{"id":"https://openalex.org/keywords/first-cost","display_name":"first cost","description":"The initial purchase and installation cost of a product or system, distinguished from its operating and lifetime costs.","display_name_alternatives":["initial purchase and installation cost","first costs"],"ids":{"openalex":"https://openalex.org/keywords/first-cost","wikidata":null},"primary_topic":null,"topics":[{"id":"https://openalex.org/T10121","display_name":"Building Energy and Comfort Optimization","score":0.1343,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11529","display_name":"Refrigeration and Air Conditioning Technologies","score":0.1076,"subfield":{"id":"https://openalex.org/subfields/2210","display_name":"Mechanical Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14138","display_name":"Life Cycle Costing Analysis","score":0.0813,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":232,"cited_by_count":1827,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/first-cost","updated_date":"2026-11-19T04:05:57","created_date":"2026-09-30T00:00:00"}
