{"id":"https://openalex.org/keywords/graph-based-scheduling","display_name":"graph-based scheduling","description":"A scheduling approach that represents tasks, resources, or conflicts as a graph to determine feasible assignments or execution order.","display_name_alternatives":["graph scheduling"],"ids":{"openalex":"https://openalex.org/keywords/graph-based-scheduling","wikidata":null},"primary_topic":null,"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.0856,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10054","display_name":"Parallel Computing and Optimization Techniques","score":0.0856,"subfield":{"id":"https://openalex.org/subfields/1708","display_name":"Hardware and Architecture"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12401","display_name":"Scheduling and Timetabling Solutions","score":0.0802,"subfield":{"id":"https://openalex.org/subfields/1803","display_name":"Management Science and Operations Research"},"field":{"id":"https://openalex.org/fields/18","display_name":"Decision Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}}],"works_count":164,"cited_by_count":3350,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/graph-based-scheduling","updated_date":"2026-11-28T02:06:46","created_date":"2026-09-30T00:00:00"}
