{"id":"https://openalex.org/W1965712486","doi":"https://doi.org/10.1109/tpas.1965.4766109","title":"An Approach to the Analysis of Generating-Capacity Reserve Requirements","display_name":"An Approach to the Analysis of Generating-Capacity Reserve Requirements","alternate_titles":[],"publication_year":1965,"publication_date":"1965-01-01","ids":{"openalex":"https://openalex.org/W1965712486","doi":"https://doi.org/10.1109/tpas.1965.4766109","mag":"1965712486"},"language":"en","primary_location":{"id":"doi:10.1109/tpas.1965.4766109","doi":"https://doi.org/10.1109/tpas.1965.4766109","is_oa":false,"landing_page_url":"https://doi.org/10.1109/tpas.1965.4766109","pdf_url":null,"source":{"id":"https://openalex.org/S35391503","display_name":"IEEE Transactions on Power Apparatus and Systems","issn_l":"0018-9510","issn":["0018-9510"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"IEEE Transactions on Power Apparatus and Systems","raw_type":"journal-article"},"parent_works":[],"lineage":["https://openalex.org/W1965712486"],"child_works_count":0,"type":"article","is_traditional":true,"indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5002626972","display_name":"Gregory Vassell","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4401726924","display_name":"American Electric Power (United States)","ror":"https://ror.org/040asb018","country_code":"US","type":"company","lineage":["https://openalex.org/I4401726924"]}],"countries":["US"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"G. S. Vassell","raw_affiliation_strings":["American Electric Power Service Corporation, New York, NY, USA","[American Electric Power Service Corporation, New York, N. Y.]"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"American Electric Power Service Corporation, New York, NY, USA","institution_ids":["https://openalex.org/I4401726924"]},{"raw_affiliation_string":"[American Electric Power Service Corporation, New York, N. Y.]","institution_ids":["https://openalex.org/I4401726924"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5068339838","display_name":"Nicholas Tibberts","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I4401726924","display_name":"American Electric Power (United States)","ror":"https://ror.org/040asb018","country_code":"US","type":"company","lineage":["https://openalex.org/I4401726924"]}],"countries":["US"],"is_corresponding":false,"contributor_roles":[],"raw_author_name":"N. Tibberts","raw_affiliation_strings":["American Electric Power Service Corporation, New York, NY, USA","[American Electric Power Service Corporation, New York, N. Y.]"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"American Electric Power Service Corporation, New York, NY, USA","institution_ids":["https://openalex.org/I4401726924"]},{"raw_affiliation_string":"[American Electric Power Service Corporation, New York, N. Y.]","institution_ids":["https://openalex.org/I4401726924"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I4401726924"],"apc_list":null,"apc_paid":null,"fwci":3.7317,"has_fulltext":false,"cited_by_count":11,"reviewed_by_count":0,"citation_normalized_percentile":{"value":0.86917416,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":87,"max":92},"biblio":{"volume":"84","issue":"1","first_page":"64","last_page":"79"},"is_retracted":false,"is_pulled":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11941","display_name":"Power System Reliability and Maintenance","score":0.9634000062942505,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11941","display_name":"Power System Reliability and Maintenance","score":0.9634000062942505,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.03579999879002571,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10305","display_name":"Power System Optimization and Stability","score":0.0003000000142492354,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/power-system-reliability","display_name":"power system reliability","score":0.8420000076293945},{"id":"https://openalex.org/keywords/load-variation","display_name":"load variation","score":0.5529999732971191},{"id":"https://openalex.org/keywords/planned-maintenance","display_name":"planned maintenance","score":0.7850000262260437},{"id":"https://openalex.org/keywords/forced-outages","display_name":"forced