{"id":"https://openalex.org/keywords/total-flow-time","display_name":"total flow time","description":"A scheduling objective that minimizes the sum of the times jobs spend in the system, from release or start until completion.","display_name_alternatives":["total flowtime","sum of flow times","sum of job flow times","summed flow time","aggregate flow time"],"ids":{"openalex":"https://openalex.org/keywords/total-flow-time","wikidata":null},"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9032,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9032,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":544,"cited_by_count":13420,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/total-flow-time","updated_date":"2026-11-17T04:05:58","created_date":"2026-09-30T00:00:00"}
