.4533807337284088},{"id":"https://openalex.org/C190831278","wikidata":"https://www.wikidata.org/wiki/Q323611","display_name":"Building design","level":2,"score":0.4355957508087158},{"id":"https://openalex.org/C110354214","wikidata":"https://www.wikidata.org/wiki/Q6314146","display_name":"Engineering management","level":1,"score":0.4026593267917633},{"id":"https://openalex.org/C170154142","wikidata":"https://www.wikidata.org/wiki/Q150737","display_name":"Architectural engineering","level":1,"score":0.3922322392463684},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.36816632747650146},{"id":"https://openalex.org/C15952604","wikidata":"https://www.wikidata.org/wiki/Q179012","display_name":"Project management","level":2,"score":0.33455806970596313},{"id":"https://openalex.org/C112930515","wikidata":"https://www.wikidata.org/wiki/Q4389547","display_name":"Risk analysis (engineering)","level":1,"score":0.3248971104621887},{"id":"https://openalex.org/C147176958","wikidata":"https://www.wikidata.org/wiki/Q77590","display_name":"Civil engineering","level":1,"score":0.16387632489204407},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.15294203162193298},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.1450105607509613},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.0},{"id":"https://openalex.org/C153349607","wikidata":"https://www.wikidata.org/wiki/Q36649","display_name":"Visual arts","level":1,"score":0.0},{"id":"https://openalex.org/C142362112","wikidata":"https://www.wikidata.org/wiki/Q735","display_name":"Art","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"mag:2317543160","doi":null,"is_oa":false,"landing_page_url":"http://www.neduet.edu.pk/Civil/ICCIDC-I/Conference%20Proceedings/Papers/045.pdf","pdf_url":null,"source":null,"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":null}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","score":0.5378999710083008,"display_name":"Industry, innovation and infrastructure"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":3,"referenced_works":["https://openalex.org/W1721257846","https://openalex.org/W2319970186","https://openalex.org/W3217650607"],"related_works":["https://openalex.org/W4232612682","https://openalex.org/W2121434806","https://openalex.org/W2128978665","https://openalex.org/W2381690210","https://openalex.org/W7096767264","https://openalex.org/W2740197905","https://openalex.org/W2582227712","https://openalex.org/W6930767142","https://openalex.org/W2403845411","https://openalex.org/W2565384936"],"abstract_inverted_index":{"The":[0],"Architecture,":[1],"Engineering":[2],"and":[3,17,19,39,52,61,73,158,182],"Construction":[4],"(AEC)":[5],"industries":[6,141],"have":[7],"long":[8],"sought":[9],"techniques":[10],"to":[11,31,46,63,67,74,106],"decrease":[12],"project":[13,21],"cost,":[14],"increase":[15],"productivity":[16],"quality,":[18],"reduce":[20],"delivery":[22],"time.":[23],"Building":[24,134],"Information":[25,135],"Modeling":[26,136],"(BIM)":[27,137],"offers":[28],"the":[29,37,48,94,104,122,131,139,145,155,172,186],"potential":[30,76,105],"achieve":[32],"these":[33],"objectives.":[34],"BIM":[35,82,167,179],"represents":[36,83],"development":[38],"use":[40],"of":[41,54,93,96,133,147],"computer-generated":[42],"n-dimensional":[43],"(n-D)":[44],"models":[45],"simulate":[47],"planning,":[49],"design,":[50,77],"construction":[51,78],"operation":[53],"a":[55,84,100],"facility.":[56],"It":[57,102],"helps":[58],"architects,":[59],"engineers":[60],"constructors":[62],"visualize":[64],"what":[65],"is":[66,175],"be":[68],"built":[69],"in":[70,121,168],"simulated":[71],"environment":[72],"identify":[75],"or":[79],"operational":[80],"issues.":[81],"new":[85],"paradigm":[86],"within":[87],"AEC,":[88],"one":[89],"that":[90],"encourages":[91],"integration":[92],"roles":[95],"all":[97,118,163],"stakeholders":[98,164],"on":[99,177],"project.":[101],"has":[103],"bring":[107],"about":[108],"great":[109],"efficiency":[110],"as":[111,113,126],"well":[112],"harmony":[114],"among":[115],"players":[116],"who":[117],"too":[119],"often":[120],"past":[123],"saw":[124],"themselves":[125],"adversaries.":[127],"In":[128],"this":[129],"paper,":[130],"benefits":[132,160],"for":[138,185],"AEC":[140,187],"are":[142],"discussed":[143],"with":[144],"help":[146],"two":[148],"case":[149,152],"studies.":[150],"These":[151],"studies":[153],"illustrate":[154],"various":[156,178],"tangible":[157],"intangible":[159],"achieved":[161],"by":[162,165],"implementing":[166],"their":[169],"projects.":[170],"At":[171],"end,":[173],"light":[174],"thrown":[176],"related":[180],"risks":[181],"future":[183],"challenges":[184],"industries.":[188]},"counts_by_year":[{"year":2021,"cited_by_count":14},{"year":2020,"cited_by_count":19},{"year":2019,"cited_by_count":12},{"year":2018,"cited_by_count":19},{"year":2017,"cited_by_count":14},{"year":2016,"cited_by_count":15},{"year":2015,"cited_by_count":20},{"year":2014,"cited_by_count":19},{"year":2013,"cited_by_count":20},{"year":2012,"cited_by_count":5}],"updated_date":"2026-10-12T09:40:04.860316","created_date":"2016-06-24T00:00:00"}
