{"id":"https://openalex.org/keywords/production-rescheduling","display_name":"production rescheduling","description":"The revision of manufacturing plans and job schedules to respond to disruptions, changing priorities, delivery risks, or available resources.","display_name_alternatives":["manufacturing rescheduling","production re-scheduling","rescheduling of production","production schedule revision"],"ids":{"openalex":"https://openalex.org/keywords/production-rescheduling","wikidata":null},"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.6655,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.6655,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":347,"cited_by_count":4886,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/production-rescheduling","updated_date":"2026-11-21T04:06:33","created_date":"2026-09-30T00:00:00"}
