{"id":"https://openalex.org/keywords/optimal-replacement-interval","display_name":"optimal replacement interval","description":"The time interval between scheduled replacements that optimizes cost, reliability, or other performance objectives for maintainable equipment and systems.","display_name_alternatives":["optimal replacement intervals","optimum replacement interval","optimum replacement intervals","optimal interval between replacements"],"ids":{"openalex":"https://openalex.org/keywords/optimal-replacement-interval","wikidata":null},"primary_topic":{"id":"https://openalex.org/T10780","display_name":"Reliability and Maintenance Optimization","score":0.92,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10780","display_name":"Reliability and Maintenance Optimization","score":0.92,"subfield":{"id":"https://openalex.org/subfields/2213","display_name":"Safety, Risk, Reliability and Quality"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":175,"cited_by_count":2798,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/optimal-replacement-interval","updated_date":"2026-11-23T04:07:32","created_date":"2026-09-30T00:00:00"}
