{"id":"https://openalex.org/W1980590128","doi":"https://doi.org/10.1109/mpe.2009.934264","title":"The view from the top","display_name":"The view from the top","alternate_titles":[],"publication_year":2009,"publication_date":"2009-11-01","ids":{"openalex":"https://openalex.org/W1980590128","doi":"https://doi.org/10.1109/mpe.2009.934264","mag":"1980590128"},"language":"en","primary_location":{"id":"doi:10.1109/mpe.2009.934264","doi":"https://doi.org/10.1109/mpe.2009.934264","is_oa":false,"landing_page_url":"https://doi.org/10.1109/mpe.2009.934264","pdf_url":null,"source":{"id":"https://openalex.org/S205083296","display_name":"IEEE Power and Energy Magazine","issn_l":"1540-7977","issn":["1540-7977","1558-4216"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":["dongbi-b","jufo-2","norway-1","poland-100","russia-white-list-1"],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"IEEE Power and Energy Magazine","raw_type":"journal-article"},"parent_works":[],"lineage":["https://openalex.org/W1980590128"],"child_works_count":0,"type":"article","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5064308945","display_name":"John Lawhorn","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"John Lawhorn","raw_affiliation_strings":["Midwest ISO, St. Paul, Minnesota, USA","[Midwest ISO, St. Paul, MN, USA]"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Midwest ISO, St. Paul, Minnesota, USA","institution_ids":[]},{"raw_affiliation_string":"[Midwest ISO, St. Paul, MN, USA]","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5040551967","display_name":"Dale Osborn","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Dale Osborn","raw_affiliation_strings":["Midwest ISO, St. Paul, Minnesota, USA","[Midwest ISO, St. Paul, MN, USA]"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Midwest ISO, St. Paul, Minnesota, USA","institution_ids":[]},{"raw_affiliation_string":"[Midwest ISO, St. Paul, MN, USA]","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5110698334","display_name":"Jay Caspary","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Jay Caspary","raw_affiliation_strings":["Southwest Power Pool, Little Rock, Arkansas, USA","Southwest Power Pool, Little Rock, AR, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Southwest Power Pool, Little Rock, Arkansas, USA","institution_ids":[]},{"raw_affiliation_string":"Southwest Power Pool, Little Rock, AR, USA","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5079215226","display_name":"Bradley Nickell","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Bradley Nickell","raw_affiliation_strings":["Western Electricity Coordinating Council, Salt Lake City, Utah, USA","Western Electr. Coordinating Council, Salt Lake City, UT, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Western Electricity Coordinating Council, Salt Lake City, Utah, USA","institution_ids":[]},{"raw_affiliation_string":"Western Electr. Coordinating Council, Salt Lake City, UT, USA","institution_ids":[]}]},{"author_position":"middle","author":{"id":null,"display_name":"Doug Larson","orcid":null,"observed_orcids":[]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Doug Larson","raw_affiliation_strings":["Western Interstate Energy Board, Denver, Colorado, USA","Western Interstate Energy Board, Salt Lake City, UT, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Western Interstate Energy Board, Denver, Colorado, USA","institution_ids":[]},{"raw_affiliation_string":"Western Interstate Energy Board, Salt Lake City, UT, USA","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5023375514","display_name":"Warren Lasher","orcid":"https://orcid.org/0009-0005-6948-5450","observed_orcids":["https://orcid.org/0009-0005-6948-5450"]},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Warren Lasher","raw_affiliation_strings":["ERCOT, Taylor, Texas, USA","ER-COT, Taylor, TX, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"ERCOT, Taylor, Texas, USA","institution_ids":[]},{"raw_affiliation_string":"ER-COT, Taylor, TX, USA","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5100832347","display_name":"Manzar Rahman","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4401726924","display_name":"American Electric Power (United States)","ror":"https://ror.org/040asb018","country_code":"US","type":"company","lineage":["https://openalex.org/I4401726924"]}],"countries":["US"],"is_corresponding":false,"raw_author_name":"Manzar Rahman","raw_affiliation_strings":["American Electric Power, Columbus, Ohio","American Electr. Power, Columbus, OH, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"American Electric Power, Columbus, Ohio","institution_ids":["https://openalex.org/I4401726924"]},{"raw_affiliation_string":"American Electr. Power, Columbus, OH, USA","institution_ids":["https://openalex.org/I4401726924"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":5.8453,"has_fulltext":false,"cited_by_count":42,"citation_normalized_percentile":{"value":0.96239732,"is_in_top_1_percent":false,"is_in_top_10_percent":true},"cited_by_percentile_year":{"min":86,"max":99},"biblio":{"volume":"7","issue":"6","first_page":"76","last_page":"88"},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9643999934196472,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9643999934196472,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11941","display_name":"Power System Reliability and Maintenance","score":0.029200000688433647,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.002099999925121665,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/transmission-planning","display_name":"transmission