{"id":"https://openalex.org/W2014496231","doi":"https://doi.org/10.1061/40744(154)192","title":"Ground Improvement for the Route 21 Viaduct Project","display_name":"Ground Improvement for the Route 21 Viaduct Project","alternate_titles":[],"publication_year":2004,"publication_date":"2004-07-21","ids":{"openalex":"https://openalex.org/W2014496231","doi":"https://doi.org/10.1061/40744(154)192","mag":"2014496231"},"language":"en","primary_location":{"id":"doi:10.1061/40744(154)192","doi":"https://doi.org/10.1061/40744(154)192","is_oa":false,"landing_page_url":"https://doi.org/10.1061/40744(154)192","pdf_url":null,"source":{"id":"https://openalex.org/S7407096270","display_name":"Geotechnical Engineering for Transportation Projects (GeoTrans)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310315747","host_organization_name":"American Society of Civil Engineers","host_organization_lineage":["https://openalex.org/P4310315747"],"host_organization_lineage_names":["American Society of Civil Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Geotechnical Engineering for Transportation Projects","raw_type":"proceedings-article"},"parent_works":[],"lineage":["https://openalex.org/W2014496231"],"child_works_count":0,"type":"conference-paper","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5083246326","display_name":"Frank Pepe","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I1306324498","display_name":"Parsons Brinckerhoff","ror":"https://ror.org/00cyfck94","country_code":"US","type":"company","lineage":["https://openalex.org/I1306324498"]}],"countries":["US"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Frank Pepe","raw_affiliation_strings":["Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plazas, New York, NY 10119","Lead Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., 506 Carnegie Center Blvd., Princeton, NJ 08540","Principal Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plaza, New York, NY 10119"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plazas, New York, NY 10119","institution_ids":["https://openalex.org/I1306324498"]},{"raw_affiliation_string":"Lead Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., 506 Carnegie Center Blvd., Princeton, NJ 08540","institution_ids":["https://openalex.org/I1306324498"]},{"raw_affiliation_string":"Principal Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plaza, New York, NY 10119","institution_ids":["https://openalex.org/I1306324498"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5046347013","display_name":"Kwang Ro","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I1306324498","display_name":"Parsons Brinckerhoff","ror":"https://ror.org/00cyfck94","country_code":"US","type":"company","lineage":["https://openalex.org/I1306324498"]}],"countries":["US"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Kwang Ro","raw_affiliation_strings":["Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plazas, New York, NY 10119","Lead Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., 506 Carnegie Center Blvd., Princeton, NJ 08540","Principal Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plaza, New York, NY 10119"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plazas, New York, NY 10119","institution_ids":["https://openalex.org/I1306324498"]},{"raw_affiliation_string":"Lead Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., 506 Carnegie Center Blvd., Princeton, NJ 08540","institution_ids":["https://openalex.org/I1306324498"]},{"raw_affiliation_string":"Principal Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plaza, New York, NY 10119","institution_ids":["https://openalex.org/I1306324498"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5111384394","display_name":"Ragui F. Wilson-Fahmy","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I1306324498","display_name":"Parsons Brinckerhoff","ror":"https://ror.org/00cyfck94","country_code":"US","type":"company","lineage":["https://openalex.org/I1306324498"]}],"countries":["US"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"Ragui Wilson-Fahmy","raw_affiliation_strings":["Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plazas, New York, NY 10119","Lead Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., 506 Carnegie Center Blvd., Princeton, NJ 08540","Principal Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plaza, New York, NY 10119"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plazas, New York, NY 10119","institution_ids":["https://openalex.org/I1306324498"]},{"raw_affiliation_string":"Lead Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., 506 Carnegie Center Blvd., Princeton, NJ 08540","institution_ids":["https://openalex.org/I1306324498"]},{"raw_affiliation_string":"Principal Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plaza, New York, NY 10119","institution_ids":["https://openalex.org/I1306324498"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5054566825","display_name":"William M. Bergeson","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I1306324498","display_name":"Parsons Brinckerhoff","ror":"https://ror.org/00cyfck94","country_code":"US","type":"company","lineage":["https://openalex.org/I1306324498"]}],"countries":["US"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"William Bergeson","raw_affiliation_strings":["Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plazas, New York, NY 10119","Lead Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., 506 Carnegie Center Blvd., Princeton, NJ 08540","Principal Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plaza, New York, NY 10119"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plazas, New York, NY 10119","institution_ids":["https://openalex.org/I1306324498"]},{"raw_affiliation_string":"Lead Geotechnical Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., 506 Carnegie Center Blvd., Princeton, NJ 08540","institution_ids":["https://openalex.org/I1306324498"]},{"raw_affiliation_string":"Principal Engineer, Parsons Brinckerhoff Quade & Douglas, Inc., One Penn Plaza, New York, NY 10119","institution_ids":["https://openalex.org/I1306324498"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I1306324498"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"reviewed_by_count":0,"citation_normalized_percentile":{"value":0.0,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"1971","last_page":"1980"},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11375","display_name":"Geotechnical