{"id":"https://openalex.org/keywords/due-date-determination","display_name":"due date determination","description":"A production-planning decision method for assigning promised completion dates to jobs or customer orders under scheduling and capacity constraints.","display_name_alternatives":[],"ids":{"openalex":"https://openalex.org/keywords/due-date-determination","wikidata":null},"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.7814,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.7814,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":125,"cited_by_count":2019,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/due-date-determination","updated_date":"2026-11-25T02:06:04","created_date":"2026-09-30T00:00:00"}
