{"id":"https://openalex.org/keywords/cycle-time","display_name":"cycle time","description":"Cycle time is the time required to complete one cycle of a process, operation, or production task in operations and process analysis.","display_name_alternatives":["time per cycle","cycle times","cycle duration"],"ids":{"openalex":"https://openalex.org/keywords/cycle-time","wikidata":null},"primary_topic":null,"topics":[{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.0861,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"works_count":7087,"cited_by_count":73598,"works_api_url":"https://api.openalex.org/works?filter=keywords.id:keywords/cycle-time","updated_date":"2026-11-16T04:05:30","created_date":"2022-04-12T19:38:12"}