outages","score":0.8320000171661377},{"id":"https://openalex.org/keywords/interconnection","display_name":"interconnection","score":0.6890000104904175},{"id":"https://openalex.org/keywords/forced-outage-rate","display_name":"forced outage rate","score":0.6349999904632568}],"concepts":[{"id":"https://openalex.org/C2780945871","wikidata":"https://www.wikidata.org/wiki/Q194274","display_name":"Backup","level":2,"score":0.8791908025741577},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.6661532521247864},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.5780230164527893},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5508537292480469},{"id":"https://openalex.org/C2779370713","wikidata":"https://www.wikidata.org/wiki/Q357554","display_name":"Load management","level":2,"score":0.4491356611251831},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.40723302960395813},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.28660428524017334},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.15833503007888794},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C77088390","wikidata":"https://www.wikidata.org/wiki/Q8513","display_name":"Database","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/tpas.1965.4766109","doi":"https://doi.org/10.1109/tpas.1965.4766109","is_oa":false,"landing_page_url":"https://doi.org/10.1109/tpas.1965.4766109","pdf_url":null,"source":{"id":"https://openalex.org/S35391503","display_name":"IEEE Transactions on Power Apparatus and Systems","issn_l":"0018-9510","issn":["0018-9510"],"is_oa":false,"is_in_doaj":false,"is_core":false,"listed_in":[],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"IEEE Transactions on Power Apparatus and Systems","raw_type":"journal-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.651199996471405,"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure"},{"score":0.5690000057220459,"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy"}],"study_designs":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":11,"referenced_works":["https://openalex.org/W1965278353","https://openalex.org/W1990076738","https://openalex.org/W1994525899","https://openalex.org/W2023044797","https://openalex.org/W2048946155","https://openalex.org/W2055584657","https://openalex.org/W2057295862","https://openalex.org/W2062106028","https://openalex.org/W2068750561","https://openalex.org/W2080065825","https://openalex.org/W4233224058"],"related_works":["https://openalex.org/W2095425215","https://openalex.org/W2518135136","https://openalex.org/W2013021925","https://openalex.org/W2080065825","https://openalex.org/W1996069103","https://openalex.org/W2169000618","https://openalex.org/W2521995382","https://openalex.org/W4255360450","https://openalex.org/W7010208615","https://openalex.org/W1994896269"],"abstract_inverted_index":{"This":[0],"paper":[1],"presents":[2],"a":[3,14,106],"flexible":[4],"easy-to-use":[5],"method":[6],"for":[7],"analyzing":[8],"the":[9,23,38,42,49,53,72,79,84,102],"generating-capacity":[10],"reserve":[11],"requirements":[12],"of":[13,37,44,52,71,74,78,95,101,109],"power":[15],"system.":[16],"The":[17],"approach":[18],"described":[19],"takes":[20],"into":[21],"account":[22],"monthly,":[24],"daily,":[25],"and":[26,41,56,68],"hourly":[27],"variations":[28],"in":[29,76,83],"system":[30,96],"load;":[31],"scheduled":[32],"maintenance":[33],"requirements;":[34],"forced-outage":[35,90],"performance":[36],"generating":[39],"units;":[40],"effect":[43,73],"interruptible":[45],"load":[46,88],"(IL)":[47],"curtailments,":[48],"extra-load":[50],"capability":[51],"generators":[54],"(EL),":[55],"emergency":[57],"backup":[58],"support":[59],"from":[60],"interconnections":[61],"(EB).":[62],"It":[63],"permits":[64],"an":[65],"easy":[66],"qualitative":[67],"quantitative":[69],"evaluation":[70],"change":[75],"any":[77],"basic":[80],"assumptions":[81],"used":[82],"analysis,":[85],"such":[86],"as":[87],"projection,":[89],"rate":[91],"or":[92],"acceptable":[93],"standard":[94],"performance,":[97],"without":[98],"requiring":[99],"repetition":[100],"entire":[103],"calculation":[104],"with":[105],"new":[107],"set":[108],"data.":[110]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W1965712486","counts_by_year":[{"year":2012,"cited_by_count":1}],"updated_date":"2026-11-21T10:27:49.728292","created_date":"2016-06-24T00:00:00"}
