{"id":"https://openalex.org/keywords/gate-scheduling","display_name":"gate scheduling","description":"The assignment of execution times to quantum circuit gates, coordinating operations with hardware constraints and resource availability.","display_name_alternatives":["quantum circuit gate scheduling","scheduling quantum gates"],"ids":{"openalex":"https://openalex.org/keywords/gate-scheduling","wikidata":null},"primary_topic":{"id":"https://openalex.org/T10682","display_name":"Quantum Computing Algorithms and Architecture","score":0.4346,"subfield":{"id":"https://openalex.org/subfields/1702","display_name":"Artificial Intelligence"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10682","display_name":"Quantum Computing Algorithms and Architecture","score":0.4346,"subfield":{"id":"https://openalex.org/subfields/1702","display_name":"Artificial Intelligence"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11489","display_name":"Air Traffic Management and Optimization","score":0.1672,"subfield":{"id":"https://openalex.org/subfields/2202","display_name":"Aerospace Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":113,"cited_by_count":1388,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/gate-scheduling","updated_date":"2026-11-20T04:06:44","created_date":"2026-09-30T00:00:00"}
