{"id":"https://openalex.org/keywords/level-scheduling","display_name":"level scheduling","description":"A production and operations-planning method that distributes work or output evenly over time to stabilize schedules and resource use.","display_name_alternatives":["production level scheduling"],"ids":{"openalex":"https://openalex.org/keywords/level-scheduling","wikidata":null},"primary_topic":{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.2296,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.2296,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.1613,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10792","display_name":"Matrix Theory and Algorithms","score":0.1524,"subfield":{"id":"https://openalex.org/subfields/1703","display_name":"Computational Theory and Mathematics"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13706","display_name":"Management and Optimization Techniques","score":0.1398,"subfield":{"id":"https://openalex.org/subfields/1408","display_name":"Strategy and Management"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T10164","display_name":"Quality and Supply Management","score":0.0824,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":111,"cited_by_count":6858,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/level-scheduling","updated_date":"2026-11-25T02:06:04","created_date":"2026-09-30T00:00:00"}