{"id":"https://openalex.org/keywords/machine-setup-time","display_name":"machine setup time","description":"Machine setup time is the time required to prepare or reconfigure a machine before it can perform a production task.","display_name_alternatives":["machine set-up time","machine preparation time","machine setting time"],"ids":{"openalex":"https://openalex.org/keywords/machine-setup-time","wikidata":null},"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.3845,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.3845,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13706","display_name":"Management and Optimization Techniques","score":0.2772,"subfield":{"id":"https://openalex.org/subfields/1408","display_name":"Strategy and Management"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}}],"works_count":377,"cited_by_count":1771,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/machine-setup-time","updated_date":"2026-11-25T02:06:04","created_date":"2026-09-30T00:00:00"}
