{"id":"https://openalex.org/keywords/event-based-scheduling","display_name":"event-based scheduling","description":"A scheduling approach in which tasks or control actions are triggered by events rather than solely by fixed time intervals.","display_name_alternatives":[],"ids":{"openalex":"https://openalex.org/keywords/event-based-scheduling","wikidata":null},"primary_topic":null,"topics":[{"id":"https://openalex.org/T10046","display_name":"Stability and Control of Uncertain Systems","score":0.1634,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12177","display_name":"Resource-Constrained Project Scheduling","score":0.0868,"subfield":{"id":"https://openalex.org/subfields/1803","display_name":"Management Science and Operations Research"},"field":{"id":"https://openalex.org/fields/18","display_name":"Decision Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T11053","display_name":"Process Optimization and Integration","score":0.078,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":130,"cited_by_count":2117,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/event-based-scheduling","updated_date":"2026-11-18T04:07:20","created_date":"2026-09-30T00:00:00"}
