{"id":"https://openalex.org/keywords/makespan-constraint","display_name":"makespan constraint","description":"A makespan constraint is a scheduling requirement that limits the total elapsed time from the start of the first job to completion of the last.","display_name_alternatives":["makespan constraints","constraint on makespan","makespan limit","makespan bound"],"ids":{"openalex":"https://openalex.org/keywords/makespan-constraint","wikidata":null},"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.7772,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.7772,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":99,"cited_by_count":1471,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/makespan-constraint","updated_date":"2026-11-20T04:06:44","created_date":"2026-09-30T00:00:00"}
