{"id":"https://openalex.org/W2028217694","doi":"https://doi.org/10.2307/3003198","title":"Peak Load Pricing in the Electric Utility Industry","display_name":"Peak Load Pricing in the Electric Utility Industry","alternate_titles":[],"publication_year":1976,"publication_date":"1976-01-01","ids":{"openalex":"https://openalex.org/W2028217694","doi":"https://doi.org/10.2307/3003198","mag":"2028217694"},"language":"en","primary_location":{"id":"doi:10.2307/3003198","doi":"https://doi.org/10.2307/3003198","is_oa":false,"landing_page_url":"https://doi.org/10.2307/3003198","pdf_url":null,"source":{"id":"https://openalex.org/S2596855755","display_name":"The Bell Journal of Economics","issn_l":"0361-915X","issn":["0361-915X","2326-3032"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"The Bell Journal of Economics","raw_type":"journal-article"},"parent_works":[],"lineage":["https://openalex.org/W2028217694"],"child_works_count":0,"pull_notice_works":[],"type":"article","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5111447459","display_name":"John T. Wenders","type":null,"orcid":null,"observed_orcids":[]},"acted_on_behalf_of":[],"institutions":[],"countries":[],"is_corresponding":true,"contributor_roles":[],"raw_author_name":"John T. Wenders","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":["https://openalex.org/A5111447459"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":13.4825,"has_fulltext":false,"cited_by_count":150,"reviewed_by_count":0,"citation_normalized_percentile":{"value":0.99197841,"is_in_top_1_percent":true,"is_in_top_10_percent":true},"cited_by_percentile_year":{"min":86,"max":98},"biblio":{"volume":"7","issue":"1","first_page":"232","last_page":"232"},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9961000084877014,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9961000084877014,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11043","display_name":"Merger and Competition Analysis","score":0.00139999995008111,"subfield":{"id":"https://openalex.org/subfields/2002","display_name":"Economics and Econometrics"},"field":{"id":"https://openalex.org/fields/20","display_name":"Economics, Econometrics and Finance"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T12271","display_name":"Renewable energy and sustainable power systems","score":0.0008999999845400453,"subfield":{"id":"https://openalex.org/subfields/2105","display_name":"Renewable Energy, Sustainability and the Environment"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/peak-load-pricing","display_name":"peak-load pricing","score":0.8870000243186951},{"id":"https://openalex.org/keywords/electricity-sector","display_name":"electric utilities","score":0.9020000100135803},{"id":"https://openalex.org/keywords/marginal-cost-pricing","display_name":"marginal cost pricing","score":0.7059999704360962},{"id":"https://openalex.org/keywords/capacity-costs","display_name":"capacity costs","score":0.5759999752044678},{"id":"https://openalex.org/keywords/baseload-power","display_name":"baseload power","score":0.8420000076293945},{"id":"https://openalex.org/keywords/regulated-utilities","display_name":"regulated utilities","score":0.6830000281333923},{"id":"https://openalex.org/keywords/electricity-pricing","display_name":"electricity pricing","score":0.3240000009536743}],"concepts":[{"id":"https://openalex.org/C2777819126","wikidata":"https://www.wikidata.org/wiki/Q1326624","display_name":"Electric utility","level":2,"score":0.740695595741272},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.6677591800689697},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.4612416625022888},{"id":"https://openalex.org/C2986689482","wikidata":"https://www.wikidata.org/wiki/Q1806775","display_name":"Peak load","level":2,"score":0.4199271500110626},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.18018004298210144},{"id":"https://openalex.org/C171146098","wikidata":"https://www.wikidata.org/wiki/Q124192","display_name":"Automotive engineering","level":1,"score":0.14015960693359375},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.10276013612747192}],"mesh":[],"locations_count":2,"locations":[{"id":"doi:10.2307/3003198","doi":"https://doi.org/10.2307/3003198","is_oa":false,"landing_page_url":"https://doi.org/10.2307/3003198","pdf_url":null,"source":{"id":"https://openalex.org/S2596855755","display_name":"The Bell Journal of Economics","issn_l":"0361-915X","issn":["0361-915X","2326-3032"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"The Bell Journal of Economics","raw_type":"journal-article"},{"id":"pmh:oai:RePEc:rje:bellje:v:7:y:1976:i:spring:p:232-241","doi":null,"is_oa":false,"landing_page_url":"http://links.jstor.org/sici?sici=0361-915X%28197621%297%3A1%3C232%3APLPITE%3E2.0.CO%3B2-W&origin=repec","pdf_url":null,"source":{"id":"https://openalex.org/S4306401271","display_name":"RePEc: Research Papers in Economics","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/I77793887","host_organization_name":"Federal Reserve Bank of St. Louis","host_organization_lineage":["https://openalex.org/I77793887"],"host_organization_lineage_names":[],"type":"repository"},"license":null,"license_id":null,"version":"submittedVersion","is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":"article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7","score":0.8485000133514404},{"display_name":"Industry, innovation and infrastructure","id":"https://metadata.un.org/sdg/9","score":0.4943999946117401}],"study_designs":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":1,"referenced_works":["https://openalex.org/W1506545864"],"related_works":["https://openalex.org/W2117315528","https://openalex.org/W2136813070","https://openalex.org/W2027911102","https://openalex.org/W2274495483","https://openalex.org/W2244528570","https://openalex.org/W1985785931","https://openalex.org/W2030357951","https://openalex.org/W423063905","https://openalex.org/W2171826994","https://openalex.org/W614247411"],"abstract_inverted_index":{"In":[0,22],"the":[1,25,32,55,78],"electric":[2,10,59],"utility":[3,60],"industry":[4],"cost":[5,43,67,73],"minimization":[6],"requires":[7],"that":[8,40,54],"heterogeneous":[9,36],"generation":[11],"technologies":[12],"be":[13],"used":[14],"to":[15,24,76],"produce":[16],"electricity":[17],"demands":[18],"of":[19,27,34,80],"different":[20],"durations.":[21],"contrast":[23],"conclusions":[26],"traditional":[28],"peak-load":[29],"pricing":[30],"theory,":[31],"existence":[33],"a":[35],"capital":[37],"stock":[38],"means":[39],"off-peak":[41,69],"marginal":[42,50,66,72],"prices":[44],"almost":[45],"always":[46],"should":[47],"include":[48],"some":[49],"capacity":[51],"costs,":[52],"and":[53,68],"profit":[56],"maximizing":[57],"regulated":[58],"may":[61],"set":[62],"peak":[63],"price":[64,70],"above":[65],"below":[71],"in":[74],"order":[75],"encourage":[77],"expansion":[79],"capital-intensive":[81],"base":[82],"load":[83],"generating":[84],"capacity.":[85]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W2028217694","counts_by_year":[{"year":2026,"cited_by_count":1},{"year":2024,"cited_by_count":3},{"year":2023,"cited_by_count":3},{"year":2022,"cited_by_count":3},{"year":2021,"cited_by_count":3},{"year":2020,"cited_by_count":1},{"year":2019,"cited_by_count":4},{"year":2018,"cited_by_count":4},{"year":2017,"cited_by_count":3},{"year":2016,"cited_by_count":2},{"year":2015,"cited_by_count":4},{"year":2014,"cited_by_count":2},{"year":2013,"cited_by_count":1},{"year":2012,"cited_by_count":6}],"updated_date":"2026-11-21T10:27:49.728292","created_date":"2016-06-24T00:00:00"}