planning","score":0.9890000224113464},{"id":"https://openalex.org/keywords/renewable-energy-integration","display_name":"renewable energy integration","score":0.9259999990463257},{"id":"https://openalex.org/keywords/value-based-planning","display_name":"value-based planning","score":0.8859999775886536},{"id":"https://openalex.org/keywords/regional-transmission-organizations","display_name":"regional transmission organizations","score":0.7429999709129333},{"id":"https://openalex.org/keywords/investor-owned-utilities","display_name":"investor-owned utilities","score":0.9610000252723694},{"id":"https://openalex.org/keywords/transmission-reliability","display_name":"transmission reliability","score":0.5249999761581421}],"concepts":[{"id":"https://openalex.org/C43214815","wikidata":"https://www.wikidata.org/wiki/Q7310987","display_name":"Reliability (semiconductor)","level":3,"score":0.6307817697525024},{"id":"https://openalex.org/C761482","wikidata":"https://www.wikidata.org/wiki/Q118093","display_name":"Transmission (telecommunications)","level":2,"score":0.5445927977561951},{"id":"https://openalex.org/C2781007418","wikidata":"https://www.wikidata.org/wiki/Q1456934","display_name":"Capacity planning","level":2,"score":0.5244269967079163},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.4894613027572632},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.4857671558856964},{"id":"https://openalex.org/C140311924","wikidata":"https://www.wikidata.org/wiki/Q200928","display_name":"Electric power transmission","level":2,"score":0.4711906909942627},{"id":"https://openalex.org/C98045186","wikidata":"https://www.wikidata.org/wiki/Q205663","display_name":"Process (computing)","level":2,"score":0.46375301480293274},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.45076996088027954},{"id":"https://openalex.org/C2778834244","wikidata":"https://www.wikidata.org/wiki/Q5377181","display_name":"Energy planning","level":3,"score":0.4342459738254547},{"id":"https://openalex.org/C123745756","wikidata":"https://www.wikidata.org/wiki/Q1665949","display_name":"Interconnection","level":2,"score":0.4238806664943695},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.42210423946380615},{"id":"https://openalex.org/C76155785","wikidata":"https://www.wikidata.org/wiki/Q418","display_name":"Telecommunications","level":1,"score":0.3205971121788025},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.2653580904006958},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.249271959066391},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.13864466547966003},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.11339631676673889},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/mpe.2009.934264","doi":"https://doi.org/10.1109/mpe.2009.934264","is_oa":false,"landing_page_url":"https://doi.org/10.1109/mpe.2009.934264","pdf_url":null,"source":{"id":"https://openalex.org/S205083296","display_name":"IEEE Power and Energy Magazine","issn_l":"1540-7977","issn":["1540-7977","1558-4216"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":["dongbi-b","jufo-2","norway-1","poland-100","russia-white-list-1"],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"IEEE Power and Energy Magazine","raw_type":"journal-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":1.0,"display_name":"Industry, innovation and infrastructure","id":"https://metadata.un.org/sdg/9"},{"score":0.75,"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":1,"referenced_works":["https://openalex.org/W4231164545"],"related_works":["https://openalex.org/W2127729571","https://openalex.org/W2084433517","https://openalex.org/W1982813545","https://openalex.org/W1544487607","https://openalex.org/W1665695681","https://openalex.org/W6944072947","https://openalex.org/W2126456454","https://openalex.org/W2094624982","https://openalex.org/W4387005383","https://openalex.org/W2888564140"],"abstract_inverted_index":{"The":[0],"challenge":[1],"of":[2,6,25,49],"integrating":[3],"large":[4],"amounts":[5],"renewable":[7],"energy":[8],"resources":[9],"into":[10],"the":[11,23,35,45,65,73,82],"electric":[12],"sector":[13],"requires":[14],"updated":[15],"transmission":[16,46,57,75],"analysis":[17],"techniques.":[18],"Economic":[19],"planning,":[20],"primarily":[21],"in":[22],"form":[24],"value-based":[26],"planning":[27,47,76],"over":[28],"interconnection-wide":[29],"areas,":[30],"is":[31],"needed":[32],"before":[33],"performing":[34],"traditional":[36,74],"single-hour,":[37],"capacity-based":[38],"reliability":[39],"analyses.":[40],"This":[41],"article":[42],"looks":[43],"at":[44],"processes":[48],"leading":[50],"organizations":[51,58],"from":[52],"various":[53],"sectors":[54],"-":[55],"regional":[56,63],"(RTOs),":[59],"investor-owned":[60],"utilities,":[61],"and":[62],"organizations-within":[64],"United":[66],"States":[67],"to":[68,72,80],"illustrate":[69],"what":[70],"changes":[71],"process":[77],"are":[78],"required":[79],"meet":[81],"present":[83],"challenges.":[84]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W1980590128","counts_by_year":[{"year":2023,"cited_by_count":1},{"year":2022,"cited_by_count":1},{"year":2021,"cited_by_count":1},{"year":2020,"cited_by_count":1},{"year":2016,"cited_by_count":2},{"year":2015,"cited_by_count":1},{"year":2014,"cited_by_count":2},{"year":2013,"cited_by_count":3},{"year":2012,"cited_by_count":9}],"updated_date":"2026-11-19T14:11:59.513116","created_date":"2016-06-24T00:00:00"}
