{"id":"https://openalex.org/keywords/replacement-cycle","display_name":"replacement cycle","description":"The interval or pattern governing when an asset, component, or product is replaced, studied in maintenance and economic planning.","display_name_alternatives":["replacement cycles"],"ids":{"openalex":"https://openalex.org/keywords/replacement-cycle","wikidata":null},"primary_topic":{"id":"https://openalex.org/T10780","display_name":"Reliability and Maintenance Optimization","score":0.2298,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10780","display_name":"Reliability and Maintenance Optimization","score":0.2298,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14138","display_name":"Life Cycle Costing Analysis","score":0.0769,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":106,"cited_by_count":739,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/replacement-cycle","updated_date":"2026-11-24T02:08:15","created_date":"2026-09-30T00:00:00"}