Engineering and Soil Stabilization","score":0.9945999979972839,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11375","display_name":"Geotechnical Engineering and Soil Stabilization","score":0.9945999979972839,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10233","display_name":"Geotechnical Engineering and Soil Mechanics","score":0.0034000000450760126,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13236","display_name":"Geotechnical and construction materials studies","score":0.0010999999940395355,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/soil-improvement","display_name":"soil improvement","score":0.9810000061988831},{"id":"https://openalex.org/keywords/interchange-construction","display_name":"interchange construction","score":0.5040000081062317},{"id":"https://openalex.org/keywords/peat","display_name":"peat","score":0.9520000219345093},{"id":"https://openalex.org/keywords/compressible-soils","display_name":"compressible soils","score":0.7799999713897705},{"id":"https://openalex.org/keywords/preloading","display_name":"preloading","score":0.8560000061988831},{"id":"https://openalex.org/keywords/post-construction-settlement","display_name":"post-construction settlement","score":0.8230000138282776},{"id":"https://openalex.org/keywords/embankment-stability","display_name":"embankment stability","score":0.9909999966621399},{"id":"https://openalex.org/keywords/retaining-structures","display_name":"retaining structures","score":0.9879999756813049},{"id":"https://openalex.org/keywords/geotechnical-instrumentation","display_name":"geotechnical instrumentation","score":0.9459999799728394},{"id":"https://openalex.org/keywords/fill-placement","display_name":"fill placement","score":0.6850000023841858},{"id":"https://openalex.org/keywords/traffic-maintenance-during-construction","display_name":"traffic maintenance during construction","score":0.652999997138977},{"id":"https://openalex.org/keywords/structural-rehabilitation","display_name":"structural rehabilitation","score":0.31700000166893005}],"concepts":[{"id":"https://openalex.org/C147176958","wikidata":"https://www.wikidata.org/wiki/Q77590","display_name":"Civil engineering","level":1,"score":0.6015318632125854},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.5928763151168823},{"id":"https://openalex.org/C161222754","wikidata":"https://www.wikidata.org/wiki/Q270699","display_name":"Silt","level":2,"score":0.5267992615699768},{"id":"https://openalex.org/C187320778","wikidata":"https://www.wikidata.org/wiki/Q1349130","display_name":"Geotechnical engineering","level":1,"score":0.4041617810726166},{"id":"https://openalex.org/C127313418","wikidata":"https://www.wikidata.org/wiki/Q1069","display_name":"Geology","level":0,"score":0.13444295525550842},{"id":"https://openalex.org/C151730666","wikidata":"https://www.wikidata.org/wiki/Q7205","display_name":"Paleontology","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1061/40744(154)192","doi":"https://doi.org/10.1061/40744(154)192","is_oa":false,"landing_page_url":"https://doi.org/10.1061/40744(154)192","pdf_url":null,"source":{"id":"https://openalex.org/S7407096270","display_name":"Geotechnical Engineering for Transportation Projects (GeoTrans)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310315747","host_organization_name":"American Society of Civil Engineers","host_organization_lineage":["https://openalex.org/P4310315747"],"host_organization_lineage_names":["American Society of Civil Engineers"],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Geotechnical Engineering for Transportation Projects","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure","score":0.8970999717712402},{"id":"https://metadata.un.org/sdg/11","display_name":"Sustainable cities and communities","score":0.7250000238418579}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W4403738170","https://openalex.org/W2805225256","https://openalex.org/W2072327916","https://openalex.org/W2003493953","https://openalex.org/W2741894306","https://openalex.org/W1483918865","https://openalex.org/W2625857477","https://openalex.org/W4404387335","https://openalex.org/W7135031981","https://openalex.org/W6922651573"],"abstract_inverted_index":{"Geotechnical":[0],"aspects":[1,148,176],"were":[2,23],"critical":[3],"elements":[4],"of":[5,70,76,85,116,138,149,156,172,177],"the":[6,10,40,43,49,57,64,83,86,96,101,114,117,136,139,145,150,154,157,164,169,173,178,188],"successful":[7,170],"construction":[8,58,84,110,181],"for":[9,95],"Route":[11,45],"21":[12,46],"Viaduct":[13,47],"in":[14,187],"Newark,":[15],"New":[16],"Jersey.":[17],"The":[18,32,123],"original":[19],"viaduct":[20],"and":[21,26,29,38,48,72,80,112,120,134,152,182],"interchange":[22,51],"structurally":[24],"deficient":[25],"functionally":[27],"obsolete":[28],"needed":[30,106],"replacement.":[31],"project":[33,151],"objective":[34],"was":[35,93,105],"to":[36,42,99,107,130],"design":[37],"construct":[39],"replacement":[41],"existing":[44],"adjacent":[50],"while":[52],"maintaining":[53],"traffic":[54],"flow":[55],"throughout":[56],"period.":[59],"Difficult":[60],"subsurface":[61],"conditions":[62],"at":[63],"site":[65],"that":[66,167],"included":[67,126],"a":[68],"layer":[69,75],"weak":[71],"highly":[73],"compressible":[74],"soft":[77,97],"organic":[78],"silt":[79],"peat":[81],"complicated":[82],"project.":[87,179],"A":[88],"significant":[89],"ground":[90,140,146,158],"improvement":[91,104,147,159],"program":[92,125],"required":[94],"soils":[98],"permit":[100],"construction.":[102],"Ground":[103],"reduce":[108],"post":[109],"settlements":[111],"increase":[113],"stability":[115],"new":[118],"embankments":[119],"retaining":[121],"structures.":[122],"preloading":[124],"extensive":[127],"geotechnical":[128,175],"instrumentation":[129],"control":[131],"fill":[132],"placement":[133],"evaluate":[135],"performance":[137],"improvement.":[141],"This":[142],"paper":[143],"discusses":[144],"presents":[153],"findings":[155],"program.":[160],"It":[161],"also":[162],"highlights":[163],"key":[165],"issues":[166,184],"affect":[168],"implementation":[171],"different":[174],"Design,":[180],"economic":[183],"are":[185],"discussed":[186],"paper.":[189]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W2014496231","counts_by_year":[],"updated_date":"2026-11-10T11:39:43.021295","created_date":"2016-06-24T00:00:00"}
